TenderDekho Logo
Closed GEM

Open Tender for LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup in GURGAON, HARYANA

Bid Publish Date

27-Jun-2025, 6:25 pm

Bid End Date

18-Aug-2025, 11:00 am

EMD

₹12,75,000

Generate Docs

Progress

RA
Issue27-Jun-2025, 6:25 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

35473

Category

LAN setup

Bid Type

Two Packet Bid

Categories 38

Power Grid Corporation Of India Limited has released a public tender for LAN setup, Wi-Fi setup, NMS, Man Power, ICT in GURGAON, HARYANA. Quantity: 35473. Submission Deadline: 18-08-2025 11: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LAN setup , Wi-Fi setup , NMS , Man Power , ICT

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7970914.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 55 Items Sign in for GEM prices

#1

LAN setup

L3 Managed Core Switch - 48 Port (HA Mode)

1 pair Delivery: 56 days
#2

LAN setup

L3 Managed Core Switch - 24 Port

6 nos Delivery: 56 days
#3

LAN setup

L2 Managed Access Switch - 48 Port

60 nos Delivery: 56 days
#4

LAN setup

L2 Managed Access Switch - 24 Port

40 nos Delivery: 56 days
#5

LAN setup

10G Multi-Mode Module

50 nos Delivery: 56 days
#6

LAN setup

Cable Cat 6A, 4 pair, UTP

3,050 mtrs Delivery: 56 days
#7

LAN setup

Patch Cord Cat 6A UTP 15 cm

1,500 nos Delivery: 56 days
#8

LAN setup

Patch Cord Cat 6A UTP 1 Mtr

150 nos Delivery: 56 days
#9

LAN setup

Patch Cord Cat 6A UTP 2 Mtr

100 nos Delivery: 56 days
#10

LAN setup

Cat 6A I/O Face Plate with SMB

200 nos Delivery: 56 days
#11

LAN setup

25mm PVC Conduit

400 mtrs Delivery: 56 days
#12

LAN setup

24 Port Patch Panel Loaded

20 nos Delivery: 56 days
#13

LAN setup

1U PVC Cable Manager

5 nos Delivery: 56 days
#14

LAN setup

Laying of Cat 6A Cable

3,050 mtrs Delivery: 56 days
#15

LAN setup

Installation & configuration of L2 Switches

100 nos Delivery: 56 days
#16

LAN setup

Installation & configuration of L3 Switches

8 nos Delivery: 56 days
#17

LAN setup

Installation of Patch Panels (20 nos.) & Termination of LAN Points (100 nos.)

1 ls Delivery: 56 days
#18

LAN setup

Fixing and Termination of SMB and I/O

200 nos Delivery: 56 days
#19

LAN setup

Installation Charges of PVC Conduit

400 mtrs Delivery: 56 days
#20

Wi-Fi setup

Wireless Controller (HA Mode)

1 pair Delivery: 56 days
#21

Wi-Fi setup

Access Points

160 nos Delivery: 56 days
#22

Wi-Fi setup

Unified Threat Management Device (HA Mode)

1 pair Delivery: 56 days
#23

Wi-Fi setup

Unified Threat Management (Minimum 100 users)

10 nos Delivery: 56 days
#24

Wi-Fi setup

L2 Managed PoE Access Switch - 24 Port

13 nos Delivery: 56 days
#25

Wi-Fi setup

10G Single Mode Module

16 nos Delivery: 56 days
#26

Wi-Fi setup

Cable Cat 6A, 4 pair, UTP

4,575 mtrs Delivery: 56 days
#27

Wi-Fi setup

25mm PVC Conduit

2,500 mtrs Delivery: 56 days
#28

Wi-Fi setup

RJ45 connector

500 nos Delivery: 56 days
#29

Wi-Fi setup

6 Core Single Mode Fiber cable

2,000 mtrs Delivery: 56 days
#30

Wi-Fi setup

40 MM HDPE Pipe

2,000 mtrs Delivery: 56 days
#31

Wi-Fi setup

HDPE Pipe Jointer

50 nos Delivery: 56 days
#32

Wi-Fi setup

6 Core Multi Mode Fiber cable

750 mtrs Delivery: 56 days
#33

Wi-Fi setup

12 Port LIU Fully loaded SM

5 nos Delivery: 56 days
#34

Wi-Fi setup

12 Port LIU Fully loaded MM

3 nos Delivery: 56 days
#35

Wi-Fi setup

48 Port LIU Fully loaded MM

1 nos Delivery: 56 days
#36

Wi-Fi setup

3 mtrs LC-LC Fiber patch Cord (Single Mode)

12 nos Delivery: 56 days
#37

Wi-Fi setup

3 mtrs LC-LC Fiber Patch Cord (Multi Mode)

60 nos Delivery: 56 days
#38

Wi-Fi setup

9U Network rack with wall mount arrangments

2 nos Delivery: 56 days
#39

Wi-Fi setup

6 Socket 5/15amp PDU

3 nos Delivery: 56 days
#40

Wi-Fi setup

PVC Accessories ( Tape, Tie, Ferrule, Steel Ware, Gitty Screw, Saddle, Black Screw, labels, wooden ladder 8 feet cross 2no. , etc)

1 lot Delivery: 56 days
#41

Wi-Fi setup

Laying of Cat 6A Cable

4,575 mtrs Delivery: 56 days
#42

Wi-Fi setup

Installation & configuration of L2 Switches

13 nos Delivery: 56 days
#43

Wi-Fi setup

Installation & configuration of Wireless Access Point

160 nos Delivery: 56 days
#44

Wi-Fi setup

Installation & configuration of Wireless Controller

2 nos Delivery: 56 days
#45

Wi-Fi setup

Installation & configuration of UTM

2 nos Delivery: 56 days
#46

Wi-Fi setup

Installation Charges of PVC Conduit

2,500 mtrs Delivery: 56 days
#47

Wi-Fi setup

Laying of Fiber Cable

2,000 mtr Delivery: 56 days
#48

Wi-Fi setup

Installation of Rack

2 nos Delivery: 56 days
#49

Wi-Fi setup

Installation of LIU

9 nos Delivery: 56 days
#50

Wi-Fi setup

Laying of HDPE pipe

2,000 mtrs Delivery: 56 days
#51

Wi-Fi setup

Splicing of Pigitail

144 nos Delivery: 56 days
#52

Wi-Fi setup

Soft Digging

2,000 mtrs Delivery: 56 days
#53

NMS

Network Management Software for centralized management of up to 1,000 network devices.

1 nos Delivery: 56 days
#54

Man Power

Onsite Resident Network Engineer for 05 years - 03 nos.

60 months Delivery: 56 days
#55

ICT

Installation, Commissioning, Testing, Training and Onsite support charges for 05 years for entire setup

1 lot Delivery: 56 days

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

07-Aug-2025

Extended Deadline

18-Aug-2025, 11:00 am

Opening Date

18-Aug-2025, 11:30 am

#2

Update

31-Jul-2025
#3

Update

18-Jul-2025

Extended Deadline

25-Jul-2025, 11:00 am

Opening Date

25-Jul-2025, 11:30 am

Reverse Auction Schedule

Completed

Start

01-Jan-2026, 4:00 pm

End

02-Jan-2026, 4:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
BLACK BOX LIMITED   Under PMA
-18-08-2025 10:52:09
2
LRS SERVICES PRIVATE LIMITED   Under PMA
-17-08-2025 21:13:01
3
VELOCIS SYSTEMS PRIVATE LIMITED   Under PMA
-18-08-2025 10:38:05

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1LRS SERVICES PRIVATE LIMITED(MII)   Under PMA Winner ₹8,11,59,330Item Categories : LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup
L2VELOCIS SYSTEMS PRIVATE LIMITED   Under PMA₹8,15,23,580Item Categories : LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup
L3BLACK BOX LIMITED   Under PMA₹11,41,35,410Item Categories : LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup,LAN setup

🎉 L1 Winner

LRS SERVICES PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹8,11,59,330