TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd Dual Arm CNG Dispenser Design & Maintenance Tender India 2026 – IS/ISO Standards, EMD ₹118000

Bid Publish Date

14-May-2026, 10:29 am

Bid End Date

04-Jun-2026, 5:00 pm

EMD

₹1,18,000

Generate Docs

Progress

RA
Issue14-May-2026, 10:29 am
Corrigendum01-Jun-2026
Reverse Auction07-Aug-2026, 11:00 am
AwardPending

Tender Overview

Organization: Hindustan Petroleum Corporation Ltd. The procurement covers design, detail engineering, manufacturing, assembly, factory testing, and supply of Dual arm CNG Car cum Auto dispenser along with Comprehensive Maintenance Charges for 1st to 4th year post-warranty, under SCHEDULE 1 and SCHEDULE 2. Estimated value is not disclosed; EMD is ₹118,000. Location data not specified in the tender, which focuses on nationwide HPCL CNG infrastructure projects. A key differentiator is the inclusion of multi-year maintenance charges beyond warranty and a flexi-quantity option up to 25% during and after contract execution. Tender emphasizes broad scope for design and integration of dual-arm CNG dispensers.

Technical Specifications & Requirements

  • Product/service names: Dual arm CNG Car cum Auto dispenser, Dual arm CNG Combo dispenser (SCHEDULE 2)
  • Scope: Design, detail engineering, manufacturing, assembly, factory testing, supply; 4-year comprehensive maintenance (after warranty) for each schedule
  • Maintenance charges: 1st, 2nd, 3rd, 4th year post-warranty; separate line items per schedule
  • Quantity flexibility: Option clause permits ±25% quantity variation at contract price; time extensions calculated by (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
  • Delivery timeline: Delivery period adjustments governed by option clause; baseline delivery period not specified
  • BoQ: 10 items listed; no explicit unit quantities provided in the data
  • EMD: ₹118,000 required to participate
  • Standards/Testing: Not specified in provided data; ATC document uploaded by buyer
  • Location: No city/state provided; tender appears to be HPCL nationwide
  • Vendor notes: Compliance with option clause and multi-year maintenance is expected; ATC document should be reviewed for technical compliance

Terms, Conditions & Eligibility

  • EMD: ₹118,000 specified; payment method not described in data
  • Delivery terms: Baseline delivery window not stated; extended delivery time rules activated by the option clause
  • Quantity variation: Eligible up to ±25% of bid quantity at contract time and during currency
  • Contract scope: Includes both design/engineering/manufacture and post-warranty maintenance charges for up to 4 years
  • Documentation: ATC file uploaded; bidders should review for OEM authorizations and technical bid requirements
  • Compliance: Bidders must adhere to option clause and delivery extension calculations; no explicit penalties listed in provided data
  • BoQ clarity: 10 items in the BOQ with no explicit quantities; bidders should seek clarifications on itemization
  • Warranty: Post-warranty maintenance charges are defined but warranty terms are not specified in the provided data

Terms & Conditions

  • Quantity variation up to 25% at contract; both original and extended delivery periods apply

  • EMD of ₹118000 required; payment terms unspecified in data

  • Maintenance charges span 4 years post-warranty for each schedule

Bidder Eligibility

  • Eligibility criterion 1

  • Eligibility criterion 2

  • Eligibility criterion 3

Authority & Contact

Reverse Auction Schedule

Completed

Start

07-Aug-2026, 11:00 am

End

20-Aug-2026, 7:00 pm

Duration: 320 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

2156

Category

SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

152

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser , SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period , SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period , SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser , SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period , SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9325821.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser

SCHEDULE 1 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Car cum Auto dispenser as per tender document

40 nos Delivery: 365 days
#2

SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period

SCHEDULE 1 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document

480 machine months Delivery: 365 days
#3

SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period

SCHEDULE 1 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document

480 machine months Delivery: 365 days
#4

SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period

SCHEDULE 1 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document

480 machine months Delivery: 365 days
#5

SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period

SCHEDULE 1 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document

480 machine months Delivery: 365 days
#6

SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser

SCHEDULE 2 Design detail engineering manufacturing assembly factory testing supply of Dual arm CNG Combo dispenser as per tender document

4 nos Delivery: 365 days
#7

SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period

SCHEDULE 2 Comprehensive Maintenance Charges for 1st year i e after warranty period as per tender document

48 machine months Delivery: 365 days
#8

SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period

SCHEDULE 2 Comprehensive Maintenance Charges for 2nd year i e after warranty period as per tender document

48 machine months Delivery: 365 days
#9

SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period

SCHEDULE 2 Comprehensive Maintenance Charges for 3rd year i e after warranty period as per tender document

48 machine months Delivery: 365 days
#10

SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period

SCHEDULE 2 Comprehensive Maintenance Charges for 4th year i e after warranty period as per tender document

48 machine months Delivery: 365 days

Categories 3

Corrigendum Updates

4 Updates
#1

Update

01-Jun-2026

Extended Deadline

04-Jun-2026, 11:30 am

Opening Date

04-Jun-2026, 12:00 pm

#2

Update

28-May-2026

Extended Deadline

01-Jun-2026, 9:30 am

Opening Date

01-Jun-2026, 10:00 am

#3

Update

21-May-2026
#4

Update

21-May-2026

Extended Deadline

28-May-2026, 9:30 am

Opening Date

28-May-2026, 10:00 am

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for prior CNG dispenser projects

4

Financial statements (audited if available)

5

EMD payment receipt or transaction record

6

Technical bid documents and drawings

7

OEM authorizations / dealership certificates (if applicable)

8

ATC/Buyer uploaded documents reference

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for HPCL CNG dispenser tender in India 2026

Bidders must submit GST, PAN, and experience certificates, plus EMD of ₹118,000. Review the ATC for OEM authorizations and 4-year maintenance charges. Ensure design, engineering, and manufacturing capabilities meet CNG dispenser standards and delivery obligations under the option clause.

What documents are required for HPCL CNG tender submission 2026

Required documents include GST certificate, PAN, audited financial statements, experience certificates for similar dispensers, EMD payment proof, technical bid, and OEM authorizations. ATC uploaded by HPCL outlines exact formats and submission portals.

What are the maintenance charges for HPCL CNG dispensers

Maintenance charges cover 1st through 4th post-warranty years for each schedule. Exact annual rates are specified in the schedule documents; bidders should align pricing in line with the 4-year maintenance scope and delivery terms.

What is the EMD amount for HPCL dispenser tender 2026

EMD is ₹118,000. It must be submitted with the bid as per HPCL ATC; ensure payment method matches portal requirements and include bid reference in payment details.

What are the quantity variation rules for HPCL CNG dispenser project

The purchaser can increase/decrease quantity up to 25% of bid quantity at contract time and during currency. Delivery period adjusts proportionally with a minimum extension of 30 days.

What installation standards apply to HPCL CNG dispensers 2026

Standards are not explicitly listed in the data; bidders should consult the ATC for ISI/ISO specifications and OEM requirements, and ensure testing and factory acceptance criteria are met before delivery.

How to prepare technical bid for HPCL dual arm dispenser

Prepare detailed design, engineering, fabrication, and testing plans; include OEM authorizations, compliance statements with referenced standards, and maintenance plan for 4 years post-warranty. Align with the 10-item BOQ without assuming quantities.

When is the bid submission deadline for HPCL CNG equipment tender

The tender data provided does not specify the deadline; bidders should monitor HPCL portal and ATC document for submission dates and portal login requirements; prepare all documents in advance.