Bid Publish Date
17-Oct-2026, 4:53 pm
Bid End Date
27-Oct-2026, 5:00 pm
Location
Progress
Purvanchal Vidyut Vitaran Nigam Limited (Varanasi) invites bids for a broad category of power transformer components, including Lug, HT Bushing Rod, Copper Z Clamp, F Clamp, LT Bushing Rod, U Clamp for HT/LT PCC poles, LT/HT fuses, and related oil seals and packing. The procurement covers 16 items with undefined quantities, located in Allahabad, Uttar Pradesh (210010). The contract contemplates a flexible quantity policy: up to 25% additional quantity at contracted rates during or after delivery, with delivery periods adjusted per the option clause. The bid requires turnover and financial health verification per ATC. This opportunity targets suppliers capable of meeting multi-item electrical component requirements under UP energy procurement norms.
Option clause allows 25% quantity variation during contract and currency
Turnover and financial stability must be demonstrated via audited statements or CA certificate
Delivery period adjustments hinge on original and extended periods with minimum 30 days
Not specified in data; confirm exact terms in ATC and purchase order
Delivery starts from last date of original delivery order; extended period follows option clause with calculated time and minimum 30 days
Not detailed here; bidders must verify LD/penalties in ATC
Not under liquidation, court receivership, or bankruptcy
Minimum average turnover as defined in bid document (last 3 financial years)
Experience in supplying electrical hardware for transformers/ poles
OEM authorization and GST compliance
Quantity
5200
Category
Lug
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Lug , HT Bushing Rod , Copper Z Clamp For Power TF , F Clamp , LT Bushing Rod , Lt Bushing Rod , Z Clamp For 400 Kva TF , L.T. Fuse , H.T. Fuse , U Clamp Suitable For Ht Lt Pcc Pole , U Clamp Suitable For Stp Pcc Pole , Various Size Oil Seal and Packing For Transformers
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Prayagraj
Delivery Pincodes
211002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Radhey Shyam | 211002,Office of SE EDC 1, 57 George Town Allahabad | Prayagraj | Uttar Pradesh | 211002 | 700 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Lug
Alluminium Crimping Lug Long Barrel 240 Sqmm
Lug
Alluminium Crimping Lug Long Barrel 400 Sqmm
Lug
Alluminium Crimping Lug Long Barrel 120 Sqmm
Lug
Alluminium Crimping Lug Long Barrel 600 Sqmm
Lug
Ht Bushing Rod with Oil Seal Packing For 10 Mva TF
HT Bushing Rod
Ht Bushing Rod with Oil Seal Packing For 5 Mva TF
Copper Z Clamp For Power TF
Copper Z Clamp For Power TF
F Clamp
F Clamp
LT Bushing Rod
Lt Bushing Rod (Copper) For 250 Kva and 400 Kva Transformers
Lt Bushing Rod
Lt Bushing Rod Alluminium For below 400 Kva Transformers
Z Clamp For 400 Kva TF
Z Clamp For 400 Kva TF
L.T. Fuse
L.T. Fuse
H.T. Fuse
H.T. Fuse
U Clamp Suitable For Ht Lt Pcc Pole
U-Clamp Suitable For Ht Lt Pcc Pole
U Clamp Suitable For Stp Pcc Pole
U-Clamp Suitable For Stp Pcc Pole
Various Size Oil Seal and Packing For Transformers
Various Size Oil Seal Packing For Transformers
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Lug | Alluminium Crimping Lug Long Barrel 240 Sqmm | 700 | no | buycon6.pvvnlv.up | 15 | |
| 2 | Lug | Alluminium Crimping Lug Long Barrel 400 Sqmm | 600 | no | buycon6.pvvnlv.up | 15 | |
| 3 | Lug | Alluminium Crimping Lug Long Barrel 120 Sqmm | 1,400 | no | buycon6.pvvnlv.up | 15 | |
| 4 | Lug | Alluminium Crimping Lug Long Barrel 600 Sqmm | 100 | no | buycon6.pvvnlv.up | 15 | |
| 5 | Lug | Ht Bushing Rod with Oil Seal Packing For 10 Mva TF | 25 | no | buycon6.pvvnlv.up | 15 | |
| 6 | HT Bushing Rod | Ht Bushing Rod with Oil Seal Packing For 5 Mva TF | 25 | no | buycon6.pvvnlv.up | 15 | |
| 7 | Copper Z Clamp For Power TF | Copper Z Clamp For Power TF | 30 | no | buycon6.pvvnlv.up | 15 | |
| 8 | F Clamp | F Clamp | 300 | no | buycon6.pvvnlv.up | 15 | |
| 9 | LT Bushing Rod | Lt Bushing Rod (Copper) For 250 Kva and 400 Kva Transformers | 220 | no | buycon6.pvvnlv.up | 15 | |
| 10 | Lt Bushing Rod | Lt Bushing Rod Alluminium For below 400 Kva Transformers | 240 | no | buycon6.pvvnlv.up | 15 | |
| 11 | Z Clamp For 400 Kva TF | Z Clamp For 400 Kva TF | 80 | no | buycon6.pvvnlv.up | 15 | |
| 12 | L.T. Fuse | L.T. Fuse | 15 | kg | buycon6.pvvnlv.up | 15 | |
| 13 | H.T. Fuse | H.T. Fuse | 15 | kg | buycon6.pvvnlv.up | 15 | |
| 14 | U Clamp Suitable For Ht Lt Pcc Pole | U-Clamp Suitable For Ht Lt Pcc Pole | 400 | no | buycon6.pvvnlv.up | 15 | |
| 15 | U Clamp Suitable For Stp Pcc Pole | U-Clamp Suitable For Stp Pcc Pole | 150 | no | buycon6.pvvnlv.up | 15 | |
| 16 | Various Size Oil Seal and Packing For Transformers | Various Size Oil Seal Packing For Transformers | 900 | no | buycon6.pvvnlv.up | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements / CA certificate showing turnover
Experience certificates for similar supply
Technical compliance certificates (if any) and OEM authorization
Bid security/EMD documentation as per ATC
Technical bid and bid submission forms
Notarized undertaking regarding non-liquidity / non-bankruptcy
Any additional ATC-specified documents
Key insights about UTTAR PRADESH tender market
To bid, prepare GST and PAN documents, audited turnover proof for last 3 years, and OEM authorizations if required. Ensure 16 item scope alignment (Lug, clamps, fuses, seals). Submit EMD per ATC and technical bid with organization-specific forms; follow option clause terms for quantity variability up to 25%.
Required documents typically include GST certificate, PAN card, audited financial statements or CA certificate showing turnover, experience certificates for similar supply, OEM authorization, technical bid, and EMD documentation. ATC may specify additional bidder undertakings and supplier registrations.
Delivery timelines begin from the last date of the original delivery order, with potential extension under the option clause. Extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
Explicit standards are not listed in the provided data; bidders should align with IS/IEC compatibility and obtain OEM authorizations as applicable. Confirm ISI/ISO certifications and product conformity in ATC if required by Purvanchal Vidyut Vitaran Nigam Limited.
BOQ lists 16 items with N/A quantities; bidders must base pricing on itemized expectations from the ATC and prepare for bulk supply of Lug, clamps, fuses, oil seals, and related transformer components.
EMD amount is not specified in the data provided; bidders must consult the ATC for exact EMD or security deposit requirements and acceptable payment modes.
Eligibility includes non-liquidation, adequate turnover per last 3 years, demonstrated experience in similar supply, GST registration, and OEM authorizations if required. Ensure financial health and supply capability to handle multiple electrical components.
ATC terms are published separately and must be reviewed before submission. They specify quantity variation, turnover thresholds, delivery timelines, EMD, and mandatory documentation for eligibility and technical compliance.