Progress
Quantity
114
Category
Uninterruptible Power Supply UPS
Bid Type
Two Packet Bid
Public procurement opportunity for Rubber Board Uninterruptible Power Supply UPS, Battery, UPS battery Rack, Buyback, Other accessories to be supplied in KOTTAYAM, KERALA. Quantity: 114 issued by. Submission Deadline: 28-02-2025 14: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Uninterruptible Power Supply UPS , Battery , UPS battery Rack , Buyback , Other accessories to be supplied
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Uninterruptible Power Supply UPS
40 kVA highly efficient online UPS System with battery bank.
Battery
SMF Battery bank for 60 minutes backup on 40 kVA full load in each unit
UPS battery Rack
Suitable material that can accommodate all batteries.
Buyback
Old 40 kVA 2 nos UPS and 106 nos 100 AH SMF Battery and its racks.
Other accessories to be supplied
As epr specification uploaded
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Uninterruptible Power Supply UPS | 40 kVA highly efficient online UPS System with battery bank. | 1 | pieces | rbrtibuy | 10 | |
| 2 | Battery | SMF Battery bank for 60 minutes backup on 40 kVA full load in each unit | 2 | pieces | rbrtibuy | 10 | |
| 3 | UPS battery Rack | Suitable material that can accommodate all batteries. | 2 | pieces | rbrtibuy | 10 | |
| 4 | Buyback | Old 40 kVA 2 nos UPS and 106 nos 100 AH SMF Battery and its racks. | 108 | pieces | rbrtibuy | 10 | |
| 5 | Other accessories to be supplied | As epr specification uploaded | 1 | pieces | rbrtibuy | 10 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
28-Feb-2025, 2:00 pm
Opening Date
28-Feb-2025, 2:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ANGEL INDUSTRIAL INSTRUMENTATION Under PMA | - | 26-02-2025 15:21:29 | |
| 2 | Dronacharya Electronics Systems Under PMA | - | 26-02-2025 14:55:31 | |
| 3 | HYKON INDIA LIMITED Under PMA | - | 25-02-2025 20:07:41 | |
| 4 | NAIVE POWER PROJECTS PRIVATE LIMITED Under PMA | - | 26-02-2025 15:56:33 | |
| 5 | NUMAX ENERGY SOLUTIONS Under PMA | - | 24-02-2025 18:35:06 | |
| 6 | PALMIRO TECHNOLOGIES PRIVATE LIMITED Under PMA | - | 26-02-2025 11:37:08 | |
| 7 | POWER-ONE MICRO SYSTEMS PRIVATE LIMITED Under PMA | - | 28-02-2025 13:37:02 | |
| 8 | SHRIDDHA POWER SOLUTIONS PRIVATE LIMITED Under PMA | - | 26-02-2025 15:23:03 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | POWER-ONE MICRO SYSTEMS PRIVATE LIMITED(MII) Under PMA | Item Categories : Uninterruptible Power Supply UPS,Battery,UPS battery Rack,Buyback,Other accessories to be supplied |
Please sign in or create an account to view contract details and download result documents.
Key insights about KERALA tender market
The eligibility requirements include being a registered entity compliant with local regulations. Bidders also need to demonstrate a minimum average annual turnover of 20 Lakh in UPS-related sales, submit OEM authorization certificates, and provide proof of past performance meeting the required criteria. Special exemptions are available for MSEs, allowing certain waivers on experience requirements.
All products must adhere to industry standards as laid out in the tender documents. Important requirements include compliance with IS 14886 for Switching Power Supplies and detailed performance specifications as outlined in the linked documentation. Successful bidders must ensure the technical documentation provided meets these specifications for the products they offer.
The payment terms will be detailed upon contract award but typically necessitate advance payables based on milestones agreed upon. A performance security will also be required, typically ranging between 5-10% of the total contract value, to ensure compliance with delivery schedules and product quality assurances as defined in the tender agreements.
All proposals and required documents must be submitted electronically through the designated portal. Accepted document formats include PDF and other specified formats in the tender guidelines. Bidders must ensure all documents are complete and compliant to avoid disqualification during initial evaluations.
Micro, Small, and Medium Enterprises (MSEs) benefit from specific provisions allowing exemptions from traditional experience and turnover criteria. This initiative is part of a broader strategy under the 'Make in India' policies to promote local manufacturing and procurement, fostering growth in the MSE sector and encouraging more competitive bids in government tenders.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS