Kamdhenu University Boiler Repairing and Parts Tender Gujarat Agriculture Department 2026

Bid Publish Date

19-Oct-2026, 10:50 am

Bid End Date

05-Nov-2026, 5:00 pm

EMD

₹15,000

Progress

Issue19-Oct-2026, 10:50 am
AwardPending

Tender Overview

Kamdhenu University, under the Agriculture And Co-operation Department Gujarat, seeks bids for comprehensive boiler-related services and component fabrication, including dismantling, insulation, MS pipe work (1 inch), SS fabrication, GI sheets, welding, and installation for milk processing equipment. The scope covers repair, replacement parts, fabrication, and reinstallation across multiple boiler and plant subsystems, with 20 total items in the BOQ. Estimated value is not disclosed; EMD is ₹15,000. The project location appears to be in Gujarat; the tender emphasizes logistics and varied mechanical work, with option clauses for quantity variation up to 25% and extended delivery timelines. This procurement targets qualified mechanical contractors with experience in industrial boiler systems and related fabrication, welding, and insulation tasks. A clear differentiator is the wide range of fabrication and installation activities tied to dairy processing equipment, including milk pasteurizer and packing lines. Unique terms include the option-based quantity extension and a mandatory compliance framework defined in ATC documentation.

Technical Specifications & Requirements

  • Categories: Boiler repairing, boiler parts, pipeline dismantling, MS pipe fabrication and installation, aluminum insulation, SS fabrication, GI sheets, SS 304 box pipe, SS band and unions, Argon welding, milk processing plant components, boiler valves, and related insulation work.
  • Quantity/Value signals: 20 items in BOQ; EMD ₹15,000; no explicit total estimated value disclosed.
  • Work scope highlights: Dismantling, fabrication, welding, installation, reinstallation, and commissioning related to instant plant and pasteurizer systems. Delivery windows are governed by option clauses and original delivery period, with minimum 30 days for extended delivery.
  • Quality/Standards: Specific standards not listed in data; bidders should refer to ATC documents for compliance requirements.
  • Delivery/Installation: Cold-chain dairy equipment context; ensure compatibility with SS 304 and GI components; welding to be conducted with Argon.
  • Experience: Preference for contractors with boiler and dairy equipment fabrication experience and knowledge of aluminum insulation work.

Terms, Conditions & Eligibility

  • EMD: ₹15,000 (payment and submission terms per ATC).
  • Delivery: Quantity-based extension up to 25%; extended delivery time computed as (Increase/Original) × Original period, min 30 days; original delivery period may be extended within contract limits.
  • Financial standing: Bidder must not be under liquidation or bankruptcy; an undertaking must be uploaded.
  • Documentation: Upload all certificates and documents sought in bid, ATC, and corrigendum; missing documents may lead to rejection.
  • ATC provisions: Supplier must comply with uploaded ATC; non-compliance may result in bid rejection.
  • BoQ: 20 items, with N/A specifics in data; bidders should prepare for diverse fabrication and installation tasks.

Key Specifications

  • Boiler repairing and parts provision

  • MS pipe work (1 inch) and MS pipe fabrication

  • Aluminum insulation dismantling and new installation

  • SS fabrication including SS 304 box pipe and band

  • GI sheets fabrication and seats

  • Argon welding and welding-related tasks

  • Milk pasteurizer plant components and milk packing machine integration

  • Milk plant gas kit and boiler valve components

  • 20-item BOQ; quantities not disclosed

Terms & Conditions

  • EMD of ₹15,000 required with bid submission

  • Quantity variation up to 25% during contract

  • Delivery period tied to original timeline with option-based extensions

  • Non-compliance with ATC or missing certificates leads to rejection

Important Clauses

Payment Terms

Payment terms are governed by ATC; no explicit schedule provided in data

Delivery Schedule

Delivery window adjusts with option quantity; minimum 30 days for extended delivery

Penalties/Liquidated Damages

LD terms not specified in data; contract likely follows standard government LD norms per ATC

Bidder Eligibility

  • Not under liquidation or bankruptcy; provide undertaking

  • Experience in boiler repair/fabrication for industrial dairy equipment

  • Compliance with ATC and submission of all required certificates

Advertisement

Tender Data

Bid Details

Quantity

316

Category

Boiler repairing and parts

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+20%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

8

Past Performance

20 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Boiler repairing and parts , Boiler service , Boiler pipe line old Dismantling Work , MS pipe 1 inch , MS pipe Fabrication , MS. pipe aluminum insulation Dismantling work , MS. pipe aluminum insulation new work aluminum insulation installation , Instant plant half framing Dismantling , Instant plant S.S. Fabrication , GI Sheets , SS. 304 box pipe GI seats fabrication work Argon Welding work , Instant plant new parts , Instant plant fabrication work , Instant plant reinstall , S.S. 304 band, union , Milk pasteurizer Plant gas kit , Milk pasteurizer Plant , Milk packing machine , Boiler valve , Other

