24 core OFC cable,12 core OFC cable,48 port fully loaded LIU,24 port fully loaded LIU,05 meters SM
Airports Authority Of India
Bid Publish Date
09-Jun-2026, 5:42 pm
Bid End Date
23-Jun-2026, 6:00 pm
EMD
₹47,475
Value
₹23,73,774
Location
Progress
Quantity
14436
Category
12 core Single mode Armored OFC Cable
Bid Type
Two Packet Bid
Airports Authority Of India announces a tender for 12 core Single mode Armored OFC Cable, HDPE pipe PLB type 40mm, 24 Port Managed Ethernet Switch with GBIC interface, 24 Port LIU fully loaded with adaptor plates and Pigtails, Wall mount network Rack 9 U 550 depth, OFC Patch cords SC to LC Single Mode 5 Mtrs, OFC 12F Joint Closure, OFC cable Laying - Through underground hdpe through surface chambers at 100M interval, Laying OFC cable through open surface inside ATC building. , Termination of OFC, Installation and commissioning of Network infrastructure and OFC with testing in TUTICORIN, TAMIL NADU. Quantity: 14436. Submission Deadline: 23-06-2026 18: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
12 core Single mode Armored OFC Cable , HDPE pipe PLB type 40mm , 24 Port Managed Ethernet Switch with GBIC interface , 24 Port LIU fully loaded with adaptor plates and Pigtails , Wall mount network Rack 9 U 550 depth , OFC Patch cords SC to LC Single Mode 5 Mtrs , OFC 12F Joint Closure , OFC cable Laying - Through underground hdpe through surface chambers at 100M interval , Laying OFC cable through open surface inside ATC building. , Termination of OFC, Installation and commissioning of Network infrastructure and OFC with testing
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Airports Authority Of India
Ans,finance,hr,engineering,tech,ops,commercial,general Store,it
BHOPAL, MADHYA PRADESH
Indian Navy
VISAKHAPATNAM, ANDHRA PRADESH
Airports Authority Of India
PONDICHERRY, PUDUCHERRY
Airports Authority Of India
DIBRUGARH, ASSAM
Tender Results
Loading results...
12 core Single mode Armored OFC Cable
12 core Single mode Armored OFC Cable
HDPE pipe PLB type 40mm
HDPE pipe PLB type 40mm
24 Port Managed Ethernet Switch with GBIC interface
24 Port Managed Ethernet Switch with GBIC interface
24 Port LIU fully loaded with adaptor plates and Pigtails
24 Port LIU fully loaded with adaptor plates and Pigtails
Wall mount network Rack 9 U 550 depth
Wall mount network Rack 9 U 550 depth
OFC Patch cords SC to LC Single Mode 5 Mtrs
OFC Patch cords SC to LC Single Mode 5 Mtrs
OFC 12F Joint Closure
OFC 12F Joint Closure
OFC cable Laying - Through underground hdpe through surface chambers at 100M interval
OFC cable Laying - Through Hume pipe
Laying OFC cable through open surface inside ATC building.
Laying OFC cable through open surface and wall
Termination of OFC, Installation and commissioning of Network infrastructure and OFC with testing
Termination of OFC(96core Splicing), Installation and commissioning of Network infrastructure and OFC with testing(36core Testing)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 12 core Single mode Armored OFC Cable | 12 core Single mode Armored OFC Cable | 7,500 | meter | [email protected] | 45 | |
| 2 | HDPE pipe PLB type 40mm | HDPE pipe PLB type 40mm | 200 | meter | [email protected] | 45 | |
| 3 | 24 Port Managed Ethernet Switch with GBIC interface | 24 Port Managed Ethernet Switch with GBIC interface | 4 | piece | [email protected] | 45 | |
| 4 | 24 Port LIU fully loaded with adaptor plates and Pigtails | 24 Port LIU fully loaded with adaptor plates and Pigtails | 5 | piece | [email protected] | 45 | |
| 5 | Wall mount network Rack 9 U 550 depth | Wall mount network Rack 9 U 550 depth | 2 | piece | [email protected] | 45 | |
| 6 | OFC Patch cords SC to LC Single Mode 5 Mtrs | OFC Patch cords SC to LC Single Mode 5 Mtrs | 20 | piece | [email protected] | 45 | |
| 7 | OFC 12F Joint Closure | OFC 12F Joint Closure | 4 | piece | [email protected] | 45 | |
| 8 | OFC cable Laying - Through underground hdpe through surface chambers at 100M interval | OFC cable Laying - Through Hume pipe | 6,500 | meter | [email protected] | 45 | |
| 9 | Laying OFC cable through open surface inside ATC building. | Laying OFC cable through open surface and wall | 200 | meter | [email protected] | 45 | |
| 10 | Termination of OFC, Installation and commissioning of Network infrastructure and OFC with testing | Termination of OFC(96core Splicing), Installation and commissioning of Network infrastructure and OFC with testing(36core Testing) | 1 | job | [email protected] | 45 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Hindustan Aeronautics Limited (hal)
📍 BANGALORE, KARNATAKA
Indian Navy
📍 PUNE, MAHARASHTRA
Cochin Shipyard Ltd
📍 ERNAKULAM, KERALA
National Institute Of Technology (nit)
📍 KOZHIKODE, KERALA
Indian Army
📍 LEH, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS