Contract Bidding Open For OH of Main steam line valve V2 6,OH of Steam by pass valve V2 27,15, and V2 7,OH of ES 3,4,5,6 and in SONBHADRA, UTTAR PRADESH

Bid Publish Date

27-May-2026, 4:41 pm

Bid End Date

31-Jul-2026, 1:00 pm

EMD

₹15,000

Value

₹14,56,902

Generate Docs

Progress

Issue27-May-2026, 4:41 pm
Corrigendum10-Jul-2026
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

55993

Category

OH of Main steam line valve V2 6

Bid Type

Two Packet Bid

Categories 47

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow invites bids for OH of Main steam line valve V2 6, OH of Steam by pass valve V2 27, 15, and V2 7, OH of ES 3, 4, 5, 6 and 7, OH of V2 -82-84 and V2-81-A to 81C, OH of HD-21, HD-29, HD-30 and HD-31, OH of NRV of H. P. Heater and feed pump, OH of Group protection valve of HPH, OH of DW-4, 37, 38, 39, 40, 41 and CA 5, OH of CST Makeup valve V6 60, OH of AS-48 valve, OH of NRV of extraction line ES-8, OH of suction valve of BFP, OH Condensate wtr throw off valve to condenser, OH throw off valve to cond and steam isolating of LPH2, OH of Steam isolating valve of LPH 3, 4, OH of Safety valve of aux PRDS or deaerator, OH of Safety valve of H. P. heater, OH of Safety valve of L. P. heater. , OH of Safety valve of CBD tank. , OH of Safety valve of flange or stud heatng, OH of Safety valve of warm up line. , Overhauling of actutator of AS 48 Valve, OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84, OH of Actr of V2 7 or V2 15 or V2 27, OH of Actr Drip line valve and ext line valve, OH of Actr Valve connected to condenser, OH of Actr CST make valve, OH of Actr of MSV L and R, OH of Actr of steam isolating valve to LPH2 to 4, OH of Actr steam throw off valve to condenser, CUT or WELD or REPL OF HP VALVE 15 to 50mm, CUT or WELD or REPL OF HP VALVE 51 to 100mm, CUT or WELD or REPL OF H P VALVE 101 to 150mm, OH of butterfly valve of condenser, OH of dea and FST with internal painting, Repair or replacement of broken hanger, Tightening of loose hangers, CUT or WELD or REPL OF L. P. VALVE 15 to 50mm, CUT or WELD or REPL OF L. P. VALVE 51 to 100mm, CUT or WELD or JOINT OF H. P. PIPE 15 to 50mm, CUT or WELD or JOINT OF H. P. PIPE 51 to 100mm, CUT or WELD or JOINT OF H. P. PIPE 101 to 150mm, CUT or WELD or JOINT OF H. P. PIPE 151 to 300mm, Lift or straight APRDS hdr by cutting weldding, O H of LPH 1A, 1B, O H of LPH 2 3 and 4, OH and attend flange leakage of GC I or II, Clean of turbine oil or H2 Gas Cooler str, REPL OF DAMAGED SP. Valve V2 38, REPL OF DAMAGED SPECIAL VALVE V2 27, OH of turbine oil coolers, OH of main ejectors of turbine, OH of H. P. Heater, OH of LCV 3to15PCV-5, 14, 16, 17, TCV 8, Repl bend of LP drip connected to Drip pump or Condenser, Cut damaged bend of HPH drip cont to dea, CUT WELD or REPL OF H. P. VALVE 151 to 300mm, Blank of CRH line for HT and normalizing, OH of H. P. Valve NRV in H. P. Line, OH of L. P. Valve NRV, OH of energy absorber of BFP, OH of DSS of Aux. PRDS. , 2coat paint BCW, clr, BFP, CEP, Drip pump and LINE, 2coat paint CST, BCW pump, SWC tank, LINE, valve, 2coat paint Hcplg, SW, BCW, CW exc CLR line, 2coat paint Air washer sys, CEP or phos orhyd, 2coat Spray paint syn super enamel LPC, 2coat Spray paint front ped, barring gear, 2coat Spray paint brg and housing turbine, 2coat Spray paint Cntl valve casing, 2coat Spray paint Condenser and line, 2coat Spray paint Main oil tank, 2coat Spray paint Main ejector, 2coat Spray paint Centrifuging machine, 2coat Spray paint Lube oil cooler, Letter writing 2 inch size dia in SONBHADRA, UTTAR PRADESH. Quantity: 55993. Submission Deadline: 31-07-2026 13: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

OH of Main steam line valve V2 6 , OH of Steam by pass valve V2 27,15, and V2 7 , OH of ES 3,4,5,6 and 7 , OH of V2 -82-84 and V2-81-A to 81C , OH of HD-21, HD-29, HD-30 and HD-31 , OH of NRV of H.P. Heater and feed pump , OH of Group protection valve of HPH , OH of DW-4, 37,38,39,40,41 and CA 5 , OH of CST Makeup valve V6 60 , OH of AS-48 valve , OH of NRV of extraction line ES-8 , OH of suction valve of BFP , OH Condensate wtr throw off valve to condenser , OH throw off valve to cond and steam isolating of LPH2 , OH of Steam isolating valve of LPH 3, 4 , OH of Safety valve of aux PRDS or deaerator , OH of Safety valve of H.P. heater , OH of Safety valve of L.P. heater. , OH of Safety valve of CBD tank. , OH of Safety valve of flange or stud heatng , OH of Safety valve of warm up line. , Overhauling of actutator of AS 48 Valve , OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84 , OH of Actr of V2 7 or V2 15 or V2 27 , OH of Actr Drip line valve and ext line valve , OH of Actr Valve connected to condenser , OH of Actr CST make valve , OH of Actr of MSV L and R , OH of Actr of steam isolating valve to LPH2 to 4 , OH of Actr steam throw off valve to condenser , CUT or WELD or REPL OF HP VALVE 15 to 50mm , CUT or WELD or REPL OF HP VALVE 51 to 100mm , CUT or WELD or REPL OF H P VALVE 101 to 150mm , OH of butterfly valve of condenser , OH of dea and FST with internal painting , Repair or replacement of broken hanger , Tightening of loose hangers , CUT or WELD or REPL OF L.P. VALVE 15 to 50mm , CUT or WELD or REPL OF L.P. VALVE 51 to 100mm , CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm , CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm , CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm , CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm , Lift or straight APRDS hdr by cutting weldding , O H of LPH 1A , 1B , O H of LPH 2 3 and 4 , OH and attend flange leakage of GC I or II , Clean of turbine oil or H2 Gas Cooler str , REPL OF DAMAGED SP. Valve V2 38 , REPL OF DAMAGED SPECIAL VALVE V2 27 , OH of turbine oil coolers , OH of main ejectors of turbine , OH of H.P. Heater , OH of LCV 3to15PCV-5, 14,16,17,TCV 8 , Repl bend of LP drip connected to Drip pump or Condenser , Cut damaged bend of HPH drip cont to dea , CUT WELD or REPL OF H.P. VALVE 151 to 300mm , Blank of CRH line for HT and normalizing , OH of H.P. Valve NRV in H.P. Line , OH of L.P. Valve NRV , OH of energy absorber of BFP , OH of DSS of Aux. PRDS. , 2coat paint BCW,clr,BFP,CEP,Drip pump and LINE , 2coat paint CST,BCW pump ,SWC tank,LINE,valve , 2coat paint Hcplg,SW,BCW,CW exc CLR line , 2coat paint Air washer sys,CEP or phos orhyd , 2coat Spray paint syn super enamel LPC , 2coat Spray paint front ped,barring gear , 2coat Spray paint brg and housing turbine , 2coat Spray paint Cntl valve casing , 2coat Spray paint Condenser and line , 2coat Spray paint Main oil tank , 2coat Spray paint Main ejector , 2coat Spray paint Centrifuging machine , 2coat Spray paint Lube oil cooler , Letter writing 2 inch size dia

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Subodh Kumar Dwivedi231219,Obra Thermal Power PlantSonbhadraUttar Pradesh231219230-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9337677.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 76 Items Sign in for GEM prices

