HAND BRAKE CABLE,BEARING ASSY REAR,KIT PAD ASSY FRONT,SENSOR WHEEL SPEED FRONT,SEALING KIT VANE PUM
Indian Army
PITHORAGARH, UTTARAKHAND
Bid Publish Date
29-Oct-2025, 7:42 pm
Bid End Date
08-Nov-2025, 8:00 pm
Location
Progress
Quantity
53
Category
Fly Wheel Assy
Bid Type
Two Packet Bid
The procurement is for the Indian Army under the Department Of Military Affairs in CHAMOLI, UTTARAKHAND (246401), targeting multiple automotive sub-assemblies and front-end components such as Fly Wheel Assy, Wheel Stud, Brake Pad Front, Cable Assy, Suspension Bush Kit, Brake Shoe Assy, Master Cyl Assy, Hand Brake Shoe, Wind Screen Glass, Front Lamp assemblies, Bumper and Front Grill, among others. The exact quantity, itemized BOQ values, and overall estimated value are not disclosed, but a 23-item catalog is referenced, indicating a broad line of sourcing for vehicle platforms. The tender includes a quantity option clause allowing up to ±25% variation and a sample-approval regime post contract award, highlighting quality conformance to Buyer specifications. Unique handling includes OEM/authorized seller for imported products requiring India-based after-sales support, and a 5-day advance-sample submission window. The contract emphasizes sample-based approval, with potential delivery-time adjustments if approvals lag, and standard penalties/terms may apply upon non-conformance. This tender represents a high-security, defense-grade supply opportunity for automotive components.
Product/service names: Fly Wheel Assembly, Wheel Stud, Front Brake Pad, Cable Assembly 4X4, Suspension Bush Kit, Brake Shoe Assembly, Master Cylinder Assembly, Hand Brake Shoe, Wind Screen Glass, and Front Bumper/Grille components
Quantities: not disclosed; BOQ contains 23 items, no unit quantities specified
Estimated value: not disclosed
Standards/certifications: Import OEM support required; ISI/IS compliance not specified
Delivery: option Clause up to 25% quantity variation; delivery period aligned to last delivery order date
Quality: advance sample approval within 5 days; non-conforming samples may trigger contract termination
Warranty/After-sales: Indian office of OEM authorized for after-sales service; not further detailed
Option Clause allows ±25% quantity variation during and after contract; delivery period scales with quantity and minimum 30 days
Advance sample approval required within 5 days of award; bulk supply must match approved sample or incur modifications
Imported products must have OEM/Authorized Seller with India registered office for after-sales support
Not explicitly disclosed in the data; terms governed by standard government procurement practice and vendor code terms
Delivery period commences from last date of original delivery order; option-based extension possible with minimum 30 days, plus proportional time based on quantity
Not detailed; standard procurement penalties applicable per contract framework; LD may apply for deviations or delays
Must supply 23-item automotive component catalog through Indian Army procurement channels
OEM or Authorized Seller with registered Indian office for after-sales support for imported items
Submit Vendor Code Creation documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Comply with advance sample approval process within 5 days of contract award
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
SONITPUR, ASSAM
Indian Army
BHOPAL, MADHYA PRADESH
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
EAST SIKKIM, SIKKIM
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Fly Wheel Assy | Fly Wheel Assy | 1 | nos | milangem | 21 |
| 2 | Wheel Stud | Wheel Stud | 20 | nos | milangem | 21 |
| 3 | Brake Pad Front | Brake Pad Front | 4 | nos | milangem | 21 |
| 4 | Cable Assy Speedometer | Cable Assy Speedometer | 1 | nos | milangem | 21 |
| 5 | Cable Assy 4X4 | Cable Assy 4X4 | 1 | nos | milangem | 21 |
| 6 | Suspension Bush Kit | Suspension Bush Kit | 1 | nos | milangem | 21 |
| 7 | Brake Shoe Assy | Brake Shoe Assy | 4 | nos | milangem | 21 |
| 8 | Spring Set | Spring Set | 4 | nos | milangem | 21 |
| 9 | Master Cyl Assy | Master Cyl Assy | 1 | nos | milangem | 21 |
| 10 | Hand Brake Shoe | Hand Brake Shoe | 2 | nos | milangem | 21 |
