BEML Frame Assembly with Bumper Tender Kolar Karnataka ISO 9001 2024-25

Bid Publish Date

03-Oct-2026, 12:02 pm

Bid End Date

21-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue03-Oct-2026, 12:02 pm
Corrigendum13-Oct-2026
AwardPending

Key Highlights

  • • ISO 9001 certification mandatory for bidder or OEM
  • • 50% quantity variation option clause with extended delivery time formula
  • • Pre-dispatch inspection by BEML SIT and post-receipt inspection by BEML QUALITY
  • • Data Sheet must be uploaded; RFQ must be duly filled and signed

Tender Overview

Bharat Earth Movers Limited (BEML), under the Department of Defence Production, seeks Frame Assembly with Bumper (510MF01024) in KOLAR, KARNATAKA. No BOQ items are listed; however, the tender requires Data Sheet submission and a duly filled RFQ. The contract includes a flexible quantity clause allowing up to 50% incremental quantity at contracted rates, with delivery timelines calculated from the original delivery period and a minimum of 30 days. The procurement emphasizes supplier ISO 9001 certification, GST compliance, and rigorous inspection regimes through BEML SIT and BEML QUALITY. The opportunity is conditioned by payment terms of 45 days for MSME vendors and 60 days for non-MSME vendors, with final pricing inclusive of all taxes. Housing this within BEML’s Defence Production framework, the tender focuses on certified frame assemblies meeting specified quality controls and pre/post inspection requirements, ensuring traceability and conformity to data sheets.

Technical Specifications & Requirements

  • Product/category: Frame Assembly with Bumper for 510MF01024
  • Standards/Certifications: ISO 9001 (certification held by bidder or OEM)
  • Inspection: Pre-dispatch inspection at seller premises via BEML SIT; Post-receipt inspection at consignee site via BEML QUALITY
  • Documentation: Upload of Data Sheet; Duly filled RFQ; OEM authorizations if applicable
  • Delivery terms: Option for up to 50% quantity variation, delivery period extendable per option clause, minimum 30 days
  • Payment: 45 days for MSME, 60 days for non-MSME against receipt/acceptance
  • GST: Bidder to determine GST; reimbursement as actuals or applicable rates, whichever lower
  • Contact: Clarifications via email and phone per ATC

Terms, Conditions & Eligibility

  • EMD/Deposit: Not specified in data; bidders should prepare as per ATC
  • Delivery Window: Delivery period as per original order; extended period governed by option clause
  • Acceptance: Nominated agencies conduct inspections pre/post; acceptance contingent on data sheet match
  • Payment Terms: Receipt & acceptance terms per MSME vs Non-MSME
  • Documentation: Include RFQ, Data Sheet, GST, PAN, ISO 9001 certificates if applicable
  • GST: Vendor bears GST obligations; reimbursement aligned with actuals or lower rate
  • Qualification: ISO 9001 certification required; OEM certification may be necessary
  • Inquiry: Contact for drawings & QAP via provided email/phone

Key Specifications

  • Product/service: Frame Assembly with Bumper for 510MF01024

  • Quantity: Not specified; quantity variation up to 50% allowed

  • Estimated value: Not disclosed

  • Standards: ISO 9001

  • Inspection: BEML SIT (pre-dispatch) and BEML QUALITY (post-receipt)

  • Warranty/AMC: Not specified in data

Terms & Conditions

  • Option clause allows up to 50% quantity variation at contracted rates

  • ISO 9001 certification required by bidder or OEM

  • Post-delivery inspection by BEML QUALITY and pre-dispatch by BEML SIT

  • 45 days MSME and 60 days non-MSME payment terms

  • Bidder to upload Data Sheet and duly filled RFQ

Important Clauses

Payment Terms

Receipt & acceptance: 45 days for MSME vendors, 60 days for non-MSME vendors; inclusive of all taxes

Delivery Schedule

Option to increase quantity up to 50% during contract; delivery duration recalculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in available data; subject to ATC and contract terms

Bidder Eligibility

  • Bidder or OEM must hold ISO 9001 certification

  • Ability to upload Data Sheet and RFQ with bid

  • GST registration and compliant invoicing

  • Acceptance of MSME/non-MSME payment terms

Advertisement

Tender Data

Bid Details

Quantity

20

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Frame Assembly with Bumper - 510MF01024

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

10

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

270

Delivery Locations

1

Delivery Cities

KOLAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KOLARKOLAR--20270-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9970448.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bharat Earth Movers Limited (beml)

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

21-Oct-2026, 9:30 am

Opening Date

22-Oct-2026, 9:30 am

Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Duly filled and signed Tender RFQ

2

Data Sheet of the product offered

3

GST registration certificate

4

PAN card

5

ISO 9001 certification ( bidder or OEM )

6

OEM authorization or authorization letters if applicable

7

Experience certificates and financial statements (if requested in ATC)

8

Any pre-qualification documents as per ATC

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for BEML frame assembly tender in Karnataka 2026

To bid, submit the duly filled RFQ and Data Sheet, ensure ISO 9001 certification, provide GST and PAN, and attach OEM authorization if required. Prepare payment terms aligned to MSME (45 days) or non-MSME (60 days) and be ready for pre-dispatch and post-receipt inspections by BEML SIT and BEML QUALITY.

What documents are required for BEML 510MF01024 tender in Karnataka

Submit RFQ, Data Sheet, GST certificate, PAN card, ISO 9001 certificate, OEM authorizations, and any experience/financial statements requested. Ensure data sheet matches product specifications and that all taxes are quoted inclusively. Pre-dispatch and post-receipt inspections will verify compliance.

What are the delivery terms for frame assembly tender in Karnataka

Delivery terms allow an option to increase quantity up to 50% at contracted rates. The extended delivery period is calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum extension of 30 days; ensure readiness for extended schedule if option is exercised.

What standards must be met for BEML frame bumper procurement

Bidders must hold ISO 9001 certification; the Data Sheet must align with product specifications. Pre-dispatch inspection by BEML SIT and post-receipt inspection by BEML QUALITY are mandatory to ensure conformity and traceability.

How are payments processed for MSME suppliers in this tender

MSME vendors receive payment upon receipt and acceptance within 45 days. Non-MSME vendors follow a 60-day timeline. Ensure accurate GST invoicing and timely submission of acceptance documentation for prompt processing.

What is the significance of the Data Sheet in this bid

The Data Sheet is a critical reference for matching technical parameters. Any mismatch can lead to bid rejection. Upload the complete Data Sheet with the bid, ensure consistency with the product offered, and verify alignment with ISO 9001 requirements.

Who conducts inspections for this frame assembly tender

Inspections are conducted by BEML SIT for pre-dispatch and BEML QUALITY for post-receipt at the consignee site. Conformity checks include data sheet verification and compliance with ISO 9001 standards; pass is required for acceptance and payment release.

What is the scope of the 50% option clause in procurement

The purchaser may increase ordered quantity by up to 50% during contract at contracted rates. Delivery time adjusts proportionally: (additional quantity/original quantity) × original delivery period, with a minimum 30-day extension; ensure contract terms accommodate potential quantity changes.

Advertisement