Key Highlights

  • Quantity adjustment up to 25% during and after contract; carefully plan inventory and delivery schedules
  • ATC-driven requirements: photos, catalogue, dimensions, and compatibility documentation in technical bid
  • Mandatory adherence to ATC clauses: FALL CLAUSE, PRICE REASONABILITY CERTIFICATE, EMD, CPG
  • Delivery schedule contingent on last delivery order date; extended period triggered by option quantity

Tender Overview

Organization: North Eastern Electric Power Corporation Limited (NEEPCO). The procurement target is Backhoe Loaders (V3) (Q2). No BOQ items or specifications are listed, and the project location is not specified. The tender describes an option clause allowing up to 25% quantity variation during contract execution with corresponding delivery-time calculations. The ATC and ATC-attached bid document must be reviewed, and bidders must provide material details, dimensions, and compatibility in the technical bid. No estimated value or EMD is disclosed. The scope emphasizes adherence to detailed bid document terms and compliance with corporate procurement policies. Unique aspects include the extensive option-quantity mechanism and required pre-submission review of uploaded ATC.

Key Specifications

  • Backhoe Loaders (V3) – Q2 category

  • Qualification requires detailed material data with photos and specifications

  • EMD and detailed payment terms to be provided per ATC

  • Delivery schedule linked to original order; option quantity impacts timelines

Terms & Conditions

  • Option Clause: up to 25% quantity increase/decrease at contract time

  • ATC governs payment terms, EMD, and warranty/CPG requirements

  • Submit material details (photos, catalogue, dimensions) in technical bid

Important Clauses

Payment Terms

Defined in ATC; exact percentages and milestone payments to be confirmed in bidder's submission

Delivery Schedule

Delivery period starts from last date of original order; extended time follows option-quantity rules with minimum 30 days

Penalties/Liquidated Damages

Penalties, if any, to be detailed in ATC; refer to detailed bid document for LD rates

Bidder Eligibility

  • Must review and comply with ATC and Qualifying Requirements

  • Provide material photographs, catalogue, dimensions in technical bid

  • Submit EMD and other financial/documents as per ATC

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

20

OEM Avg. Turnover

150

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Backhoe Loaders (V3) (Q2)

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

West Kameng

Delivery Pincodes

790114

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mrigendra Phukan790114,Kameng Hydro Power Station Kimi, West KamengWest KamengArunachal Pradesh790114130-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9683133.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

1 Update
#1

Update

04-Aug-2026

Extended Deadline

22-Aug-2026, 4:30 am

Opening Date

22-Aug-2026, 5:00 am

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar backhoe loaders or heavy equipment

4

Financial statements or turnover evidence as required by ATC

5

EMD documents as specified in ATC

6

Technical bid documents including photographs, catalogue, dimensions, and compatibility details

7

OEM authorization or dealership certificates as applicable per ATC

8

Any corporate performance guarantee or warranty/AMC commitments per ATC

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for backhoe loaders tender in Guwahati Assam 2026

Bidders must download the detailed bid document and ATC, submit the technical bid with photographs, catalogue, dimensions, and compatibility details for the offered backhoe loader, and ensure EMD is paid as specified. Review option-quantity terms (up to 25%) and delivery-time calculations to align with contract timelines.

What documents are required for North Eastern Electric Power backhoe bid 2026

Required documents include GST registration, PAN card, prior experience certificates for similar loaders, financial statements, EMD proof, technical bid materials (photos, catalogue, specifications), and OEM authorizations if applicable per ATC. Ensure all documents align with Qualifying Requirements in ATC.

What are the delivery terms for the backhoe loader procurement 2026

Delivery begins from the last date of the original delivery order. If the order quantity increases by up to 25%, the additional delivery time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extended periods may apply per option clause.

What is the role of ATC in this NEEPCO tender 2026

ATC governs critical terms including payment terms, EMD, FALL CLAUSE, PRICE REASONABILITY CERTIFICATE, and Corporate Performance Guarantee. Bidders must download and reference ATC to ensure all terms are met in the technical bid and financial bid where applicable.

What standards or certifications are required for the backhoe loader tender

Specific standards are not listed in the data; bidders must consult the ATC for exact certification requirements and compatibility; ensure any OEM authorizations or quality certificates are included in the technical bid as per ATC.

When is the bid deadline for the NEEPCO backhoe loader tender 2026

The start and end dates are not provided in the basic details. Bidders should refer to the detailed bid document and ATC, which contain the official submission deadlines and delivery milestones.