Clutch Cyl Assy,Sleeve Cyl Assy,Pressure Plate,Air Filter,Suspension Bush Kit,Knuckle Bearing,Front
Indian Army
DEHRADUN, UTTARAKHAND
Progress
Quantity
19
Category
Wheel Cyl Assy
Bid Type
Two Packet Bid
Indian Army (Department Of Military Affairs) invites bids for procurement of wheel components and related motorcycle/vehicle parts including Wheel Cyl Assy, Tendom Master Cyl, Brush Carrier Plate, FD Sprocket 15T, Fan Belt, AC Belt, Wiper Blade Front, Bush, Hose Filter Outlet Assy, Knuckle Bearing, Clutch Assy Complete, Shaft Seal, Needle Bearing. The BOQ lists 13 items with unspecified quantities. The process requires advance sample approval within 5 days and approval of Detailed Design Drawings within 5 days of contract award. The buyer reserves option to modify quantities up to 25% and may extend delivery per contracted rates. No explicit start date or end date provided.
Option clause allows ±25% quantity variation during contract and delivery window.
Advance sample approval and Detailed Design Drawings approval must be completed within 5 days.
Vendor code creation requires PAN, GSTIN, cancelled cheque, and EFT mandate submission.
Not specified in the tender data; payment terms to be verified during contract finalization
Delivery period may be extended per option clause; no LDs described for buyer delays in drawings/samples approval
No explicit LD rate published; delays tied to approval timelines may adjust delivery period without LDs
Must provide PAN, GSTIN, cancelled cheque, EFT mandate
Must submit Detailed Design Drawings within 5 days of award
Must provide advance sample within 5 days and comply with approved drawings
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
ALWAR, RAJASTHAN
Indian Army
Ajmer, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Wheel Cyl Assy | 2574-4215-0113 | 2 | nos | srjco.48 | 21 |
| 2 | Tendom Master Cyl | 2530-002370 | 2 | nos | srjco.48 | 21 |
| 3 | Brush Carrier Plate | L01402000041 | 1 | nos | srjco.48 | 21 |
| 4 | FD Sprocket 15T | 3020-015945 | 1 | nos | srjco.48 | 21 |
| 5 | Fan Belt | 2.79E+11 | 1 | nos | srjco.48 | 21 |
| 6 | AC Belt | 2.79E+11 | 1 | nos | srjco.48 | 21 |
| 7 | Wiper Blade Front | 5408-8240-0120 | 2 | nos | srjco.48 | 21 |
| 8 | Bush | 5365-001008 | 1 | nos | srjco.48 | 21 |
| 9 | Hose Filter Outlet Assy | 2789-1411-0324 | 1 | nos | srjco.48 | 21 |
| 10 | Knuckle Bearing | 09265M45002 | 2 | nos | srjco.48 | 21 |
| 11 | Clutch Assy Complete | 2520-013072 | 1 | nos | srjco.48 | 21 |
| 12 | Shaft Seal | 2786-0399-9928 | 2 | nos | srjco.48 | 21 |
| 13 | Needle Bearing | 3110-108998 | 2 | nos | srjco.48 | 21 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN certificate copy
Cancelled cheque copy
Certified EFT mandate
Advance sample submission (within 5 days of award)
Detailed Design Drawings submission (within 5 days of award)
Any OEM authorizations or technical compliance certificates if applicable
Vendor code creation documents as per T&C
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation. Provide Detailed Design Drawings within 5 days of award and advance samples for approval within 5 days. Ensure conformity to 13 listed components and comply with option-based quantity variations up to 25%.
Required documents include PAN Card copy, GSTIN certificate, cancelled cheque, and EFT mandate certified by bank. These enable vendor code creation and participation in the bidding process for the Department of Military Affairs.
No explicit technical specs are published; the scope lists 13 item categories such as Wheel Cyl Assy and FD Sprocket 15T. The buyer will approve Detailed Drawings and advance samples; delivery aligns with modifications if drawings are not approved promptly.
Advance sample approval must be completed within 5 days of contract award. The buyer may approve the sample or list modifications within 5 days; delays extend the delivery period without LDs as compensation.
The purchaser may increase or decrease quantity up to 25% at contract placement and during the currency, with calculated delivery time based on (increased quantity/original quantity) × original delivery period, minimum 30 days.
The tender data does not disclose an EMD amount or estimated contract value. Bidders should await clarification or seek supplier inquiries through the proper procurement channel before submission.
Delays in buyer approval of drawings/samples trigger a refix of the delivery period with no liquidated damages specified; suppliers should accelerate response to avoid timeline shifts.
Documentation verification includes PAN, GSTIN, cancelled cheque, and EFT mandate; ensure bank-certified EFT forms and current GST registration to prevent bid disqualification.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS