Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903
Food Corporation Of India (fci)
KANPUR NAGAR, UTTAR PRADESH
Bid Publish Date
24-Feb-2026, 2:53 pm
Bid End Date
17-Mar-2026, 3:00 pm
EMD
₹14,400
Progress
Quantity
100
Bid Type
Two Packet Bid
The procurement is issued by the Directorate Of Horticulture And Farm Forestry, Chhattisgarh for an HDPE Woven Bed Vermiculture bed (Vermibed) ISI Marked to IS 15907. The item scope is a single product category with ISI certification, placing emphasis on quality compliance rather than multiple line items. The buyer enforces an ECM/ATC uploaded stipulation and requires ISO 9001 accreditation for bidders or the OEM. An EMD of ₹14,400 accompanies the bid, and the notice permits a quantity variation up to 25% during contract execution. This tender targets suppliers capable of meeting financial turnover prerequisites over the last three years and sustaining delivery within the defined window, with eligibility for OEM turnover criteria in case of bunch bids. The absence of a BOQ implies a product-based award focused on compliance and capability rather than bulk itemization. This opportunity aligns with government procurement of agricultural infrastructure materials under the ISI framework.
HDPE Woven Vermiculture Bed (Vermibed)
ISI marked to IS 15907 (Q3)
EMD ₹14,400
OEM turnover criteria for bid validity
ISO 9001 certification mandatory for bidder or OEM
Order quantity may vary up to 25% during contract
Delivery period linked to last date of original order with extension rules
EMD of ₹14,400 and required ISI IS 15907 certification
25% quantity variation permitted at contract placement and during currency
ISO 9001 certification mandatory for bidder or OEM; turnover proof required
EMD ₹14,400; payment terms to be defined in bid documents; ensure compliant with university/department norms
Delivery period commences from last date of original delivery order; extended period rules apply with minimum 30 days
Penalty clauses to be as per GFR and ATC; LD applicable for delayed delivery as defined in contract
Minimum average annual turnover over the last 3 years as per bid document
ISO 9001 certification for bidder or OEM
IS 15907 ISI marked Vermibed product compliance
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Food Corporation Of India (fci)
KANPUR NAGAR, UTTAR PRADESH
Indian Army
JAMMU, JAMMU & KASHMIR
N/a
SURGUJA, CHHATTISGARH
Food Corporation Of India (fci)
WEST TRIPURA, TRIPURA
Border Road Organisation
BIJAPUR, CHHATTISGARH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Specification | Product ISI marked | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate showing three-year turnover
ISO 9001 certificate (bidder or OEM)
OEM authorization letter (if bidding on behalf of OEM)
Bid security deposit (EMD) receipt
Product ISI marking certificate for Vermibed IS 15907
Technical compliance certificates per ATC
Any relevant experience certificates in Vermiculture bed supplies
Bidders must submit GST, PAN, three-year turnover evidence, and ISO 9001 certification for bidder or OEM. Include ISI IS15907 Vermibed proof, EMD ₹14,400, and ATC-compliant certificates. Ensure 25% quantity variation rights are acknowledged, and provide audited financials or CA certificates with bid.
Required documents include GST certificate, PAN, turnover certificates (audited or CA), ISO 9001 certificate, OEM authorization if applicable, EMD payment proof, ISI Vermibed IS 15907 certificate, and ATC/corrigendum certificates; attach all as a single bid package.
Product must be ISI marked Vermibed with IS 15907 compliance; HDPE woven bed suitable for vermiculture; include ISI certificate and marking details; supply must be ISO 9001 compliant either for bidder or OEM; provide related testing certificates if available.
EMD is ₹14,400; payment terms follow government norms as per ATC; ensure submission of EMD receipt with bid; payment schedule will be governed by contract terms and GFR rules; confirm whether online or DD payment method is acceptable.
Delivery can be extended if the option clause is exercised; quantity may increase by up to 25%; extended delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must show minimum average annual turnover for last three years ending 31 March; provide audited balance sheets or CA certificate; bidders incorporated less than 3 years rely on completed years post-constitution for turnover calculations.
Yes, ISO 9001 certification is mandatory; either the bidder or the OEM must hold the certification for the offered Vermibed product; upload certification documents with the bid and ensure alignment with IS 15907 and ISI marking.
OEMs must meet turnover criteria for the last three years, provide audited finance statements or CA certificates, and ensure ISI IS15907 Vermibed compliance; in bunch bids, the OEM related to the primary product with the highest bid value must satisfy turnover criteria.
Directorate Of Horticulture And Farm Forestry, Cg.
📍 RAJNANDGAON, CHHATTISGARH
Directorate Of Horticulture And Farm Forestry, Cg.
📍 DANTEWADA, CHHATTISGARH
Directorate Of Horticulture And Farm Forestry, Cg.
📍 RAJNANDGAON, CHHATTISGARH
Directorate Of Horticulture And Farm Forestry, Cg.
N/a
📍 KORBA, CHHATTISGARH
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS