TenderDekho Logo
Closed GEM

Tender Notice for Layer Two Managed Switch Twenty Four Port,Layer Two Managed Switch Sixteen Port,Switching Module,Ca in SOLAN, HIMACHAL PRADESH

Bid Publish Date

24-Jul-2026, 5:57 pm

Bid End Date

14-Aug-2026, 6:00 pm

Progress

RA
Issue24-Jul-2026, 5:57 pm
Reverse AuctionCompleted
AwardCompleted

Indian Army announces a tender for Layer Two Managed Switch Twenty Four Port, Layer Two Managed Switch Sixteen Port, Switching Module, Cat Six A UTP Cable, Input Output Box with Face Plate, Patch Panel Cat Six A Loaded UTP, Jack Cat 6A Keystone UTP, Patch Cord, RJ Forty Five Connector, Media Converter, OFC Cable Armored, Fiber Patch Cord, Fiber Pigtail cable with all accessories, Network Rack wall mount, Small Rack wall mount, PVC Casing Capping five inch, PVC Casing Capping two inch, PVC Casing Capping one inch, Conduit Pipe, Cable Tag Numbering Sets, LAN Jointer, TAG Tie, HDPE Pipe Seventy mm, LAN Tester, Crimping Tool, Cutter, Five Volt Battery, Installation in SOLAN, HIMACHAL PRADESH. Quantity: 7060. Submission Deadline: 14-08-2026 18: 00: 00. Last date to apply is approaching fast!

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1M/s WAHEGURU ELECTRONICS SYSTEMS(MSE,MII)   Under PMA Winner ₹14,98,160Item Categories : Layer Two Managed Switch Twenty Four Port,Layer Two Managed Switch Sixteen Port,Switching Module,Ca
L2TELENET MARKETING PVT LTD (MSE,MII)   Under PMA₹15,00,780Item Categories : Layer Two Managed Switch Twenty Four Port,Layer Two Managed Switch Sixteen Port,Switching Module,Ca
L3Chadha Engineers (MSE,MII)   Under PMA₹15,16,540Item Categories : Layer Two Managed Switch Twenty Four Port,Layer Two Managed Switch Sixteen Port,Switching Module,Ca

🎉 L1 Winner

M/s WAHEGURU ELECTRONICS SYSTEMS(MSE,MII)   Under PMA

Final Price: ₹14,98,160

Reverse Auction Schedule

Completed

Start

25-Aug-2026, 2:00 pm

End

26-Aug-2026, 2:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

7060

Category

Layer Two Managed Switch Twenty Four Port

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

45

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Layer Two Managed Switch Twenty Four Port , Layer Two Managed Switch Sixteen Port , Switching Module , Cat Six A UTP Cable , Input Output Box with Face Plate , Patch Panel Cat Six A Loaded UTP , Jack Cat 6A Keystone UTP , Patch Cord , RJ Forty Five Connector , Media Converter , OFC Cable Armored , Fiber Patch Cord , Fiber Pigtail cable with all accessories , Network Rack wall mount , Small Rack wall mount , PVC Casing Capping five inch , PVC Casing Capping two inch , PVC Casing Capping one inch , Conduit Pipe , Cable Tag Numbering Sets , LAN Jointer , TAG Tie , HDPE Pipe Seventy mm , LAN Tester , Crimping Tool , Cutter , Five Volt Battery , Installation

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

SOLAN

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SOLANSOLAN--260-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9631712.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 29 Items Sign in for GEM prices

#1

Layer Two Managed Switch Twenty Four Port

Layer Two Managed Switch Twenty Four Port

2 nos Delivery: 60 days
#2

Layer Two Managed Switch Sixteen Port

Layer Two Managed Switch Sixteen Port

4 nos Delivery: 60 days
#3

Switching Module

Switching Module

12 nos Delivery: 60 days
#4

Cat Six A UTP Cable

Cat Six A UTP Cable

4,000 mtr Delivery: 60 days
#5

Input Output Box with Face Plate

I/O Box with Face Plate

80 nos Delivery: 60 days
#6

Patch Panel Cat Six A Loaded UTP

Patch Panel Cat 6A Loaded UTP

4 nos Delivery: 60 days
#7

Jack Cat 6A Keystone UTP

Jack Cat 6A Keystone UTP

80 nos Delivery: 60 days
#8

Patch Cord

Patch Cord

70 nos Delivery: 60 days
#9

Patch Cord

Patch Cord

30 nos Delivery: 60 days
#10

RJ Forty Five Connector

RJ Forty Five Connector

300 nos Delivery: 60 days
#11

Media Converter

Media Converter

4 nos Delivery: 60 days
#12

OFC Cable Armored

OFC Cable Armored

1,000 mtr Delivery: 60 days
#13

Fiber Patch Cord

Fiber Patch Cord

15 nos Delivery: 60 days
#14

Fiber Pigtail cable with all accessories

Fiber Pigtail cable with all accessories

8 nos Delivery: 60 days
#15

Network Rack wall mount

Network Rack wall mount

1 nos Delivery: 60 days
#16

Small Rack wall mount

Small Rack wall mount

1 nos Delivery: 60 days
#17

PVC Casing Capping five inch

PVC Casing Capping five inch

50 nos Delivery: 60 days
#18

PVC Casing Capping two inch

PVC Casing Capping two inch

350 nos Delivery: 60 days
#19

PVC Casing Capping one inch

PVC Casing Capping one inch

500 nos Delivery: 60 days
#20

Conduit Pipe

Conduit Pipe

500 nos Delivery: 60 days
#21

Cable Tag Numbering Sets

Cable Tag Numbering Sets

3 nos Delivery: 60 days
#22

LAN Jointer

LAN Jointer

10 nos Delivery: 60 days
#23

TAG Tie

TAG Tie

3 nos Delivery: 60 days
#24

HDPE Pipe Seventy mm

HDPE Pipe Seventy mm

20 nos Delivery: 60 days
#25

LAN Tester

LAN Tester

2 nos Delivery: 60 days
#26

Crimping Tool

Crimping Tool

2 nos Delivery: 60 days
#27

Cutter

Cutter

2 nos Delivery: 60 days
#28

Five Volt Battery

Five Volt Battery

6 nos Delivery: 60 days
#29

Installation

Installation

1 nos Delivery: 60 days

Categories 29

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer