TenderDekho Logo
GEM

Open Tender for Annealed solid round bare copper wire 8SWG(4mm dia) as per IS 191: Part 5 of 100 meter length,5x6mm in ERNAKULAM, KERALA

Bid Publish Date

15-Sep-2025, 9:16 am

Bid End Date

06-Oct-2025, 2:00 pm

Generate Docs

Progress

Issue15-Sep-2025, 9:16 am
Corrigendum29-Sep-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

22

Category

Annealed solid round bare copper wire 8SWG(4mm dia) as per IS 191: Part 5 of 100 meter length

Bid Type

Single Packet Bid

Categories 10

Public procurement opportunity for Hindustan Organic Chemicals Limited Annealed solid round bare copper wire 8SWG(4mm dia) as per IS 191: Part 5 of 100 meter length, 5x6mm Electrolytic grade Copper strip as per IS 1897(2008) in ERNAKULAM, KERALA. Quantity: 22 issued by. Submission Deadline: 06-10-2025 14: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Annealed solid round bare copper wire 8SWG(4mm dia) as per IS 191: Part 5 of 100 meter length , 5x6mm Electrolytic grade Copper strip as per IS 1897(2008)

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSCHEMICALS AND PETROCHEMICALS DEPARTMENTHINDUSTAN ORGANIC CHEMICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8350776.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

29-Sep-2025

Extended Deadline

06-Oct-2025, 2:00 pm

Opening Date

06-Oct-2025, 2:30 pm