TenderDekho Logo
Closed GEM

Contract Bidding Open For G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand in PURI, ODISHA

Bid Publish Date

02-Dec-2025, 10:24 am

Bid End Date

23-Dec-2025, 11:00 am

EMD

₹10,300

Value

₹5,16,611

Location

Progress

Issue02-Dec-2025, 10:24 am
Technical23-12-2025 09:53:26
Financial
Award08-Feb-2026, 1:17 am
Explore all 4 tabs to view complete tender details

Quantity

1735

Category

G I Street Light Pole

Bid Type

Two Packet Bid

Categories 59

A tender has been published for Directorate General Of Lighthouses And Lightships G I Street Light Pole, 3 Core Copper single strand Armoured UG Cable, Single Core Copper Multi Strand PVC Cable, Supply and fixing of LED Street Light Fittings, Supply and fixing of PVC Junction Box, Single Pole MCB, Supply and fixing of LED Post Top, Supplying and fixing of Main switch fuse unit, PVC Flexible Hose Pipe, Insulation tape, Supply and fixing of Ceramic kit kat fuse unit, Supplying and fixing of DP sheet steel enclosure on surface or recess, Earthing, Supplying and laying 25mm X 5mm GI strip, Labour charges for excavation of trench, G I Channel for MCB fixing, SS Nut bolt and washers, Labour charges for fixing of gate light with GI pipe fixing or grouting and supply connection, G I pipe for fixing gate light, Labour charges including materials, Shifting and re installation of existing solar street light pole with concrete base, Labour charges for Painting of GI street light pole, Labour charges for removing of old PCC base, Re-arrangement of electrical switchgears items in PURI, ODISHA. Quantity: 1735 by. Submission Deadline: 23-12-2025 11: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

G I Street Light Pole , 3 Core Copper single strand Armoured UG Cable , Single Core Copper Multi Strand PVC Cable , Supply and fixing of LED Street Light Fittings , Supply and fixing of PVC Junction Box , Single Pole MCB , Supply and fixing of LED Post Top , Supplying and fixing of Main switch fuse unit , PVC Flexible Hose Pipe , Insulation tape , Supply and fixing of Ceramic kit kat fuse unit , Supplying and fixing of DP sheet steel enclosure on surface or recess , Earthing , Supplying and laying 25mm X 5mm GI strip , Labour charges for excavation of trench , G I Channel for MCB fixing , SS Nut bolt and washers , Labour charges for fixing of gate light with GI pipe fixing or grouting and supply connection , G I pipe for fixing gate light , Labour charges including materials , Shifting and re installation of existing solar street light pole with concrete base , Labour charges for Painting of GI street light pole , Labour charges for removing of old PCC base , Re-arrangement of electrical switchgears items

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYSDIRECTORATE GENERAL OF LIGHTHOUSES AND LIGHTSHIPS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8639342.pdf

Main Document

Scope Of Work Document

SCOPE_OF_WORK

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

G I Street Light Pole

As per specification mentioned in scope of work

15 sets Delivery: 60 days
#2

3 Core Copper single strand Armoured UG Cable

As per specification mentioned in scope of work

500 mtr Delivery: 60 days
#3

Single Core Copper Multi Strand PVC Cable

As per specification mentioned in scope of work

500 mtr Delivery: 60 days
#4

Supply and fixing of LED Street Light Fittings

As per specification mentioned in scope of work

17 no Delivery: 60 days
#5

Supply and fixing of PVC Junction Box

As per specification mentioned in scope of work

18 no Delivery: 60 days
#6

Single Pole MCB

As per specification mentioned in scope of work

18 no Delivery: 60 days
#7

Supply and fixing of LED Post Top

As per specification mentioned in scope of work

2 no Delivery: 60 days
#8

Supplying and fixing of Main switch fuse unit

As per specification mentioned in scope of work

1 no Delivery: 60 days
#9

PVC Flexible Hose Pipe

As per specification mentioned in scope of work

20 mtr Delivery: 60 days
#10

Insulation tape

As per specification mentioned in scope of work

20 no Delivery: 60 days
#11

Supply and fixing of Ceramic kit kat fuse unit

As per specification mentioned in scope of work

2 no Delivery: 60 days
#12

Supplying and fixing of DP sheet steel enclosure on surface or recess

As per specification mentioned in scope of work

2 no Delivery: 60 days
#13

Earthing

As per specification mentioned in scope of work

1 set Delivery: 60 days
#14

Supplying and laying 25mm X 5mm GI strip

As per specification mentioned in scope of work

10 mtr Delivery: 60 days
#15

Labour charges for excavation of trench

As per specification mentioned in scope of work

500 rmt Delivery: 60 days
#16

G I Channel for MCB fixing

As per specification mentioned in scope of work

3 no Delivery: 60 days
#17

SS Nut bolt and washers

As per specification mentioned in scope of work

50 no Delivery: 60 days
#18

Labour charges for fixing of gate light with GI pipe fixing or grouting and supply connection

As per specification mentioned in scope of work

2 no Delivery: 60 days
#19

G I pipe for fixing gate light

As per specification mentioned in scope of work

2 mtr Delivery: 60 days
#20

Labour charges including materials

As per specification mentioned in scope of work

15 no Delivery: 60 days
#21

Shifting and re installation of existing solar street light pole with concrete base

As per specification mentioned in scope of work

5 no Delivery: 60 days
#22

Labour charges for Painting of GI street light pole

As per specification mentioned in scope of work

23 no Delivery: 60 days
#23

Labour charges for removing of old PCC base

As per specification mentioned in scope of work

8 no Delivery: 60 days
#24

Re-arrangement of electrical switchgears items

As per specification mentioned in scope of work

1 ls Delivery: 60 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
DARE TECH   Under PMA
-23-12-2025 09:53:26
2
LOKENATH ENTERPRISE   Under PMA
-21-12-2025 15:06:07
3
S.P ENGINEERING   Under PMA
-22-12-2025 13:13:28
4
saleSmarts   Under PMA
-23-12-2025 06:16:00
5
SANLEC AUTOMATION PRIVATE LIMITED   Under PMA
-20-12-2025 12:45:06
6
SUJATA ENTERPRISES   Under PMA
-21-12-2025 19:40:10

Financial Results

Rank Seller Price Item
L1
LOKENATH ENTERPRISE(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand
L2
SUJATA ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand
L3
S.P ENGINEERING (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand
L4
DARE TECH (MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.