| 11 | Rear Door Lock | Rear Door Lock | 1 | nos | milangem | 21 |
| 12 | Air Filter | Air Filter | 1 | nos | milangem | 21 |
| 13 | Oil Filter | Oil Filter | 1 | nos | milangem | 21 |
| 14 | Fuel Filter | Fuel Filter | 1 | nos | milangem | 21 |
| 15 | Ball Joint | Ball Joint | 2 | nos | milangem | 21 |
| 16 | Wind Screen Glass | Wind Screen Glass | 1 | nos | milangem | 21 |
| 17 | W Strip Frt Door Opening Inr RH | W Strip Frt Door Opening Inr RH | 1 | nos | milangem | 21 |
| 18 | W Strip Frt Door Opening Inr LH | W Strip Frt Door Opening Inr LH | 1 | nos | milangem | 21 |
| 19 | Head Lamp Assy RH | Head Lamp Assy RH | 1 | nos | milangem | 21 |
| 20 | Bumper Assy Front | Bumper Assy Front | 1 | nos | milangem | 21 |
| 21 | Front Applique Grill | Front Applique Grill | 1 | nos | milangem | 21 |
| 22 | Front Fog Lamp | Front Fog Lamp | 1 | nos | milangem | 21 |
| 23 | Fender Assy | Fender Assy | 1 | nos | milangem | 21 |
GST certificate
PAN card
Cancelled cheque
EFT mandate certified by bank
OEM authorization (for imported products)
Vendor code creation documents as per Buyer Terms
Technical bid documents
Experience certificates (if applicable)
Financial statements (if applicable)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S SUPER SALE CORPORATION Under PMA | - | 07-11-2025 21:39:17 | Qualified |
| 2 | SAI TRADERS Under PMA | - | 07-11-2025 22:05:00 | Qualified |
| 3 | SHREE ENTERPRISES Under PMA | - | 07-11-2025 21:04:21 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/S SUPER SALE CORPORATION Under PMA | ₹97,050 | Item Categories : Fly Wheel Assy,Wheel Stud,Brake Pad Front,Cable Assy Speedometer,Cable Assy 4X4,Suspension Bush Kit |
| L2 | SHREE ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | ₹1,01,998 | Item Categories : Fly Wheel Assy,Wheel Stud,Brake Pad Front,Cable Assy Speedometer,Cable Assy 4X4,Suspension Bush Kit |
| L3 | SAI TRADERS (MSE)( MSE Social Category:General ) Under PMA | ₹1,46,350 | Item Categories : Fly Wheel Assy,Wheel Stud,Brake Pad Front,Cable Assy Speedometer,Cable Assy 4X4,Suspension Bush Kit |
Key insights about UTTARAKHAND tender market
To bid, ensure your organization is eligible under the Indian Army procurement terms, with a valid PAN/GST, canceled cheque, and EFT mandate. Prepare vendor code paperwork, OEM authorizations for imported parts, and a plan to deliver 23 identified items per the sample-approval process.
Submit PAN Card, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate. For imported items, provide OEM authorization and office in India for after-sales service; include technical bid documents and any experience certificates as applicable.
Post contract award, provide 1 advance sample within 5 days. Buyer approves or lists modifications within 5 days; bulk supply must match the approved sample. Delays in buyer approval may extend the delivery period without liquidated damages, per the contract framework.
Yes, the purchaser reserves the right to increase or decrease orders up to 25% of bid quantity at contract placement and during currency at contracted rates; delivery timeline adjusts using the specified formula with a minimum 30 days extension.
The catalog includes components such as Fly Wheel Assembly, Wheel Stud, Front Brake Pad, Cable Assembly 4X4, Suspension Bush Kit, Master Cylinder Assembly, Wind Screen Glass, Front Fog Lamp, Head Lamp Assembly, and additional front-end and body components listed in the BOQ sections.
Imported items must be supported by an OEM or Authorized Seller with a registered Indian office for after-sales service; provide certification proving the authorized status and India-based service capability as part of bid submission.
Delivery terms follow the last delivery order date; if the original period is under 30 days, the extension equals the original period. Extended delivery time scales with increased quantity, ensuring a minimum 30-day extension as per option clause.
The 5-day sample window ensures rapid alignment with contract specifications; failure to align may trigger modifications or contract termination at the buyer’s discretion; ensure internal QA and supplier readiness for quick approvals and deviations handling.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS