TenderDekho Logo
Active GEM

Purvanchal Vidyut Vitaran Nigam Limited Lug, HT/LT Bushing & U Clamp Tender Allahabad UP 2026

Bid Publish Date

17-Oct-2026, 4:53 pm

Bid End Date

27-Oct-2026, 5:00 pm

Progress

Issue17-Oct-2026, 4:53 pm
AwardPending

Tender Overview

Purvanchal Vidyut Vitaran Nigam Limited (Varanasi) invites bids for a broad category of power transformer components, including Lug, HT Bushing Rod, Copper Z Clamp, F Clamp, LT Bushing Rod, U Clamp for HT/LT PCC poles, LT/HT fuses, and related oil seals and packing. The procurement covers 16 items with undefined quantities, located in Allahabad, Uttar Pradesh (210010). The contract contemplates a flexible quantity policy: up to 25% additional quantity at contracted rates during or after delivery, with delivery periods adjusted per the option clause. The bid requires turnover and financial health verification per ATC. This opportunity targets suppliers capable of meeting multi-item electrical component requirements under UP energy procurement norms.

Technical Specifications & Requirements

  • Product categories include: Lug, HT/LT fuses, U clamps for PCC poles, Z clamps, oil seals and packing for transformers.
  • Delivery scope spans 16 items with unspecified unit quantities; bidders must infer and price per item under bulk electrical hardware provisioning.
  • Key clauses call for option-based quantity adjustments (up to 25%), and delivery time math linked to original and extended delivery periods (minimum 30 days).
  • Financial/eligibility: bidders must demonstrate turnover as detailed in the bid document and provide an undertaking against liquidation or insolvency; an ATC-compliant turnover eligibility is required.
  • Standards/quality considerations are not explicitly listed; bidders should prepare for generic supply compliance and OEM alignment.

Terms, Conditions & Eligibility

  • EMD/ security: Not specified in the provided data; bidders should review ATC for exact deposit requirements.
  • Turnover criteria: Minimum average annual turnover over the last 3 financial years as defined in the bid document; calculation based on audited balance sheets or CA/CFO certificates; younger firms use post-incorporation turnover.
  • Delivery & payment: Delivery period defined by option clause; payment terms not explicitly stated—expect buyer-specific terms in ATC.
  • Documents: GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bid documents typically required; ensure submission per ATC.
  • Risk/penalties: Penalties or LD provisions not detailed here; verify in ATC and LOI. Ensure compliance with bid-specific provisions.

Key Specifications

    • Product names: Lug, HT Bushing Rod, Copper Z Clamp, F Clamp, LT Bushing Rod, U Clamp (HT/LT PCC Pole), HT/LT Fuse, Oil Seal and Packing for Transformers
    • Quantities: 16 items in BOQ; exact quantities not disclosed
    • EMD/Value: Not specified in provided data; verify in ATC
    • Category: Electrical hardware components for transformers and PCC poles
    • Delivery: Extended delivery period options; minimum extension logic defined by (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
    • Standards: Not explicitly stated; bidders should align with organization’s typical IS/IEC compatibility and OEM approvals
    • Warranty/Support: Not specified; confirm in ATC

Terms & Conditions

  • Option clause allows 25% quantity variation during contract and currency

  • Turnover and financial stability must be demonstrated via audited statements or CA certificate

  • Delivery period adjustments hinge on original and extended periods with minimum 30 days

Important Clauses

Payment Terms

Not specified in data; confirm exact terms in ATC and purchase order

Delivery Schedule

Delivery starts from last date of original delivery order; extended period follows option clause with calculated time and minimum 30 days

Penalties/Liquidated Damages

Not detailed here; bidders must verify LD/penalties in ATC

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Minimum average turnover as defined in bid document (last 3 financial years)

  • Experience in supplying electrical hardware for transformers/ poles

  • OEM authorization and GST compliance

Advertisement

Tender Data

Bid Details

Quantity

5200

Category

Lug

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Lug , HT Bushing Rod , Copper Z Clamp For Power TF , F Clamp , LT Bushing Rod , Lt Bushing Rod , Z Clamp For 400 Kva TF , L.T. Fuse , H.T. Fuse , U Clamp Suitable For Ht Lt Pcc Pole , U Clamp Suitable For Stp Pcc Pole , Various Size Oil Seal and Packing For Transformers

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Prayagraj

Delivery Pincodes

211002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Radhey Shyam211002,Office of SE EDC 1, 57 George Town AllahabadPrayagrajUttar Pradesh21100270015-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10052239.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Managing Director Office

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

Lug

Alluminium Crimping Lug Long Barrel 240 Sqmm

700 no Delivery: 15 days
#2

Lug

Alluminium Crimping Lug Long Barrel 400 Sqmm

600 no Delivery: 15 days
#3

Lug

Alluminium Crimping Lug Long Barrel 120 Sqmm

1,400 no Delivery: 15 days
#4

Lug

Alluminium Crimping Lug Long Barrel 600 Sqmm

100 no Delivery: 15 days
#5

Lug

Ht Bushing Rod with Oil Seal Packing For 10 Mva TF

25 no Delivery: 15 days
#6

HT Bushing Rod

Ht Bushing Rod with Oil Seal Packing For 5 Mva TF

25 no Delivery: 15 days
#7

Copper Z Clamp For Power TF

Copper Z Clamp For Power TF

30 no Delivery: 15 days
#8

F Clamp

F Clamp

300 no Delivery: 15 days
#9

LT Bushing Rod

Lt Bushing Rod (Copper) For 250 Kva and 400 Kva Transformers

220 no Delivery: 15 days
#10

Lt Bushing Rod

Lt Bushing Rod Alluminium For below 400 Kva Transformers

240 no Delivery: 15 days
#11

Z Clamp For 400 Kva TF

Z Clamp For 400 Kva TF

80 no Delivery: 15 days
#12

L.T. Fuse

L.T. Fuse

15 kg Delivery: 15 days
#13

H.T. Fuse

H.T. Fuse

15 kg Delivery: 15 days
#14

U Clamp Suitable For Ht Lt Pcc Pole

U-Clamp Suitable For Ht Lt Pcc Pole

400 no Delivery: 15 days
#15

U Clamp Suitable For Stp Pcc Pole

U-Clamp Suitable For Stp Pcc Pole

150 no Delivery: 15 days
#16

Various Size Oil Seal and Packing For Transformers

Various Size Oil Seal Packing For Transformers

900 no Delivery: 15 days
Advertisement

Categories 21

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements / CA certificate showing turnover

4

Experience certificates for similar supply

5

Technical compliance certificates (if any) and OEM authorization

6

Bid security/EMD documentation as per ATC

7

Technical bid and bid submission forms

8

Notarized undertaking regarding non-liquidity / non-bankruptcy

9

Any additional ATC-specified documents

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the Allahabad power components tender in UP 2026?

To bid, prepare GST and PAN documents, audited turnover proof for last 3 years, and OEM authorizations if required. Ensure 16 item scope alignment (Lug, clamps, fuses, seals). Submit EMD per ATC and technical bid with organization-specific forms; follow option clause terms for quantity variability up to 25%.

What documents are required for Purvanchal Vidyut Vitaran Nigam Limited bids in UP?

Required documents typically include GST certificate, PAN card, audited financial statements or CA certificate showing turnover, experience certificates for similar supply, OEM authorization, technical bid, and EMD documentation. ATC may specify additional bidder undertakings and supplier registrations.

What is the delivery time framework for UP transformer components tender?

Delivery timelines begin from the last date of the original delivery order, with potential extension under the option clause. Extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

Which standards and certifications are required for UP transformer accessories tender?

Explicit standards are not listed in the provided data; bidders should align with IS/IEC compatibility and obtain OEM authorizations as applicable. Confirm ISI/ISO certifications and product conformity in ATC if required by Purvanchal Vidyut Vitaran Nigam Limited.

What is the scope of quantities for the 16-item BOQ in UP tender?

BOQ lists 16 items with N/A quantities; bidders must base pricing on itemized expectations from the ATC and prepare for bulk supply of Lug, clamps, fuses, oil seals, and related transformer components.

How is EMD amount determined for UP electrical component tender 2026?

EMD amount is not specified in the data provided; bidders must consult the ATC for exact EMD or security deposit requirements and acceptable payment modes.

What eligibility criteria ensure qualification for Purvanchal Vidyut Vitaran Nigam bids in UP?

Eligibility includes non-liquidation, adequate turnover per last 3 years, demonstrated experience in similar supply, GST registration, and OEM authorizations if required. Ensure financial health and supply capability to handle multiple electrical components.

Where to find the ATC terms for bids by Purvanchal Vidyut Vitaran Nigam Limited?

ATC terms are published separately and must be reviewed before submission. They specify quantity variation, turnover thresholds, delivery timelines, EMD, and mandatory documentation for eligibility and technical compliance.

Advertisement