Bid Publish Date
25-Feb-2026, 2:24 pm
Bid End Date
17-Mar-2026, 5:00 pm
Value
₹4
Location
Progress
Quantity
7
Category
Installation of LED wall
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, seeks delivery and installation of a LED Wall 6W x 4 AH P4 Pixel, LED Video Controller, customised unipole mounting structure, ACP framing, and on-site installation with anti-corrosion painting. Estimated value is not disclosed; the scope encompasses fabrication, on-site mounting, and commissioning in a centralized defense setting. The contract allows up to a 25% quantity variation and extended delivery timelines at contracted rates, with delivery timing calculated from the last delivery order date. This procurement emphasizes robust mounting, corrosion protection, and military-grade integration.
LED Wall 6W x 4 AH P4 Pixel
LED Video Controller
Customised unipole mounting structure
ACP framing
On-site fabrication and installation
Anti-corrosion painting
Key Term 1: Quantity variation up to 25% during order and currency, at contracted rates
Key Term 2: Delivery period linked to last delivery order date with minimum 30 days extension
Key Term 3: On-site fabrication, anti-corrosion painting and ACP framing included in scope
Demonstrated experience in LED wall installation and mounting structure fabrication
Capability to perform on-site fabrication and anti-corrosion coating
Compliance with defense procurement norms and standard documentation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Wall 6W x 4 AH P4 Pixel , LED Video Controller , Customised uniplole mounting structure , On site fabrication , Anti corrosion painting , ACP framing , Installation of LED wall
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
LED Wall 6W x 4 AH P4 Pixel
Installation of LED wall Pannel
LED Video Controller
Installation of LED wall Pannel
Customised uniplole mounting structure
Installation of LED wall Pannel
On site fabrication
Installation of LED wall Pannel
Anti corrosion painting
Installation of LED wall Pannel
ACP framing
Installation of LED wall Pannel
Installation of LED wall
Installation of LED wall Pannel
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | LED Wall 6W x 4 AH P4 Pixel | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 2 | LED Video Controller | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 3 | Customised uniplole mounting structure | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 4 | On site fabrication | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 5 | Anti corrosion painting | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 6 | ACP framing | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 | |
| 7 | Installation of LED wall | Installation of LED wall Pannel | 1 | pieces | gr@stnqd | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for LED wall installations and on-site fabrication
Financial statements (latest audited if available)
EMD/Security deposit documentation (if applicable)
Technical bid documents and OEM authorizations (if required)
Any anti-corrosion coating certification or painter qualification (if specified)
Extended Deadline
13-Mar-2026, 3:00 pm
Opening Date
13-Mar-2026, 3:30 pm
Key insights about KERALA tender market
Bidders should prepare technical and financial bids, submit GST and PAN, provide experience certificates for similar LED wall installations, and obtain OEM authorizations if required. Include on-site fabrication capability, anti-corrosion painting plans, and mounting structure design compliant with defense standards. Ensure adherence to the 25% variation clause.
Submit GST registration, PAN card, latest audited financials, experience certificates for LED wall projects, OEM authorizations, technical bid documents, and any coating/anti-corrosion certifications. Provide installation methodology and mounting structure drawings as part of the technical bid.
Core specs include LED Wall 6W x 4 AH P4 Pixel, LED video controller, customised unipole mounting, ACP framing, anti-corrosion painting, and on-site fabrication. While exact IS/ISO standards aren’t listed, bidders should meet industry best practices for defense installations and ensure controller compatibility.
Delivery starts from the last date of the original delivery order. The option clause permits up to 25% quantity variation at contracted rates. If extended, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The available data does not specify warranty or liquidated damages. Bidders should seek clarification on post-installation support, warranty period for components, and penalties for delays as per standard defense procurement practices and the option clause.
Eligibility centers on capability to perform high-precision on-site fabrication, mounting structure fabrication, and anti-corrosion painting. Demonstrate prior defense-related LED installations, provide OEM authorizations if required, and show financial stability with supporting statements.
Provide detailed fabrication methodologies for unipole mounting and ACP framing, including material specs, coating types, thickness, fasteners, corrosion resistance, and installation sequencing. Include QA/QC plan, site readiness, and transport/assembly logistics for secure defense site entry.
The scope covers supply, on-site fabrication, anti-corrosion painting, ACP framing, mounting structure, and installation of LED wall with related controllers. The exact installation site and city are not specified in the data; bidders should confirm the deployment site with the procuring authority.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS