TenderDekho Logo
Active GEM

NLC Tamil Nadu Power Limited SCR 1&2 SLEW GREASE PUMP Lincoln Tender Tuticorin TN 2026

Bid Publish Date

01-Oct-2026, 7:20 pm

Bid End Date

19-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue01-Oct-2026, 7:20 pm
Corrigendum12-Oct-2026
AwardPending

Key Highlights

  • • Lincoln brand requirements for SCR grease pumps and metering devices
  • • Warranty: 12 months from commissioning or 18 months from receipt (whichever earlier)
  • • Option clause to increase/decrease quantity up to 25% during/after contract
  • • Post-receipt inspection by NTPL; pre-dispatch not applicable unless ATC

Tender Overview

Organization: NLC Tamil Nadu Power Limited, located in Tuticorin, Tamil Nadu 627713. Procurement: SCR 1&2 SLEW GREASE PUMP (LINCOLN), PUMPING ELEMENT K7(LINCOLN), PRIMARY METERING DEVICE SSV-6KS(LINCOLN), SECONDARY METERING DEVICE SSV-6K(LINCOLN). Quantity/Value: supply of goods only; exact quantities not disclosed. Location: Tuticorin, Tamil Nadu. Key differentiator: Lincoln-brand pumping and metering equipment expected; detailed technical specs to be supplied in tender documents. Unique aspects: Warranty clause and option to adjust quantity up to 25% during contract.

Technical Specifications & Requirements

  • Scope: Only supply of goods (no services).
  • Products: SCR grease pump (Lincoln), pumping element K7 (Lincoln), primary metering device SSV-6KS (Lincoln), secondary metering device SSV-6K (Lincoln).
  • Warranty: 12 months from commissioning or 18 months from receipt, whichever is earlier.
  • Certificates: Manufacturer certificate and interchangeability certificate as per Test Certificate Clause.
  • Delivery terms: Option clause allows quantity variation up to 25%; delivery period calculated with minimum 30 days; extension mechanics outlined.
  • Inspection: Post-receipt inspection by NTPL executives; pre-dispatch inspection not applicable unless ATC specifies otherwise.
  • Payment/EMD: Online RTGS payment accepted; PBG alternative; required bid documents include PAN, GSTIN, cancelled cheque, EFT mandate.

Terms, Conditions & Eligibility

  • EMD/Payment terms: EMD details not specified; online payment via RTGS/Internet banking permitted; provide contract reference in transfer.
  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; certificates may be required for bid acceptance.
  • Delivery & penalties: Quantity adjustments up to 25% with contract rates; delivery timeline starting from last date of original DO.
  • Inspection: Post-receipt inspection at consignee site by NTPL executives.
  • Warranty and compliance: 12-month warranty from commissioning or 18-month from receipt; ensure manufacturer/interchangeability certificates.
  • Eligibility: Bidder must comply with ATC terms and submit all required documents; inspection agency to be NTPL-appointed.

Key Specifications

  • Product names: SCR grease pump (LINCOLN), pumping element K7(LINCOLN), primary metering device SSV-6KS(LINCOLN), secondary metering device SSV-6K(LINCOLN)

  • Delivery: supply of goods only; quantity adjustment up to 25%

  • Warranty: 12 months from commissioning or 18 months from receipt

  • Inspection: post-receipt inspection by NTPL executives

  • Certificates: manufacturer and interchangeability certificates per test clause

Terms & Conditions

  • 25% quantity variation rights during/after contract

  • Online RTGS payment accepted; PBG alternative

  • Post-receipt inspection at NTPL site

Important Clauses

Payment Terms

On-line RTGS/internet banking payment accepted; contract number and seller name to be included in transfer notes.

Delivery Schedule

Delivery period starts from last date of original delivery order; extended delivery time follows option clause with minimum 30 days.

Penalties/Liquidated Damages

Penalties/LD terms not explicitly provided; bidder must adhere to delivery and inspection requirements as per ATC.

Bidder Eligibility

  • Submit PAN, GSTIN, cancelled cheque, EFT Mandate

  • Provide manufacturer and interchangeability certificates

  • Comply with optional quantity variation up to 25% at contract rates

Advertisement

Tender Data

Bid Details

Quantity

34

Category

SCR 1&2 SLEW GREASE PUMP (LINCOLN)

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

12 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SCR 1&2 SLEW GREASE PUMP (LINCOLN) , PUMPING ELEMENT K7(LINCOLN) , PRIMARY METERING DEVICE SSV- 6KS(LINCOLN) , SECONDARY METERING DEVICE SSV- 6K(LINCOLN)

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

23

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Tuticorin

Delivery Pincodes

628004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manivannan Selvaraj628004,NLC TAMILNADU POWER LIMITED 2X500 MW THERMAL POWER PLANT HORBOUR ESTATE, TUTICORINTuticorinTamil Nadu628004290-

Authority Records

MINISTRY OF COALNLC TAMIL NADU POWER LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9874664.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Tuticorin 628004

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

12-Oct-2026

Extended Deadline

19-Oct-2026, 9:30 am

Opening Date

20-Oct-2026, 9:30 am

Advertisement

Categories 7

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Manufacturer certificate and interchangeability certificate

6

Any other certificates requested in bid document/ATC

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for Lincoln equipment tender in Tuticorin

To bid in this tender, bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate; provide manufacturer and interchangeability certificates; and comply with post-receipt inspection by NTPL. Ensure Lincoln-brand SCR grease pump and metering devices are offered with required certificates.

What documents are required for NLC Tamil Nadu Power Limited procurement

Required documents include PAN, GSTIN, cancelled cheque, EFT Mandate, and manufacturer/interchangeability certificates. Ensure online RTGS payment capability and upload proofs within 15 days of award, along with contract references for payment transfers.

What are the technical specifications for Lincoln pumps in this tender

Technical scope includes SCR grease pump, Lincoln K7 pumping element, primary SSV-6KS, and secondary SSV-6K metering devices. Exact performance specs are provided in the bid document; ensure ISI/AAA/TRTL or equivalent certifications are available where specified.

When is delivery expected for Lincoln equipment under NTPL tender

Delivery period begins after the last date of the original delivery order; quantity adjustments up to 25% may extend timelines; minimum extension is 30 days. Maintain compliance with post-receipt inspection by NTPL executives.

What is the warranty period for Lincoln equipment supply

Warranty rights state 12 months from commissioning or 18 months from receipt of material, whichever occurs earlier, covering manufacturing defects and interoperability with Lincoln components.

How is payment processed for this procurement in Tamil Nadu

Payment can be made online via RTGS/internet banking to NLC Tamil Nadu Power Limited; Bidder must upload transfer proof within 15 days of award and include contract details in the transfer description.

Advertisement