WINDING RESISTANCE METER
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Bid Publish Date
02-Jul-2026, 5:06 am
Bid End Date
20-Jul-2026, 11:30 am
EMD
₹1,28,120
Value
₹64,05,753
Location
Progress
Tender Type
Open
Tender Fee
₹11,800
Tender Fee Exemption
No
EMD Exemption
Yes
Category
ELECTRICAL
The issuing authority invites bids for Procurement of 5 nos. of Transformer Winding Resistance Meter(TWRM) in BIHAR. Submission Deadline: 20-07-2026 11: 30: 00. Submit your proposal before the deadline.
Processing Fee
₹1,180
Tender Currency
INR
Bid Currency
INR
Ranking Sequence
L1 Ranking
Estimated Value Visibility
Y
Bid To RA
No
Organization Hierarchy
Government of Bihar->Bihar State Power Transmission Company Limited->BSPTCL->Headquarter->Operation Maintenance
Approving Authority
Chief Engineer OM BSPTCL (CE)
Tender Creator
Mr Praveen Kumar (EXECUTIVE ENGINEER)
Pre-Bid Meeting Start
09-07-2026 05:30:00
Pre-Bid Meeting End
09-07-2026 07:30:00
Pre-Bid Discussion Type
OFFLINE
Pre-Bid Venue
Chief Engineer (Transmission OM), 4th Floor, Vidyut Bhawan-II, J. L. Nehru Marg, Patna-800001
| Type | Amount | Currency | Mode | Exemption |
|---|---|---|---|---|
| EMD | ₹1,28,120 | INR | Internet Payment Gateway(IPG),Challan|Bank Guarantee | Yes |
| Tender Fee | ₹11,800 | INR | Internet Payment Gateway(IPG),Challan| | No |
| Tender Processing Fee | ₹1,180 | INR | Internet Payment Gateway(IPG),Challan| | No |
GST CERTIFICATE
Annual Turnover certificate for last 5 years (2025-26,2024-25, 2023-24, 2022-23, 2021-22 )
Exemption certificate for EMD as per tender clause -1.35.3
ITR for last 5 years
Audited balance sheet for last 5 years
Purchase order, Work order and related performance certificate as per tender clause 1.20
Type test reports as per tender clause 1.20
PAN Card and Aadhar Card of company owner
Declaration of local content in prescribed format
Declaration of Bidders/ Manufacturers/ EPC Contractors in prescribed format
Affidavit for non blacklisting as per tender clause 1.89
Affidavit for type test/routine test as per tender clause
Any other documents required for qualification may be submitted
Name & Designation of the officer of the Bidder/Manufacturer to whom all reference shall be made for expeditious technical co-operation-
Place of Manufacturer
Service of facilities available
Availability of spare parts
Bidder proposal no & Date
Annual production units for past 5 years
Annual Turnover for the 2021-22 (in Rs. Crores)
Annual Turnover for the 2022-23 (in Rs. Crores)
Annual Turnover for the 2023-24 (in Rs. Crores)
Annual Turnover for the 2024-25 (in Rs. Crores)
Annual Turnover for the 2025-26 (in Rs. Crores)
Average Annual Turnover for best three years out of last five financial years. (in Rs. Crores).
Liquid assets (current assets minimum inventories) and/or evidence of excess to or availability of credit facilities of our company(Specify amount with Date)(Rs in crores)
Make
Model no.
Technical specification of Transformer winding Resistance Meter (TWRM)
Confirm whether equipment shall be suitable for measuring DC winding resistance of all Transformers & Reactors up to 400 KV Transformer/ Reactors where high inductance is present
Confirm whether three independent measuring channel quick stabilization period available
Confirm whether equipment shall employ four wire methods and no lead compassion shall be required for the measurement
Confirm that the test kit should simultaneous measure and display of three channel winding resistance of all three winding in single connection of kit with transformer
Confirm that equipment have Direct heat run test mode.
Confirm the Test Current Range(50 Amp DC continuous then open circuit voltage is greater than equal to 50 V Or If 25A/30 DC continuous then open circuit voltage greater than equal to 100V)
Confirm whether equipment has Current flow alert
Over range
Open ckt Test Voltage range (42V DC or more)
Confirm whether 4 � Digit display for resistance
Confirm whether 3 � digit display for test current
Resolution
Accuracy
Measurement Ranges
Confirm whether the equipment shall have in-built demagnetization circuitry which shall allow the operator to manually/automatically demagnetize the transformer core, either before or upon completion of resistance testing, or as a standalone feature.
Confirm that the kit should have the facility to have correction of resistance value to a reference temp. i.e. provide temp. compensated reading of resistance (For Cu & AI)
Confirm whether keyboard in front panel and ineractive
Power supply
Confirm whether built-in-discharge circuit should be provided to discharge the specimen when test is completed or when current lead accidentally disconnects or when instrument power supply is lost.
Confirm whether the kit should have all necessary protections against transient voltages, induction, short circuits etc.
Confirm whether the kit should have facility of discharging the specimen when test is completed or when current cable accidently disconnected or when instrument power supply lost
Storage(internal, upto 1000 sets of reading)
Confirm kit should offer Repeatability of test results in 400kV charge area
Confirm whether the kit should have necessary in built cooling arrangement should be provided to dissipate heat generated during testing. No external coolent/accessory shall have to be required
Confirm Software should be suitable for automatic testing and report generation including temperature compensation
Confirm kit should have facility to connect with window based computer/ laptop for extracting data.
Confirm that the complete equipment along with complete accessories must be designed/ engineered by Original Equipment Manufacturer.
Accessories details
Confirm that Unit shall be duly calibrated before supply and the date of calibration shall not be older than two month from the date of supply of Kit. However party will have to submit the calibration certificate from/traceable to, NABL accredited lab or internationally reputed lab. Date of calibration shall not be older than two months from the date of supply of Kit.
confirm that the kit should be compatible for EMI/EMC/ safety environment requirement as per IEC. Temp 0 to 50 Deg.C, Humidity not condensing-up to 95%,
The relevant standards should be as below;- Ingress Protection: IP54 CE Certification Safety: Meets requirement of IEC 61010-1 EMC: Meets requirement of IEC 61326-1
The kit and accessories shall be robust and rugged enough, so that the transportation from one station to other will not affect the performance and accuracy of measurement of kit.
Confirm that Bidder will have to submit the documentary evidences of having established mechanism for prompt services as and when required by BSPTCL. Bidder need to submit their organization service chart along with bid
Confirm that The contractor shall have to demonstrate the instrument to the satisfaction of BSPTCL. The Supplier shall have to ensure the kit is made user friendly apart from the detailed demonstrations at each site. The instrument failed during the demonstration shall be rejected.
Confirm that Supplier shall have to ensure that the instrument is made user friendly. Apart from the detailed demonstration at site, the supplier shall also have to arrange necessary training to BSPTCL engineers
Security deposit as per clause 1.36 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.
Security deposit as per clause 1.36 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.
Whether delivery schedule indicated in the specification is acceptable
Whether delivery schedule indicated in the specification is acceptable
Whether penalty for delay in delivery as indicated in the specification is acceptable
Whether penalty for delay in delivery as indicated in the specification is acceptable
Whether terms of payment indicated in the specification is acceptable
Whether terms of payment indicated in the specification is acceptable
Whether guarantee clause indicated in the specification in acceptable
Whether guarantee clause indicated in the specification in acceptable
Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted
Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted
Whether Board's terms of insurance as per specification is acceptable
Whether Board's terms of insurance as per specification is acceptable
Whether agreeable to enter into a contract in event of order
Whether agreeable to enter into a contract in event of order
Are prices quoted in the price bid FIRM. Only FIRM price shall be quoted.
Are prices quoted in the price bid FIRM. Only FIRM price shall be quoted.
Whether unit F.O.R. destination prices have been quoted in the price bid
Whether unit F.O.R. destination prices have been quoted in the price bid
Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.
Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.
Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same
Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same
Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same
Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same
Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.
Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.
Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted...
Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted or not.
Offer must be made complete in all respects as per Technical specification.
Offer must be made complete in all respects as per Technical specification.
Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfac...
Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfactorily in BSPTCL, will be preferred. However, in case of equipments of makes, not supplied earlier to BSPTCL the credentials and updated performance reports regarding supplies made to other central and state Power utilities should be furnished. BSPTCL reserves the right to opt for the make and type.
Only type tested equipments and materials shall be supplied by the contractor
Only type tested equipments and materials shall be supplied by the contractor
Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.
Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.
The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fi...
The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fire shall be done and borne by the Tenderer for all the equipment/items devices pertaining to the transmission line under turnkey package till the installation is handed over to BSPTCL authorities.
Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials...
Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials sent by the Tenderer to site by road transportation shall be suitably packed. No separate freight charges shall be paid by BSPTCL.
Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement...
Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement for the stores as well as in the areas of erection till the date of handling over, shall be tenderer's responsibility, Tenderer to arrange their own suitable storage at their cost for materials. Bidder also to construct temporary store as well as Site office at Bidders cost.
Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work fo...
Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work for all tests of the equipment, cable etc. as listed in the schedule of tender. Inspection and testing shall be carried out as per tender specification.
All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.
All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.
Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted u...
Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted unless covered by relevant ISS, IEC on any other relevant approved specification as required.
Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for ...
Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for any part of the work for which the maker are named in the contract. Such contract if given shall not relieve him from any obligation, duty or responsibility as per the terms and conditions of the specification and the contract.
Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of let...
Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of letter of intent. Tenderer also to note that all supply of consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL.
Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.
Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.
Tenderer to confirm that they will furnish Bank Guarantee for advance payment
Tenderer to confirm that they will furnish Bank Guarantee for advance payment
Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement
Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement
Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.
Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.
Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.
Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.
Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPT...
Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPTCL/Purchaser shall not bear any expenditure/liability on this account. Entry tax, if any shall be extra.
The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported good...
The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported goods/items and other taxes and duties on bought-out components, materials, equipments and other items and no such taxes, duties & levies shall be additionally payable by the BSPTCL. Tenderer are also to confirm that no taxes and duties (except entry tax if applicable) shall be payable by the BSPTCL/Purchaser on bought-out items which are dispatched by the Sub-vendors of the contractor directly to the project site on sale-in-transit basis. However, BSPTCL shall provide necessary concessional sales tax declaration from, as concessional sales tax has been included in the price for such sale in transit transactions.
This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the term...
This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the terms and conditions of the tender specification for succesful completion of the complete work as per the tender specifications and both the contract will have a cross fall breach Clause i.e., a breach in one contract will automatically be considered as breech of the other contract which will conform the BSPTCL/Purchaser/ Employer the right to terminate the other contract at th contractor's risk and cost.
It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid ...
It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid by the contractor.
It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, al...
It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, all of which have been detailed out exhaustively in the respective schedules irrespective of what soever has been stated to the contrary any where else in the tender/offer/bid.
Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account w...
Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...
Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any a...
Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are ...
Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...
Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...
Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken ...
Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...
Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any acco...
Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...
Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptio...
Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.
Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaini...
Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaining to any rebate, offered, shall stand with drawn.
Unit rates of items/equipments/works as and where required have been furnished
Unit rates of items/equipments/works as and where required have been furnished
The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.
The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.
The required documents related to the pre-qualification of the tenderers as detailed in the tender specifications has been furnished in the tender. The docum...
The required documents related to the pre-qualification of the tenderers as detailed in the tender specifications has been furnished in the tender. The documents for the fulfillment of the requirement of the tender specifications have been furnished.
Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and co...
Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and complete the entire work in accordance with schedule indicated in the tender/offer. It has been clearly understood that the time for completion of the project is the essence of the contract and hence the execution schedule shall be strictly adhered to the execution schedule has been furnished with the offer.
Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.
Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.
Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed o...
Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed on the bidder. In case of any deviations in the technical specification or make of offered materials/equipments, the BSPTCL shall not be responsibble for any delay even if it is approved proved.
Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work
Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work
Confirm that OEM/Bidder should have supplied and commisioned 25%equipment offered against this tender to leading public sectors in India like POWERGRID/ NTPC...
Confirm that OEM/Bidder should have supplied and commisioned 25%equipment offered against this tender to leading public sectors in India like POWERGRID/ NTPC/ NHPC/ BHEL/ CPRI/ State Transmission & Generation Utilities in India etc. in the preceding 10 years.
Confirm that Performance certificate ensuring minimum one year successful operation of equipment from the date of commissioning to be submitted
Confirm that Performance certificate ensuring minimum one year successful operation of equipment from the date of commissioning to be submitted
Confrim that all terms and conditions stipulated in the tender specification are unconditionally accepted
Confrim that all terms and conditions stipulated in the tender specification are unconditionally accepted
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
NIT
NIT
NIT
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Ntpc Limited
HAZARIBAG, JHARKHAND
N/A
KOKRAJHAR, ASSAM
Andrew Yule Company Limited
KANCHIPURAM, TAMIL NADU
Development Commissioner (micro Small & Medium Enterprises)
Tender Results
Loading results...
Price BOQ
Price BOQ
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Attachment | Rate | Estimated Cost | Mandatory | Price Trends |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Price BOQ | Price BOQ | 1 | Work | - | - | BOQ TWRM nit28.xlsx | ₹64,05,753 | ₹1 | Yes |
Discover companies most likely to bid on this tender
HPCL Biofuels Limited
📍 PURBI CHAMPARAN, BIHAR
📍 TELANGANA
Central Power Research Institute (cpri) Bangalore Karnataka
📍 BANGALORE, KARNATAKA
DC-PDD
📍 Budgam, JAMMU AND KASHMIR
📍 KARNATAKA
Sign up now to access all documents
NIT
NIT
NIT