TenderDekho Logo
Closed GEM

Indian Army LED Wall & Installation Tender for 6W x 4 AH P4 Pixel LED Wall, Controllers and On-site Fabrication 2026

Bid Publish Date

25-Feb-2026, 2:24 pm

Bid End Date

17-Mar-2026, 5:00 pm

Value

₹4

Generate Docs

Progress

Issue25-Feb-2026, 2:24 pm
Corrigendum07-Mar-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

7

Category

Installation of LED wall

Bid Type

Two Packet Bid

Categories 11

Tender Overview

The Indian Army, Department of Military Affairs, seeks delivery and installation of a LED Wall 6W x 4 AH P4 Pixel, LED Video Controller, customised unipole mounting structure, ACP framing, and on-site installation with anti-corrosion painting. Estimated value is not disclosed; the scope encompasses fabrication, on-site mounting, and commissioning in a centralized defense setting. The contract allows up to a 25% quantity variation and extended delivery timelines at contracted rates, with delivery timing calculated from the last delivery order date. This procurement emphasizes robust mounting, corrosion protection, and military-grade integration.

Key Specifications

  • LED Wall 6W x 4 AH P4 Pixel

  • LED Video Controller

  • Customised unipole mounting structure

  • ACP framing

  • On-site fabrication and installation

  • Anti-corrosion painting

Terms & Conditions

  • Key Term 1: Quantity variation up to 25% during order and currency, at contracted rates

  • Key Term 2: Delivery period linked to last delivery order date with minimum 30 days extension

  • Key Term 3: On-site fabrication, anti-corrosion painting and ACP framing included in scope

Bidder Eligibility

  • Demonstrated experience in LED wall installation and mounting structure fabrication

  • Capability to perform on-site fabrication and anti-corrosion coating

  • Compliance with defense procurement norms and standard documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LED Wall 6W x 4 AH P4 Pixel , LED Video Controller , Customised uniplole mounting structure , On site fabrication , Anti corrosion painting , ACP framing , Installation of LED wall

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9043631.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

LED Wall 6W x 4 AH P4 Pixel

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#2

LED Video Controller

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#3

Customised uniplole mounting structure

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#4

On site fabrication

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#5

Anti corrosion painting

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#6

ACP framing

Installation of LED wall Pannel

1 pieces Delivery: 15 days
#7

Installation of LED wall

Installation of LED wall Pannel

1 pieces Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for LED wall installations and on-site fabrication

4

Financial statements (latest audited if available)

5

EMD/Security deposit documentation (if applicable)

6

Technical bid documents and OEM authorizations (if required)

7

Any anti-corrosion coating certification or painter qualification (if specified)

Corrigendum Updates

1 Update
#1

Update

07-Mar-2026

Extended Deadline

13-Mar-2026, 3:00 pm

Opening Date

13-Mar-2026, 3:30 pm

Frequently Asked Questions

Key insights about KERALA tender market

How to bid for the LED wall tender in India Army procurement 2026?

Bidders should prepare technical and financial bids, submit GST and PAN, provide experience certificates for similar LED wall installations, and obtain OEM authorizations if required. Include on-site fabrication capability, anti-corrosion painting plans, and mounting structure design compliant with defense standards. Ensure adherence to the 25% variation clause.

What documents are required for the LED wall installation tender in defense?

Submit GST registration, PAN card, latest audited financials, experience certificates for LED wall projects, OEM authorizations, technical bid documents, and any coating/anti-corrosion certifications. Provide installation methodology and mounting structure drawings as part of the technical bid.

What are the essential technical specifications for the LED wall bid?

Core specs include LED Wall 6W x 4 AH P4 Pixel, LED video controller, customised unipole mounting, ACP framing, anti-corrosion painting, and on-site fabrication. While exact IS/ISO standards aren’t listed, bidders should meet industry best practices for defense installations and ensure controller compatibility.

What is the delivery timeline structure for this LED wall contract?

Delivery starts from the last date of the original delivery order. The option clause permits up to 25% quantity variation at contracted rates. If extended, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

Are there any warranty or penalty clauses mentioned for this LED wall project?

The available data does not specify warranty or liquidated damages. Bidders should seek clarification on post-installation support, warranty period for components, and penalties for delays as per standard defense procurement practices and the option clause.

What are the key eligibility criteria for the LED wall procurement?

Eligibility centers on capability to perform high-precision on-site fabrication, mounting structure fabrication, and anti-corrosion painting. Demonstrate prior defense-related LED installations, provide OEM authorizations if required, and show financial stability with supporting statements.

How should bidders address the on-site fabrication and ACP framing requirements?

Provide detailed fabrication methodologies for unipole mounting and ACP framing, including material specs, coating types, thickness, fasteners, corrosion resistance, and installation sequencing. Include QA/QC plan, site readiness, and transport/assembly logistics for secure defense site entry.

What is the bidding location and scope of supply for the LED wall tender?

The scope covers supply, on-site fabrication, anti-corrosion painting, ACP framing, mounting structure, and installation of LED wall with related controllers. The exact installation site and city are not specified in the data; bidders should confirm the deployment site with the procuring authority.