TenderDekho Logo
GEM

Tender Notice for Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Inner Tube S in SURAT, GUJARAT

Bid Publish Date

20-Mar-2025, 12:59 pm

Bid End Date

23-Jul-2025, 11:00 am

EMD

₹1,95,723

Progress

Issue20-Mar-2025, 12:59 pm
Technical04-Sep-2025, 12:04 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

451

Categories 49

Nuclear Power Corporation Of India Limited has released a public tender for Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Inner Tube S in SURAT, GUJARAT. Quantity: 451. Submission Deadline: 23-07-2025 11: 00: 00. Download documents and apply online.

Documents 7

GeM-Bidding-7579516.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 35 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Inner Tube Subassembly as per Drg. No. KAPP-3 and 4-35221-2088-GA. Refer Technical Specification in Annexure-4. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Inner Tube Subassembly as per Drg. No. KAPP-3&4-35221-2088-GA. Refer Detailed Technical Specification in Annexure-4. 1 nos con2.gj 720
2 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Outer Tube Subassembly as per Drg. No. KAPP-3 and 4-35221-2090-GA. Refer Technical Specification in Annexure-4. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Outer Tube Subassembly as per Drg. No. KAPP-3&4-35221-2090-GA. Refer Detailed Technical Specification in Annexure-4. 1 nos con2.gj 720
3 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Tube as per Drg. No. KAPP-3 and 4-35221-2091-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Tube as per Drg. No. KAPP-3&4-35221-2091-DD. Refer Detailed Technical Specification in Annexure-4. 1 nos con2.gj 720
4 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Tube End as per Drg. No. KAPP-3 and 4-35221-2048-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Tube End as per Drg. No. KAPP-3&4-35221-2048-DD. Refer Detailed Technical Specification in Annexure-4. 3 nos con2.gj 720
5 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Hex. Socket set screw Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Hex. Socket set screw (Cup Point) 27 nos con2.gj 720
6 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Latch Nut Extension as per Drg. No. KAPP-3 and 4-35221-2049-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Latch Nut Extension as per Drg. No. KAPP-3&4-35221-2049-DD. Refer Detailed Technical Specification in Annexure-4. 3 nos con2.gj 720
7 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Piston Head as per Drg. No. KAPP-3 and 4-35221-2040-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Piston Head as per Drg. No. KAPP-3&4-35221-2040-DD. Refer Detailed Technical Specification in Annexure-4. 6 nos con2.gj 720
8 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Piston Head Dowel as per Drg. No. KAPP-3 and 4-35221-2041-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Piston Head Dowel as per Drg. No. KAPP-3&4-35221-2041-DD. Refer Detailed Technical Specification in Annexure-4. 3 nos con2.gj 720
9 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Belleville Washers Set as per Drg. No. KAPP-3 and 4-35221-2045-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Belleville Washers Set as per Drg. No. KAPP-3&4-35221-2045-DD. Refer Detailed Technical Specification in Annexure-4. 3 set con2.gj 720
10 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Pull Dowel as per Drg. No. KAPP-3 and 4-35221-2051-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Pull Dowel as per Drg. No. KAPP-3&4-35221-2051-DD. Refer Detailed Technical Specification in Annexure-4. 3 nos con2.gj 720
11 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Assembly, Packing and Supply of Stop Pin, Material- ASTM A-564 Grade 630, Condition H1100, HRC 32 - 38 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Assembly, Packing & Supply of Stop Pin, Material- ASTM A-564 Grade 630, Condition H1100, HRC 32 - 38 10 set con2.gj 720
12 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Spacer, Material_ SS-410 Annealed as per Drg. No. KAPP-3 and 4-35221-3073-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of Spacer, Material_ SS-410 Annealed as per Drg. No. KAPP-3&4-35221-3073-DD. 10 nos con2.gj 720
13 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of A, B and D Piston Head as per Drg. No. KAPP-3 and 4-35221-3108-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of A, B & D Piston Head as per Drg. No. KAPP-3&4-35221-3108-DD. Refer Detailed Technical Specification in Annexure-4. 24 nos con2.gj 720
14 Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of C Piston Head as per Drg. No. KAPP-3 and 4-35221-3099-DD. Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing & Supply of C Piston Head as per Drg. No. KAPP-3&4-35221-3099-DD. Refer Detailed Technical Specification in Annexure-4. 4 nos con2.gj 720
15 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of C Bush as per Drg. No. KAPP-3 and 4-35221-3107-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of C Bush as per Drg. No. KAPP-3&4-35221-3107-DD. Refer Detailed Technical Specification in Annexure-4. 8 nos con2.gj 720
16 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of A Piston Rod as per Drg. No. KAPP-3 and 4-35221-3079-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of A Piston Rod as per Drg. No. KAPP-3&4-35221-3079-DD. Refer Detailed Technical Specification in Annexure-4. 10 nos con2.gj 720
17 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of C Piston Rod as per Drg. No. KAPP-3 and 4-35221-3080-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of C Piston Rod as per Drg. No. KAPP-3&4-35221-3080-DD. Refer Detailed Technical Specification in Annexure-4. 10 nos con2.gj 720
18 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of B and D Piston Rod as per Drg. No. KAPP-3 and 4-35221-3081-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of B & D Piston Rod as per Drg. No. KAPP-3&4-35221-3081-DD. Refer Detailed Technical Specification in Annexure-4. 20 nos con2.gj 720
19 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of C Piston Extension as per Drg. No. KAPP-3 and 4-35221-3096-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of C Piston Extension as per Drg. No. KAPP-3&4-35221-3096-DD. Refer Detailed Technical Specification in Annexure-4. 4 nos con2.gj 720
20 Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing and Supply of A Piston Extension as per Drg. No. KAPP-3 and 4-35221-3120-DD. Procurement of Raw Material, Manufacturing, Testing, Heat Treatment, Inspection, Packing & Supply of A Piston Extension as per Drg. No. KAPP-3&4-35221-3120-DD. Refer Detailed Technical Specification in Annexure-4. 4 nos con2.gj 720
21 Procurement of Raw Material, Machining, Testing, Heat Treatment, Inspection, Packing and Supply of B and D Piston Extension as per Drg. No. KAPP-3 and 4-35221-3105-DD. Procurement of Raw Material, Machining, Testing, Heat Treatment, Inspection, Packing & Supply of B & D Piston Extension as per Drg. No. KAPP-3&4-35221-3105-DD. Refer Detailed Technical Specification in Annexure-4. 14 nos con2.gj 720
22 Procurement of raw material, manufacturing, inspection, packing, and supply of Hexagonal Nut, Material_ ASTM A193 Grade 4 as per Drg. No. KAPP-3 and 4-35221-2466-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Hexagonal Nut, Material_ ASTM A193 Grade 4 as per Drg. No. KAPP-3&4-35221-2466-DD. 24 nos con2.gj 720
23 Procurement of raw material, manufacturing, inspection, packing, and supply of Washer, Material_ SS-410 Annealed as per Drg. No. KAPP-3 and 4-35221-2468-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Washer, Material_ SS-410 Annealed as per Drg. No. KAPP-3&4-35221-2468-DD. 24 nos con2.gj 720
24 Procurement of raw material, manufacturing, inspection, packing, and supply of Stud, Material_ ASTM A193 Grade B7 as per Drg. No. KAPP-3 and 4-35221-2465-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Stud, Material_ ASTM A193 Grade B7 as per Drg. No. KAPP-3&4-35221-2465-DD. 24 nos con2.gj 720
25 Procurement of raw material, manufacturing, inspection, packing, and supply of Hex. Socket head cap screw size M20 x 2.5 -6g x 90 mm LG, Material_ HTS Cadmium plated. Procurement of raw material, manufacturing, inspection, packing, & supply of Hex. Socket head cap screw size M20 x 2.5 -6g x 90 mm LG, Material_ HTS Cadmium plated. 48 nos con2.gj 720
26 Procurement of raw material, manufacturing, inspection, packing, and supply of Wedge Segment as per Drg. No. KAPP-3 and 4-35221-2412-DD with compliance of Note No. 5. Procurement of raw material, manufacturing, inspection, packing, & supply of Wedge Segment as per Drg. No. KAPP-3&4-35221-2412-DD with compliance of Note No. 5. 4 nos con2.gj 720
27 Procurement of raw material, manufacturing, inspection, packing, and supply of Preloading Nut as per Drg. No. KAPP-3 and 4-35221-2399-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Preloading Nut as per Drg. No. KAPP-3&4-35221-2399-DD. 2 nos con2.gj 720
28 Procurement of raw material, manufacturing, inspection, packing, and supply of Cavity Filling Pipe as per Drg. No. KAPP-3 and 4-35221-2434-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Cavity Filling Pipe as per Drg. No. KAPP-3&4-35221-2434-DD. 2 nos con2.gj 720
29 Procurement of raw material, manufacturing, inspection, packing, and supply of Pipe Retainer as per Drg. No. KAPP-3 and 4-35221-2435-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Pipe Retainer as per Drg. No. KAPP-3&4-35221-2435-DD. 2 nos con2.gj 720
30 Procurement of raw material, manufacturing, inspection, packing, and supply of Post Belleville Washer as per Drg. No. KAPP-3 and 4-35221-2457-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Post Belleville Washer as per Drg. No. KAPP-3&4-35221-2457-DD. 120 nos con2.gj 720
31 Procurement of raw material, manufacturing, inspection, packing, and supply of Bearing Retainer as per Drg. No. KAPP-3 and 4-35221-2448-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Bearing Retainer as per Drg. No. KAPP-3&4-35221-2448-DD. 2 nos con2.gj 720
32 Procurement of Raw Material, Manufacturing, Inspection, Assembly, Packing and Supply of Port Plate for FM Snout Hydraulic Motor as per Drg. No. KAPP-3 and 4-35226-2043-DD Procurement of Raw Material, Manufacturing, Inspection, Assembly, Packing & Supply of Port Plate for FM Snout Hydraulic Motor as per Drg. No. KAPP-3&4-35226-2043-DD, Material_ CS Plate as per ASTM A515 Gr. 70. 4 set con2.gj 720
33 Procurement of raw material, manufacturing, inspection, packing, and supply of Spring Adjuster, Material_ SS-304 as per Drg. No. KAPP-3 and 4-35221-2491-DD. Procurement of raw material, manufacturing, inspection, packing, & supply of Spring Adjuster, Material_ SS-304 as per Drg. No. KAPP-3&4-35221-2491-DD. 8 nos con2.gj 720
34 Raw Material, Manufacturing, Inspection, Heat Treatment, Packing and Supply of Wire Take up Pulley, Material_ ASTM A564 Grade 630 Condition H1025, HRC 35-42 as per Drg. No. KAPP-3 and 4-35221-2165-SK1 Procurement of Raw Material, Manufacturing, Inspection, Heat Treatment, Packing & Supply of Wire Take up Pulley, Material_ ASTM A564 Grade 630 Condition H1025, HRC 35-42 as per Drg. No. KAPP-3&4-35221-2165-SK1 along with 15 no. of Hex. socket head cap screws size M4 x 0.7 - 6g x 25 mm LG, Material_ SS and 1 no. of Dowel Pin (Drg. No. KAPP-3&4-35221-2174-DD). 9 set con2.gj 720
35 Procurement of Raw Material, Manufacturing, Inspection, Heat Treatment,Packing and Supply of Hub, Material_ ASTM A564 Grade 630 Condition H1100, HRC 32-38 as per Drg. No. KAPP-3 and 4-35221-2153-DD Procurement of Raw Material, Manufacturing, Inspection, Heat Treatment, Packing & Supply of Hub, Material_ ASTM A564 Grade 630 Condition H1100, HRC 32-38 as per Drg. No. KAPP-3&4-35221-2153-DD along with 15 no. of Hex. socket head cap screws size M5 x 0.8 - 6g x 10 mm LG, Material_ SS. 9 set con2.gj 720

Corrigendum Updates

2 Updates
#1

Update

02-Jul-2025
#2

Update

29-Apr-2025

Technical Results

S.No Seller Item Date Status
1MTAR TECHNOLOGIES LIMITED   Under PMA-09-04-2025 12:04:44Qualified

Financial Results

Rank Seller Price Item
L1MTAR TECHNOLOGIES LIMITED(MII)   Under PMA₹97,76,543Item Categories : Procurement of Raw Material, Manufacturing, Testing, Inspection, Packing and Supply of Inner Tube S

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for participation in this tender?

The eligibility requirements consist of being a registered entity with appropriate regulatory compliance. Bidders also need to possess experience in manufacturing or procuring similar components essential for fuelling machines. Evidence of legal standing and financial stability will also be scrutinized during the selection process.

What certificates are required for submission?

Bidders must furnish necessary certificates such as GST registration, ISO certifications relevant to manufacturing quality, and any previous contracts or orders that exhibit experience in related supply chains. Each document must comply with the formats specified in the tender documents to avoid disqualification.

How can I register to participate in bidding for this tender?

The registration process involves creating an account on the designated e-procurement platform. After registration, bidders must ensure that all documents are uploaded in the accepted formats as defined in the documentation, including technical specifications and compliance certificates.

What are the performance security requirements associated with this tender?

The performance security requirements stipulate that the winning bidder must submit a security deposit that guarantees the fulfillment of contract obligations. This typically involves an earnest money deposit and may require additional documentation certifying financial stability.

How will the evaluation and selection process be conducted?

The tender evaluation and selection process involves a thorough assessment of submitted bids based on predefined evaluation criteria. Key factors include adherence to technical and financial requirements, submission completeness, and overall pricing. Notifications of results will be communicated as stated in the tender details following the evaluation phase.