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

27-10-2026 10:00:00

Pre-Bid Venue

Cattle Breeding Farm, College of Veterinary Science & A.H., Kamdhenu University, Gandhigram, IV Nagar, Junagadh 362001 (Gujarat)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Junagadh

Delivery Pincodes

362001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Karangiya Vijay Karshanbhai362001,Iav nagar road, near jafar medan Kamdhenu University, JunagadhJunagadhGujarat362001115-

Authority Records

AGRICULTURE AND CO-OPERATION DEPARTMENTKAMDHENU UNIVERSITY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10003091.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Kamdhenu University Gandhinagar

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

Boiler repairing and parts

As per attached detailed specification

1 nos Delivery: 15 days
#2

Boiler service

As per attached detailed specification

1 nos Delivery: 15 days
#3

Boiler pipe line old Dismantling Work

As per attached detailed specification

1 mtr Delivery: 15 days
#4

MS pipe 1 inch

As per attached detailed specification

50 mtr Delivery: 15 days
#5

MS pipe Fabrication

As per attached detailed specification

50 mtr Delivery: 15 days
#6

MS. pipe aluminum insulation Dismantling work

As per attached detailed specification

50 mtr Delivery: 15 days
#7

MS. pipe aluminum insulation new work aluminum insulation installation

As per attached detailed specification

50 mtr Delivery: 15 days
#8

Instant plant half framing Dismantling

As per attached detailed specification

1 nos Delivery: 15 days
#9

Instant plant S.S. Fabrication

As per attached detailed specification

40 mtr Delivery: 15 days
#10

GI Sheets

As per attached detailed specification

5 nos Delivery: 15 days
#11

SS. 304 box pipe GI seats fabrication work Argon Welding work

As per attached detailed specification

2 mtr Delivery: 15 days
#12

Instant plant new parts

As per attached detailed specification

2 nos Delivery: 15 days
#13

Instant plant fabrication work

As per attached detailed specification

2 nos Delivery: 15 days
#14

Instant plant reinstall

As per attached detailed specification

1 nos Delivery: 15 days
#15

S.S. 304 band, union

As per attached detailed specification

2 nos Delivery: 15 days
#16

Milk pasteurizer Plant gas kit

As per attached detailed specification

50 nos Delivery: 15 days
#17

Milk pasteurizer Plant

As per attached detailed specification

1 nos Delivery: 15 days
#18

Milk packing machine

As per attached detailed specification

1 nos Delivery: 15 days
#19

Boiler valve

As per attached detailed specification

5 nos Delivery: 15 days
#20

Other

As per attached detailed specification

1 nos Delivery: 15 days
Advertisement

Categories 37

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (industrial boiler/fabrication)

4

Financial statements or financial solidity documents

5

EMD instrument (₹15,000) or online payment receipt

6

Technical bid documents per ATC

7

OEM authorizations or fabrication certifications (if applicable)

8

Company profile and project references

9

Any certificates requested in Buyer Added ATC

Frequently Asked Questions

Key insights about GUJARAT tender market

What documents are required for boiler repair tender in Gujarat 2026?

Bidders must submit GST registration, PAN card, experience certificates, financial statements, EMD of ₹15,000, technical bid documents, OEM authorizations (if applicable), company profile, and certificates requested in the ATC. Ensure all documents match tender terms and ATC to avoid rejection.

How to participate in Kamdhenu University boiler tender in Gujarat?

Prepare and upload all mandatory documents per ATC, including EMD ₹15,000, and demonstrate boiler fabrication or repair experience. Ensure compliance with 25% quantity variation and delivery extension rules. Submit ORNs and competency certificates with the bid packet.

What are the technical requirements for MS pipe and insulation in this bid?

Requirements cover MS pipe fabrication (1 inch), aluminum insulation dismantling and new installation, and SS fabrication (SS 304). Welding should be Argon-based, and GI sheets fabrication included. Refer to ATC for exact workmanship standards and testing protocols.

What is the EMD amount for Kamdhenu University boiler procurement?

The EMD amount is ₹15,000. Submit payment or instrument as per ATC instructions; ensure EMD is valid for bid validity period and complies with online or DD format as required.

What delivery terms apply if quantity increases during contract?

Quantity may increase up to 25% of bid quantity; delivery period adjusts using the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Extensions align with original period and contract terms.

What standards or certifications are required for boiler work in Gujarat?

While explicit standards aren’t listed in the data, ATC requires uploading relevant certificates and supplier qualifications. Expect compliance with industry welding and fabrication norms and any organization-specific certifications requested in ATC or corrigenda.

When is the bid submission deadline for the Gujarat boiler tender 2026?

Exact submission deadlines aren’t provided in the data. Bidders should review the ATC and corrigenda for finalized dates, ensure timely submission of EMD ₹15,000 and all required documents to avoid disqualification.

What is the scope of work for milk processing equipment in this tender?

Scope includes milk pasteurizer plant components, milk packing machine integration, and related insulation and fabrication tasks. Additional items cover milk plant gas kit, boiler valves, and SS GI fabrications, all aligned with dairy processing line maintenance.