Progress
Quantity
40
Category
Oil Seal
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs) in Ajmer, Rajasthan. Procurement includes multiple automotive components such as Oil Seal, Repair Kit Water Pump Major, Repair Kit, Stud Bolt, Head Light Assembly, Warning Lamp, Fog Lamp Hook, Light Assembly Indicator, Cabin Light, Marker Clearance, Ignition Switch, Switch Push, Hose Rubber Engine Coolant. Estimated value: ₹13,510.00. Quantity adjustments: option to increase/decrease up to 25% of bid quantity during contract; delivery period adjustments per clause. BOQ lists 12 items, but exact quantities are not specified. This tender emphasizes standard-compliant automotive components for military vehicles in a centralized supply context. Unique aspect: option clause affecting delivery timelines and quantity flexibility during contract execution.
Oil Seal
Repair Kit Water Pump Major
Repair Kit
Stud Bolt
Head Light Assembly
Warning Lamp
Fog Lamp Hook
Light Assembly Indicator
Cabin Light
Marker Clearance
Ignition Switch
Switch Push
Hose Rubber Engine Coolant
Estimated value: ₹13,510.00
Delivery period adjustments: minimum 30 days
Quantity variation: up to 25%
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Quantity may be increased or decreased by up to 25% at contract placement and during currency.
Delivery time extensions calculated per increased quantity formula with minimum 30 days.
Submit PAN, GSTIN, cancelled cheque and EFT mandate with bid; failure to submit may lead to rejection.
Not specified in data; bidders should anticipate standard government norms and await official terms.
Delivery period starts from the last date of the original delivery order; extension rules apply for option quantity.
Not detailed; typical government tenders include LD for delays; refer to ATC for specifics.
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Capability to handle up to 25% quantity variation
Compliance with all documents requested in Bid, ATC and Corrigendum
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Oil Seal , Repair Kit Water Pump Major , Repair Kit , Stud Bolt , Head Light Assy , Warning Lamp two Hook Fog Lamp , Light Assy Indicator , Cabin Light , Marker Clearance , Ignition Switch , Switch Push , Hose Rubber Engine Coolant
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
AJMER
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | AJMER | AJMER | - | - | 1 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Oil Seal
Oil Seal
Repair Kit Water Pump Major
Repair Kit Water Pump Major
Repair Kit
Repair Kit
Stud Bolt
Stud Bolt
Head Light Assy
Head Light Assy
Warning Lamp two Hook Fog Lamp
Warning Lamp two Hook Fog Lamp
Light Assy Indicator
Light Assy Indicator
Cabin Light
Cabin Light
Marker Clearance
Marker Clearance
Ignition Switch
Ignition Switch
Switch Push
Switch Push
Hose Rubber Engine Coolant
Hose Rubber Engine Coolant
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Oil Seal | Oil Seal | 1 | nos | [email protected] | 21 | |
| 2 | Repair Kit Water Pump Major | Repair Kit Water Pump Major | 1 | nos | [email protected] | 21 | |
| 3 | Repair Kit | Repair Kit | 1 | nos | [email protected] | 21 | |
| 4 | Stud Bolt | Stud Bolt | 8 | nos | [email protected] | 21 | |
| 5 | Head Light Assy | Head Light Assy | 4 | nos | [email protected] | 21 | |
| 6 | Warning Lamp two Hook Fog Lamp | Warning Lamp two Hook Fog Lamp | 2 | nos | [email protected] | 21 | |
| 7 | Light Assy Indicator | Light Assy Indicator | 4 | nos | [email protected] | 21 | |
| 8 | Cabin Light | Cabin Light | 3 | nos | [email protected] | 21 | |
| 9 | Marker Clearance | Marker Clearance | 2 | nos | [email protected] | 21 | |
| 10 | Ignition Switch | Ignition Switch | 12 | nos | [email protected] | 21 | |
| 11 | Switch Push | Switch Push | 1 | nos | [email protected] | 21 | |
| 12 | Hose Rubber Engine Coolant | Hose Rubber Engine Coolant | 1 | nos | [email protected] | 21 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Any certificates or documents sought in Bid document, ATC and Corrigendum
Technical bid documents and OEM authorizations (if required)
Key insights about RAJASTHAN tender market
To bid for the Indian Army automotive components tender in Ajmer, ensure submission of PAN, GSTIN, cancelled cheque, and EFT mandate. Prepare for up to 25% quantity variation and delivery extensions. Upload all required certificates with the bid, and reference ATC/Corrigendum terms. Verify OEM/brand requirements if specified.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and any certificates listed in the Bid, ATC, and Corrigendum. Prepare OEM authorizations if applicable and ensure technical bid documents are complete before submission.
Delivery terms allow a 25% quantity variation at contract placement and during currency. Delivery time extends based on (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend to the original period per option clause.
BoQ lists 12 items covering components such as oil seals, repair kits, studs, headlight assemblies, warning lamps, fog lamp hooks, lighting indicators, cabin lights, marker clearance devices, ignition switches, push switches, and rubber engine coolant hoses; exact quantities not disclosed.
The tender data lacks explicit standards; bidders should check ATC for any standards like BIS/ISI or ISO, and ensure ISI or IS-related certifications if referenced in official documentation. Prepare to demonstrate compliance with any specified standards during bid evaluation.
The delivery deadline follows the original delivery order date; extended time is calculated for increased quantity, with a minimum extension of 30 days. Confirm delivery timelines in the final contract and monitor any additional time based on quantity changes.
Payment terms are not stated in the available data; typically such contracts use milestone-based or post-delivery payment within 30 days after receipt and acceptance, with possible advance payments as per policy. Confirm exact terms in the contract and ATC.
Eligibility requires submission of PAN, GSTIN, and EFT mandate, along with certificates listed in the Bid/ATC. Vendors must be capable of handling quantity variations up to 25% and meet documentary requirements. Ensure all documents are authenticated and uploaded on time.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS