Indian Army invites a procurement exercise in Jodhpur, Rajasthan for the handling of DECK UNIT 18 NOS, including removal from stacking, re-positioning on ground, removal of old paint, and applying 02 coats OG paint plus 01 coat Red oxide. The scope covers removal, painting as per specification, re-stacking under direction of offg BSO oblice GE EP Jodhpur, and associated assembly. The scope is tied to a single, site-specific GE EP Jodhpur location with a five-item BOQ that lists no itemized quantities (N/A), implying a service and installation-focused contract with potential quantity variation under option. The buyer reserves expansion up to 25% of bid quantity during both initial and currency periods, with delivery timing linked to the last delivery order date and a minimum 30-day time extension. The contract includes advance sample approval before bulk manufacturing, and requires supply, installation, testing, commissioning, operator training, and statutory clearances as part of scope. The contract is structured to include the risk of sample-based deviations and potential contract termination for major non-conformance. Deliverables include on-site installation and commissioning at GE EP Jodhpur. This tender emphasizes painting quality, surface preparation, and adherence to direction by the Buyer, with a strong emphasis on workmanship near military assets.
Deck unit handling and placement: 18 NOS
Painting: 02 coats OG paint, 01 coat Red oxide, surface scraping per spec
Scope: Supply, Installation, Testing, Commissioning, Operator Training, Statutory Clearances
Location: GE EP Jodhpur, on-site delivery and commissioning
BOQ: 5 items, quantities not specified (N/A)
Option clause allows +/- 25% quantity change during contract and currency
Advance sample approval required within 5 days of award with modifications if needed
On-site installation, testing, commissioning, and operator training included
Not explicitly specified; bidders should obtain concrete milestones and payment schedule
Delivery period linked to last date of original delivery order; extension rules apply with minimum 30 days
No explicit LD details; bidders must confirm penalties or performance bond terms
Proven experience in deck unit handling or related military equipment painting
Financial stability evidenced by recent financial statements
Capability to perform on-site installation and commissioning at GE EP Jodhpur
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Removing of DECK UNIT 18 NOS from stacking as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 2 | Arranging of DECK UNIT 18 NOS on ground as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 3 | Removing of old loose paint by scratching as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 4 | Applying paint 02 coat of OG paint and 01 coat of Red oxide as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 5 | Re stacking of DECK UNIT 18 NOS as per directed by offg BSO oblice GE EP jodhpur | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar deck unit handling/painting works
Financial statements (last 2-3 years)
EMD submission proof (if required by buyer) and payment details
Technical bid documents and method statement
OEM authorizations (if applicable) and safety certifications
Key insights about RAJASTHAN tender market
Bidders must register with the central procurement portal, submit GSTIN, PAN, and financials, provide experience in similar military painting projects, and include OEM authorizations. Ensure advance sample submission within 5 days of award and readiness for on-site installation at GE EP Jodhpur with required clearances.
Required documents include GST certificate, PAN, 2-3 years financial statements, experience certificates for deck handling/painting, EMD proof if applicable, technical bid, OEM authorizations, and safety certifications. Submit these with the technical bid to participate.
The tender specifies applying 02 coats OG paint and 01 coat Red oxide after surface scraping per specification. Ensure proper surface prep, environmental controls, and compatibility with deck unit materials; adhere to on-site approvals and maintain finish quality.
The option clause allows up to 25% increase or decrease in bid quantity during contract and currency. If exercised, the extension is calculated as ( Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Advance sample must be submitted within 5 days of contract award. The buyer will approve or request modifications within 5 days; bulk supply must follow the approved sample terms; delays in approval may adjust delivery timelines without LD.
Scope includes Supply, Installation, Testing, Commissioning of Deck Unit handling and painting, plus Training of operators and providing Statutory Clearances. All costs are included in the bid price; site installation at GE EP Jodhpur is mandatory.
Delivery and installation occur at GE EP Jodhpur. The contract requires on-site commissioned results, adherence to security clearance procedures, and alignment with Buyer’s direction for deck unit re-stacking and placement.
Unapproved samples can stall bulk production and trigger contract termination after deviations are communicated. If Buyer delays approval, delivery period may be reset; ensure proactive sample submission and rapid modification cycles to avoid schedule slippage.
Nfr Construction
📍 KAMRUP, ASSAM
Hindustan Aeronautics Limited (hal)
📍 BANGALORE, KARNATAKA
Nuclear Power Corporation Of India Limited
📍 CHITTORGARH, RAJASTHAN
Advanced Weapons And Equipment India Limited
Indian Army
📍 JODHPUR, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS