Progress
RAOrganization: Hindustan Petroleum Corporation Ltd. The procurement covers design, detail engineering, manufacturing, assembly, factory testing, and supply of Dual arm CNG Car cum Auto dispenser along with Comprehensive Maintenance Charges for 1st to 4th year post-warranty, under SCHEDULE 1 and SCHEDULE 2. Estimated value is not disclosed; EMD is ₹118,000. Location data not specified in the tender, which focuses on nationwide HPCL CNG infrastructure projects. A key differentiator is the inclusion of multi-year maintenance charges beyond warranty and a flexi-quantity option up to 25% during and after contract execution. Tender emphasizes broad scope for design and integration of dual-arm CNG dispensers.
Quantity variation up to 25% at contract; both original and extended delivery periods apply
EMD of ₹118000 required; payment terms unspecified in data
Maintenance charges span 4 years post-warranty for each schedule
Eligibility criterion 1
Eligibility criterion 2
Eligibility criterion 3
Start
07-Aug-2026, 11:00 am
End
20-Aug-2026, 7:00 pm
Duration: 320 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
2156
Category
SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Group wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
152
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser , SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period , SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser , SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser
SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser as per tender document
SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period
SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document
SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period
SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document
SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period
SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document
SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period
SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document
SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser
SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser as per tender document
SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period
SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document
SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period
SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document
SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period
SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document
SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period
SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser | SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser as per tender document | 40 | nos | con3.hpcl.rj | 365 | |
| 2 | SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period | SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document | 480 | machine months | con3.hpcl.rj | 365 | |
| 3 | SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period | SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document | 480 | machine months | con3.hpcl.rj | 365 | |
| 4 | SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period | SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document | 480 | machine months | con3.hpcl.rj | 365 | |
| 5 | SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period | SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document | 480 | machine months | con3.hpcl.rj | 365 | |
| 6 | SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser | SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser as per tender document | 4 | nos | con3.hpcl.rj | 365 | |
| 7 | SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period | SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document | 48 | machine months | con3.hpcl.rj | 365 | |
| 8 | SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period | SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document | 48 | machine months | con3.hpcl.rj | 365 | |
| 9 | SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period | SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document | 48 | machine months | con3.hpcl.rj | 365 | |
| 10 | SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period | SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document | 48 | machine months | con3.hpcl.rj | 365 |
Extended Deadline
04-Jun-2026, 11:30 am
Opening Date
04-Jun-2026, 12:00 pm
Extended Deadline
01-Jun-2026, 9:30 am
Opening Date
01-Jun-2026, 10:00 am
Extended Deadline
28-May-2026, 9:30 am
Opening Date
28-May-2026, 10:00 am
GST registration certificate
PAN card
Experience certificates for prior CNG dispenser projects
Financial statements (audited if available)
EMD payment receipt or transaction record
Technical bid documents and drawings
OEM authorizations / dealership certificates (if applicable)
ATC/Buyer uploaded documents reference
Key insights about RAJASTHAN tender market
Bidders must submit GST, PAN, and experience certificates, plus EMD of ₹118,000. Review the ATC for OEM authorizations and 4-year maintenance charges. Ensure design, engineering, and manufacturing capabilities meet CNG dispenser standards and delivery obligations under the option clause.
Required documents include GST certificate, PAN, audited financial statements, experience certificates for similar dispensers, EMD payment proof, technical bid, and OEM authorizations. ATC uploaded by HPCL outlines exact formats and submission portals.
Maintenance charges cover 1st through 4th post-warranty years for each schedule. Exact annual rates are specified in the schedule documents; bidders should align pricing in line with the 4-year maintenance scope and delivery terms.
EMD is ₹118,000. It must be submitted with the bid as per HPCL ATC; ensure payment method matches portal requirements and include bid reference in payment details.
The purchaser can increase/decrease quantity up to 25% of bid quantity at contract time and during currency. Delivery period adjusts proportionally with a minimum extension of 30 days.
Standards are not explicitly listed in the data; bidders should consult the ATC for ISI/ISO specifications and OEM requirements, and ensure testing and factory acceptance criteria are met before delivery.
Prepare detailed design, engineering, fabrication, and testing plans; include OEM authorizations, compliance statements with referenced standards, and maintenance plan for 4 years post-warranty. Align with the 10-item BOQ without assuming quantities.
The tender data provided does not specify the deadline; bidders should monitor HPCL portal and ATC document for submission dates and portal login requirements; prepare all documents in advance.