GEM

Western Railway Transformer Turns Ratio Test Set Tender 240V 50Hz ISO Standards 2025

Posted

01 Nov 2025, 11:35 am

Deadline

11 Nov 2025, 11:00 am

Progress

Issue01 Nov 2025, 11:35 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • Explicit operation voltage and test voltage: 240 Volt, 50 Hz
  • Three-phase transformer turns ratio measurement without vector-conversion
  • Option Clause enabling ±25% quantity variation during contract and currency
  • Scope includes supply, installation, testing, commissioning, operator training
  • MSE purchase preference: must be manufacturer for product, traders excluded
  • No BOQ items available; indicates consolidated technical requirement
  • Delivery timing rules based on original delivery period with minimum 30 days extension
  • ATC clauses permit extension of delivery duration within contract limits

Tender Overview

The Western Railway division of Indian Railways invites bids for a Transformer Turns Ratio Test Set (BHEL) to support on-site testing of three-phase transformers. The scope includes supply, installation, testing, commissioning, operator training, and any required statutory clearances. The technical terms mandate a 240 Volt, 50 Hz operation and an AC 240 Volt test voltage with accurate turns ratio measurement across different vector groups without phase conversion. The contract supports quantity adjustments up to 25% during and after award, with delivery timing linked to the original delivery period and extended time rules. The procurement emphasizes local supplier eligibility under MSE preferences and requires compliance with center-purchasing policies where applicable. The absence of a BOQ implies a compact but high-precision electrical test instrument with strict performance and compliance expectations.

Technical Specifications & Requirements

  • Organization: Western Railway, Indian Railways
  • Product: Transformer Turns Ratio Test Set (BHEL), three-phase transformer measurement
  • Power & Voltage: Operation voltage 240 Volt, 50 Hz; Test voltage 240 Volt AC
  • Measurement: Measures actual turns ratio for different vector groups across various transformers without conversion
  • Delivery Scope: Supply, Installation, Testing, Commissioning, Operator Training, and statutory clearances if applicable
  • Compliance: Must align with standard electrical testing practices and provide accurate vector group verification for TIAs
  • Standard/Quality: Explicit 3-phase measurement with vector group coverage; no conversions required
  • Delivery Timing: Delivery period linked to original delivery order with option for extension as per clause; minimum 30 days extension applied if required
  • Eligibility: MSE purchase preference available if bidder is the manufacturer; traders excluded
  • ATC: Buyer's option to adjust quantity ±25% and extend if necessary

Terms, Conditions & Eligibility

  • EMD & Payment Terms: Not specified in the data; bidders should prepare standard EMD as per Railway guidelines and await notification for exact amount and payment schedule
  • Delivery: Delivery period commences from the last date of the original delivery order; additional time calculated as (Increase quantity / Original quantity) × Original delivery period with minimum 30 days
  • Scope: Bid price must include supply, installation, testing, commissioning, operator training, and any required statutory clearances
  • MSE Preference: Manufacturer eligibility required for MSE preference; price within L-1 + 15% may be considered for 25% share under the policy
  • Acceptance Terms: Compliance with standard supplier terms; bidder must adhere to the option clause for quantity and timeextensions
  • Warranty & Penalties: Not explicitly specified; standard manufacturer warranty and LD terms would apply per IR procurement norms

Key Specifications

    • Product/service: Transformer Turns Ratio Test Set for 3-phase transformers
    • Key quantities: Not specified in BOQ; prepare for single or multiple unit supply
    • EMD/Estimated value: Not provided; bidders should monitor tender portal for exact figures
    • Experience: Demonstrated ability to supply and commission transformer test sets
    • Standards: Compliance with general electrical testing standards; vector group verification capability

Terms & Conditions

  • Quantity can vary by ±25% at bid-to-contract stage

  • Delivery period linked to original delivery order with minimum 30 days extension

  • MSE preference available only if bidder is manufacturer for goods

Important Clauses

Payment Terms

Not specified in data; follow standard railway procurement terms and notifications for EMD and milestones

Delivery Schedule

Delivery period to begin after last date of original order; time extension formula and minimum 30 days apply

Penalties/Liquidated Damages

Not specified; standard L&D terms would apply per IR procurement norms

Bidder Eligibility

  • Bidder must be the manufacturer to avail MSE preference for goods

  • Traders are excluded from MSE eligibility

  • Experience in supplying transformer testing equipment and on-site commissioning

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

- GST registration certificate

2

- PAN card

3

- Experience certificates for similar Transformer Turns Ratio test sets

4

- Financial statements (last 2-3 years) demonstrating stability

5

- EMD submission as per railway guidelines (amount to be announced)

6

- Technical compliance documentation for the Transformer Turns Ratio Test Set

7

- OEM authorization/c авторizations if bidding as manufacturer

8

- Any statutory clearances relevant to installation/testing

Frequently Asked Questions

How to bid for transformer testing equipment tender in Western Railway 2025

Bidders must register on the government portal, submit GST and PAN, provide experience certificates for transformer test sets, and furnish EMD as per railway guidelines. Include OEM authorizations if not the manufacturer and comply with MSE preference rules where eligible; ensure 240V operation and AC test voltage specs.

What documents are required for transformer turns ratio test set bid in India

Required documents include GST certificate, PAN card, financial statements, experience certificates for similar equipment, EMD submission, technical compliance certificates, and OEM authorizations. Also provide installation/commissioning capabilities and training plan as part of technical bid.

What are the technical specifications for turns ratio test sets 2025

Key specs specify 240 Volt, 50 Hz operation; 240 Volt AC test voltage; capability to measure actual turns ratio for various vector groups in three-phase transformers without vector-conversion. Manufacturer should demonstrate vector group coverage and accuracy in tests.

What is the delivery timeline for transformer test set supply Western Railway

Delivery period is linked to the last date of the original delivery order with possible extension. If quantity increases, additional time is calculated as (increase/original quantity) × original delivery period, with a minimum extension of 30 days.

How does MSE preference apply to transformer testing equipment bid

MSE preference applies if the bidder is the product manufacturer; price within L-1 + 15% may be considered to award 25% of total value to MSE seller. Traders are excluded from this preference, so ensure primary manufacturing capabilities or partner accordingly.

What are the warranty and penalties for this Western Railway bid

Warranties and penalties are not explicitly stated; bidders should expect standard railway procurement norms with manufacturer warranties, and potential liquidated damages clauses as per contract terms. Confirm exact LD rates and warranty duration during bid clarifications.

Similar Tenders

11 or 33 kV Outdoor Live Tank Current Transformer (BHEL)

Energy Department Uttar Pradesh

GAUTAM BUDDHA NAGAR, UTTAR PRADESH

EMD: ₹9,000
Est: ₹10.0 L
View Details

11 or 33 kV Outdoor Live Tank Current Transformer (BHEL)

Energy Department Uttar Pradesh

SAHARANPUR, UTTAR PRADESH

EMD: ₹72,000
Est: ₹84.4 L
View Details

11 or 33 kV Outdoor Live Tank Current Transformer (BHEL)

Electricity Department, Andaman & Nicobar

SOUTH ANDAMAN, ANDAMAN & NICOBAR

EMD: ₹14,000
Est: ₹7.0 L
View Details

Supply and Installation of Test Set up for Transformer Testing for Narol Lab., Ahmedabad

VADODARA, GUJARAT

EMD: ₹10,000
View Details