Organization: Bokaro Steel Plant (Steel Authority of India Limited), located in BOKARO, JHARKHAND. Procurement targets a pump assembly with motor for handling waste liquor (WPL). Delivery must be completed within 150 days after PO. No BOQ items listed, suggesting a focused equipment supply. Vendors must be registered under SAIL tender processes and ensure GST compliance. The ATC emphasizes OEM authorization for distributors and strict invoice GST requirements. The absence of itemized quantities indicates a potentially variable scope based on project needs. Unique terms include contract termination rights for non-delivery and mandatory vendor registration for participation. This tender demands precise adherence to GST and invoicing procedures, with a clear delivery timeline and supplier accountability.
Product category: Pump assembly with motor for handling waste liquor
Delivery: 150 days after PO placement
Location: Bokaro, Jharkhand
BOQ: No items listed; scope appears to be equipment supply only
Compliance: OEM authorization for distributors; GST invoicing as per consignee
Delivery schedule of 150 days post-PO and ATC-driven contract termination rights
GST compliance with consignee invoicing and portal proof of payment
OEM authorization for distributors; mandatory SAIL vendor registration
GST reimbursement as per actuals or quoted rate (whichever is lower); invoice to be raised in consignee name with GSTIN; GST payment proof uploaded on GeM portal
Items to be supplied within 150 days after placement of Purchase Order; non-delivery grounds may trigger contract termination
Malpractice or non-performance may lead to termination and potential penalties per ATC; LD terms not explicitly quantified in available data
Must be registered vendor with SAIL and complete vendor registration
OEM Authorization required for authorized distributors
GST compliant with consignee GSTIN invoicing and portal GST payment proof
Quantity
9
Category
PUMP ASSLY WITH MOTOR
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
PUMP F/HANDLING WASTE LIQUOR (WPL) , PUMP ASSLY WITH MOTOR
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
150
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kunal Kumar | 827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, Jharkhand | Bokaro | Jharkhand | 827001 | 3 | 150 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
24-Oct-2026, 1:30 pm
Opening Date
25-Oct-2026, 1:30 pm
GST registration certificate
PAN card details
Experience certificates in similar pump assemblies or wastewater handling equipment
Financial statements demonstrating financial stability
EMD documentation (if applicable) and payment terms
OEM Manufacturer Authorization for authorized distributors
Technical bid documents and product compliance certificates (if available)
OEM authorizations or service provider details with contact information
GST invoice format sample and consignee GSTIN details
GeM portal GST payment screenshot
Key insights about JHARKHAND tender market
Bidders must complete SAIL vendor registration, obtain OEM authorization if submitting through distributors, and ensure GST compliance. Prepare GSTIN details, PAN, experience certificates for wastewater equipment, and GeM invoice proofs. The delivery timeline is 150 days post-PO; ensure all documentation aligns with ATC terms.
Submit GST registration, PAN card, experience certificates for similar pumps, financial statements, OEM authorization (if applicable), technical bid, and GeM invoice proof with GST payment screenshot. Include consignee name and GSTIN on the invoice and register with SAIL vendor portal.
Delivery must occur within 150 days after PO placement. Ensure production readiness and on-time shipping to Bokaro, Jharkhand. Delays may trigger contract termination per ATC terms; monitor production milestones against the PO schedule.
Invoices must be raised in the consignee name with the consignee GSTIN. Upload scanned GST invoices and a GST portal payment screenshot on GeM. GST reimbursement follows actuals or quoted rate, whichever is lower, subject to bidder quoting GST.
Yes. If submitting through authorized distributors, provide Manufacturer/OEM Authorization detailing name, designation, address, email, and phone. This ensures compliance with the OEM authorization requirement and helps validate supply capability for the pump assembly.
The buyer may terminate the contract with written notice for material term non-compliance, delivery failure, or misrepresentation. Additional penalties or remedial actions may apply per ATC. Maintain transparent communication and adhere to all terms to avoid termination.
No BOQ items are listed, indicating an equipment supply scope without specified quantities. Bidders should confirm the exact pump assembly and motor specifications with SAIL procurement and prepare a compliant bid reflecting OEM capabilities and delivery readiness.