Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power
Airports Authority Of India
KACHCHH, GUJARAT
Bid Publish Date
29-Nov-2025, 6:27 pm
Bid End Date
09-Dec-2025, 7:00 pm
EMD
₹12,000
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Directorate Of Higher Education, Maharashtra, invites bids for a grid-connected rooftop solar power plant project in Sindhudurg, Maharashtra 416510. Scope covers Design, Supply, Installation, Commissioning and Maintenance of an On-Grid system without battery with a capacity of 200 kW. The procurement uses a modest EMD of ₹12,000 and includes contract-variation allowances up to 25% for quantity or duration. Unique aspects include the absence of battery storage and a maintenance component post-installation, aimed at ensuring reliable solar generation for the Higher Education department.
Key Term 1: EMD ₹12,000 required for bid submission
Key Term 2: 25% variation allowed for quantity/duration before award
Key Term 3: Excess settlement option for invoicing with required documentation
Details to be provided in ATC; bid security required as ₹12,000 EMD; payments aligned to milestones per contract
Turnkey EPC delivery; exact timelines to be defined in contract and ATC
LD provisions to be specified in the contract/ATC; ensure compliance with project timelines
Experience in designing and delivering grid-connected rooftop solar EPC projects
Financial capacity to undertake turnkey installation
Compliance with relevant state and national solar standards (IS/BS/IEC as applicable)
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Airports Authority Of India
KACHCHH, GUJARAT
Hindustan Petroleum Corporation Ltd
BANGALORE, KARNATAKA
Housing And Urban Development Corporation Ltd
JAIPUR, RAJASTHAN
Online Property Tax Management System, Jhansi, Uttar Pradesh
JHANSI, UTTAR PRADESH
National Bank For Agriculture And Ruraldevelopment
KAMRUP, ASSAM
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (similar solar EPC projects)
Financial statements (last 2–3 years)
EMD payment receipt or instrument
Technical bid documents and compliance certificates
OEM authorization letters (if applicable)
Bidder's technical capability and reference installations
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | DRF INNOVATION INDIA PRIVATE LIMITED Under PMA | 06-12-2025 12:44:51 | Disqualified |
| 2 | LOOM SOLAR PRIVATE LIMITED Under PMA | 08-12-2025 16:37:53 | Disqualified |
| 3 | New Raj Electronics Under PMA | 08-12-2025 22:18:27 | Qualified |
| 4 | SHREE CRYOGENIC ENGINEERING WORKS Under PMA | 08-12-2025 16:38:34 | Qualified |
| 5 | SHRISUN SOLAR SOLUTIONS Under PMA | 06-12-2025 13:13:36 | Qualified |
| 6 | SURYODAY SOLAR POWER AND ENTERPRISES Under PMA | 04-12-2025 14:39:41 | Disqualified |
| 7 | WORLDONE ENERGIES PRIVATE LIMITED Under PMA | 08-12-2025 18:35:13 | Disqualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SHRISUN SOLAR SOLUTIONS( MSE Social Category:General ) Under PMA | ₹11,89,125 | Item Categories : Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power |
| L2 | SHREE CRYOGENIC ENGINEERING WORKS( MSE Social Category:General ) Under PMA | ₹11,93,625 | Item Categories : Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power |
| L3 | New Raj Electronics( MSE Social Category:OBC ) Under PMA | ₹11,98,500 | Item Categories : Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power |
Please sign in or create an account to view contract details and download result documents.
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD of ₹12,000 along with technical bid documents. Comply with the 25% variation clause and the excess settlement provision, and ensure the ATC document is uploaded with the bid.
Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD payment proof, technical bid, OEM authorizations if any, and project references demonstrating 200 kW rooftop installations.
System is a grid-connected rooftop solar plant, batteryless, with total capacity 200 kW. No BOQ items are listed; bidders must propose turnkey design, supply, installation, commissioning, and maintenance per ATC terms.
Deadline details are not specified in the data provided. Bidders should verify the official portal and ATC for submission dates and ensure bid validity and security deposits are prepared ahead of time.
Payment terms will be defined in the ATC and contract; typical EPC terms include milestone-based payments with possible advance and post-installation payments, subject to satisfactory delivery and acceptance testing.
The clause allows the buyer to increase or decrease contract quantity or duration by up to 25%, either at bid evaluation or prior to award, requiring bidder acceptance of revised scope.
Penalties or LD provisions will be specified in the contract/ATC; bidders should expect LDs if delivery or performance milestones are missed, with definitions in the final agreement.
Bidders should align with general solar EPC standards, provide OEM authorizations if applicable, and ensure compliance with local procurement policies; IS/IEC standards may be referenced in ATC.