Progress
The procurement is conducted by the Indian Army (Department Of Military Affairs) for the LV6/MT14 2610-001590 Tube Inner Pneumatic 355/90-20 C/W in Sonitpur, Assam. The BOQ shows 0 items, indicating limited or undefined quantity details; however, a significant option clause exists allowing quantity adjustments up to 50 percent of bid quantity during contract placement and throughout the currency. Delivery terms hinge on the last date of the original delivery order, with extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. An ATC document is referenced but not disclosed here. The tender is positioned for military supply, with ATC and option clauses shaping execution. Key differentiator is the explicit quantity-flexibility policy and the lack of BOQ items.
Product/service: Tube Inner Pneumatic 355/90-20 with C/W
Quantities: Not specified in BOQ; subject to up to 50% variation
Estimated value: Not disclosed
Experience: Not specified in provided data; refer to ATC
Standards/Quality: Not specified; ATC may contain IS/ISO requirements
Delivery/Installation: As per last delivery date with option-based extension
50% quantity variation rights reserved by purchaser
Delivery period starts from last date of original DO; minimum 30 days extension
ATC document governs submission and compliance specifics
Delivery periods are tied to the last date of the original delivery order; extended time calculated by option formula with a minimum of 30 days
Purchaser may increase/decrease quantity up to 50% during contract; extended delivery period permitted within contracted rates
ATC document governs specific terms and submission requirements; not fully disclosed in public data
Experience in supplying pneumatic tube components or related military-grade tubes
Ability to scale quantities up to 50% within contract duration
Compliance with ATC terms and ability to meet delivery timelines
Quantity
142
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
5
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
LV6/MT14 2610-001590 Tube Inner Pneu 355/90-20 C/W
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
26
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
SONITPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SONITPUR | SONITPUR | - | - | 142 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar product supply
Financial statements or turnover evidence
EMD documents (as per ATC terms)
Technical bid documents
OEM authorization or manufacturer certificate (if applicable) during submission
Any ATC-specified compliance certificates or declarations
Key insights about ASSAM tender market
Submit the required bidder documents per ATC, including GST, PAN, experience certificates, and financials. Ensure capability to scale quantity up to 50% and comply with delivery terms tied to the original delivery order date. Review the ATC for submission format and timelines.
Prepare GST certificate, PAN, experience certificates for similar supply, financial statements, EMD as per ATC, technical bid documents, and OEM authorization if applicable. ATC may specify additional declarations; ensure all documents align with the procurement terms.
Delivery begins from the last date of the original delivery order. If quantities are increased, the extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Ensure compliance with the option clause in the contract.
The available data does not specify standards; the ATC document likely lists required certifications. Bidders should verify IS/ISO or other standard requirements in the ATC; ensure tube specifications match the 355/90-20 size and C/W configuration.
The explicit EMD amount is not disclosed in the current data. Bidders must consult the ATC for the exact EMD value or percentage and submit the security deposit accordingly to participate in this procurement.
The purchaser reserves the right to increase or decrease the bid quantity by up to 50% during contract placement and currency. Prepare a flexible supply plan and confirm pricing for potential quantity changes in the offer.
The ATC document is uploaded by the buyer but not viewable in the provided data. Bidders should access the ATC file from the tender portal where the project is listed to obtain submission requirements, eligibility criteria, and compliance standards.