#1

OH of Main steam line valve V2 6

OH of Main steam line valve V2 6

2 ea Delivery: 30 days
#2

OH of Steam by pass valve V2 27,15, and V2 7

OH of Steam by pass valve V2 27,15, and V2 7

6 ea Delivery: 30 days
#3

OH of ES 3,4,5,6 and 7

OH of ES 3,4,5,6 and 7

5 ea Delivery: 30 days
#4

OH of V2 -82-84 and V2-81-A to 81C

OH of V2 -82-84 and V2-81-A to 81C

6 ea Delivery: 30 days
#5

OH of HD-21, HD-29, HD-30 and HD-31

OH of HD-21, HD-29, HD-30 and HD-31

4 ea Delivery: 30 days
#6

OH of NRV of H.P. Heater and feed pump

OH of NRV of H.P. Heater and feed pump

4 ea Delivery: 30 days
#7

OH of Group protection valve of HPH

OH of Group protection valve of HPH

1 ea Delivery: 30 days
#8

OH of DW-4, 37,38,39,40,41 and CA 5

OH of DW-4, 37,38,39,40,41 and CA 5

7 ea Delivery: 30 days
#9

OH of CST Makeup valve V6 60

OH of CST Makeup valve V6 60

1 ea Delivery: 30 days
#10

OH of AS-48 valve

OH of AS-48 valve

1 ea Delivery: 30 days
#11

OH of NRV of extraction line ES-8

OH of NRV of extraction line ES-8

1 ea Delivery: 30 days
#12

OH of suction valve of BFP

OH of suction valve of BFP

3 ea Delivery: 30 days
#13

OH Condensate wtr throw off valve to condenser

OH Condensate wtr throw off valve to condenser

2 ea Delivery: 30 days
#14

OH throw off valve to cond and steam isolating of LPH2

OH throw off valve to cond and steam isolating of LPH2

3 ea Delivery: 30 days
#15

OH of Steam isolating valve of LPH 3, 4

OH of Steam isolating valve of LPH 3, 4

2 ea Delivery: 30 days
#16

OH of Safety valve of aux PRDS or deaerator

OH of Safety valve of aux PRDS or deaerator

2 ea Delivery: 30 days
#17

OH of Safety valve of H.P. heater

OH of Safety valve of H.P. heater

8 ea Delivery: 30 days
#18

OH of Safety valve of L.P. heater.

OH of Safety valve of L.P. heater.

3 ea Delivery: 30 days
#19

OH of Safety valve of CBD tank.

OH of Safety valve of CBD tank.

1 ea Delivery: 30 days
#20

OH of Safety valve of flange or stud heatng

OH of Safety valve of flange or stud heatng

4 ea Delivery: 30 days
#21

OH of Safety valve of warm up line.

OH of Safety valve of warm up line.

3 ea Delivery: 30 days
#22

Overhauling of actutator of AS 48 Valve

Overhauling of AS 48 Valve

1 ea Delivery: 30 days
#23

OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84

OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84

6 ea Delivery: 30 days
#24

OH of Actr of V2 7 or V2 15 or V2 27

OH of Actr of V2 7 or V2 15 or V2 27

6 ea Delivery: 30 days
#25

OH of Actr Drip line valve and ext line valve

OH of Actr Drip line valve and ext line valve

9 ea Delivery: 30 days
#26

OH of Actr Valve connected to condenser

OH of Actr Valve connected to condenser

9 ea Delivery: 30 days
#27

OH of Actr CST make valve

OH of Actr CST make valve

1 ea Delivery: 30 days
#28

OH of Actr of MSV L and R

OH of Actr of MSV L and R

2 ea Delivery: 30 days
#29

OH of Actr of steam isolating valve to LPH2 to 4

OH of Actr of steam isolating valve to LPH2 to 4

3 ea Delivery: 30 days
#30

OH of Actr steam throw off valve to condenser

OH of Actr steam throw off valve to condenser

2 ea Delivery: 30 days
#31

CUT or WELD or REPL OF HP VALVE 15 to 50mm

CUT or WELD or REPL OF HP VALVE 15 to 50mm

15 ea Delivery: 30 days
#32

CUT or WELD or REPL OF HP VALVE 51 to 100mm

CUT or WELD or REPL OF HP VALVE 51 to 100mm

2 ea Delivery: 30 days
#33

CUT or WELD or REPL OF H P VALVE 101 to 150mm

CUT or WELD or REPL OF H P VALVE 101 to 150mm

2 ea Delivery: 30 days
#34

OH of butterfly valve of condenser

OH of butterfly valve of condenser

4 ea Delivery: 30 days
#35

OH of dea and FST with internal painting

OH of dea and FST with internal painting

1 ea Delivery: 30 days
#36

Repair or replacement of broken hanger

Repair or replacement of broken hanger.

25 ea Delivery: 30 days
#37

Tightening of loose hangers

Tightening of loose hangers.

20 ea Delivery: 30 days
#38

CUT or WELD or REPL OF L.P. VALVE 15 to 50mm

CUT or WELD or REPL OF L.P. VALVE 15 to 50mm

10 ea Delivery: 30 days
#39

CUT or WELD or REPL OF L.P. VALVE 51 to 100mm

CUT or WELD or REPL OF L.P. VALVE 51 to 100mm

5 ea Delivery: 30 days
#40

CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm

CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm

20 ea Delivery: 30 days
#41

CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm

CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm

20 ea Delivery: 30 days
#42

CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm

CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm

4 ea Delivery: 30 days
#43

CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm

CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm

4 ea Delivery: 30 days
#44

Lift or straight APRDS hdr by cutting weldding

Lift or straight APRDS hdr by cutting weldding

1 ea Delivery: 30 days
#45

O H of LPH 1A , 1B

O H of LPH 1A , 1B

2 ea Delivery: 30 days
#46

O H of LPH 2 3 and 4

O H of LPH 2 3 and 4

3 ea Delivery: 30 days
#47

OH and attend flange leakage of GC I or II

OH and attend flange leakage of GC I or II

2 ea Delivery: 30 days
#48

Clean of turbine oil or H2 Gas Cooler str

Clean of turbine oil or H2 Gas Cooler str

4 ea Delivery: 30 days
#49

REPL OF DAMAGED SP. Valve V2 38

REPL OF DAMAGED SP. Valve V2 38

1 ea Delivery: 30 days
#50

REPL OF DAMAGED SPECIAL VALVE V2 27

REPL OF DAMAGED SPECIAL VALVE V2 27

1 ea Delivery: 30 days
#51

OH of turbine oil coolers

OH of turbine oil coolers

5 ea Delivery: 30 days
#52

OH of main ejectors of turbine

OH of main ejectors of turbine

2 ea Delivery: 30 days
#53

OH of H.P. Heater

OH of H.P. Heater

1 ea Delivery: 30 days
#54

OH of LCV 3to15PCV-5, 14,16,17,TCV 8

OH of LCV 3to15PCV-5, 14,16,17,TCV 8

10 ea Delivery: 30 days
#55

Repl bend of LP drip connected to Drip pump or Condenser

Repl bend of LP drip connected to Drip pump or Condenser

10 ea Delivery: 30 days
#56

Cut damaged bend of HPH drip cont to dea

Cut damaged bend of HPH drip cont to dea

15 ea Delivery: 30 days
#57

CUT WELD or REPL OF H.P. VALVE 151 to 300mm

CUT WELD or REPL OF H.P. VALVE 151 to 300mm

2 ea Delivery: 30 days
#58

Blank of CRH line for HT and normalizing

Blank of CRH line for HT and normalizing

2 ea Delivery: 30 days
#59

OH of H.P. Valve NRV in H.P. Line

OH of H.P. Valve NRV in H.P. Line

12,000 mm Delivery: 30 days
#60

OH of L.P. Valve NRV

OH of L.P. Valve NRV

38,000 mm Delivery: 30 days
#61

OH of energy absorber of BFP

OH of energy absorber of BFP

3 ea Delivery: 30 days
#62

OH of DSS of Aux. PRDS.

OH of DSS of Aux. PRDS.

1 ea Delivery: 30 days
#63

2coat paint BCW,clr,BFP,CEP,Drip pump and LINE

2coat paint BCW,clr,BFP,CEP,Drip pump and LINE

2,250 m2 Delivery: 30 days
#64

2coat paint CST,BCW pump ,SWC tank,LINE,valve

2coat paint CST,BCW pump ,SWC tank,LINE,valve

500 m2 Delivery: 30 days
#65

2coat paint Hcplg,SW,BCW,CW exc CLR line

2coat paint Hcplg,SW,BCW,CW exc CLR line

250 m2 Delivery: 30 days
#66

2coat paint Air washer sys,CEP or phos orhyd

2coat paint Air washer sys,CEP or phos or hyd coupling

250 m2 Delivery: 30 days
#67

2coat Spray paint syn super enamel LPC

2coat Spray paint syn super enamel LPC

315 m2 Delivery: 30 days
#68

2coat Spray paint front ped,barring gear

2coat Spray paint front ped,barring gear

15 m2 Delivery: 30 days
#69

2coat Spray paint brg and housing turbine

2coat Spray paint brg and housing turbine

30 m2 Delivery: 30 days
#70

2coat Spray paint Cntl valve casing

2coat Spray paint Cntl valve casing

55 m2 Delivery: 30 days
#71

2coat Spray paint Condenser and line

2coat Spray paint Condenser and line

616 m2 Delivery: 30 days
#72

2coat Spray paint Main oil tank

2coat Spray paint Main oil tank

96 m2 Delivery: 30 days
#73

2coat Spray paint Main ejector

2coat Spray paint Main ejector

11 m2 Delivery: 30 days
#74

2coat Spray paint Centrifuging machine

2coat Spray paint Centrifuging machine

5 m2 Delivery: 30 days
#75

2coat Spray paint Lube oil cooler

2coat Spray paint Lube oil cooler

45 m2 Delivery: 30 days
#76

Letter writing 2 inch size dia

Letter writing 2 inch size dia

1,250 ea Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

5 Updates
#1

Update

10-Jul-2026

Extended Deadline

31-Jul-2026, 1:00 pm

Opening Date

31-Jul-2026, 1:30 pm

#2

Update

07-Jul-2026

Extended Deadline

22-Jul-2026, 1:00 pm

Opening Date

22-Jul-2026, 1:30 pm

#3

Update

01-Jul-2026

Extended Deadline

08-Jul-2026, 1:00 pm

Opening Date

08-Jul-2026, 1:30 pm

#4

Update

24-Jun-2026

Extended Deadline

01-Jul-2026, 1:00 pm

Opening Date

01-Jul-2026, 1:30 pm

#5

Update

17-Jun-2026

Extended Deadline

24-Jun-2026, 1:00 pm

Opening Date

24-Jun-2026, 1:30 pm