TenderDekho Logo
GEM

Contract Bidding Open For Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and in JAJAPUR, ODISHA

Bid Publish Date

10-Mar-2026, 12:49 pm

Bid End Date

20-Mar-2026, 1:00 pm

Progress

Issue10-Mar-2026, 12:49 pm
Technical20-03-2026 11:56:40
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

9

Category

Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and PID Controller 4inch 150 presuure rating

Bid Type

Two Packet Bid

Categories 50

Bharat Petroleum Corporation Ltd announces a tender for Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and PID Controller 4inch 150 presuure rating, Supply Installation testing and Commissioning 4 inch 150 Cl Ball Valve As per requirement, Supply Installation testing and Commissioning 4 inch 150 Cl Glob Valve As per requirement, SS Tubing Works with Material Supply Transportation InstallationTesting and Commissioning SS 316, Electrical Works with Materal Supply Transportation Installation as per PID, Steel Piping Fabrication Hydrotesting Painting with Materal Supply Transportation as per PID, Commissioning and Testing complete the work as per requirement at site as per PID in JAJAPUR, ODISHA. Quantity: 9. Submission Deadline: 20-03-2026 13: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and PID Controller 4inch 150 presuure rating , Supply Installation testing and Commissioning 4 inch 150 Cl Ball Valve As per requirement , Supply Installation testing and Commissioning 4 inch 150 Cl Glob Valve As per requirement , SS Tubing Works with Material Supply Transportation InstallationTesting and Commissioning SS 316 , Electrical Works with Materal Supply Transportation Installation as per PID , Steel Piping Fabrication Hydrotesting Painting with Materal Supply Transportation as per PID , Commissioning and Testing complete the work as per requirement at site as per PID

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9101028.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and PID Controller 4inch 150 presuure rating

Refer Tender Document

1 no Delivery: 45 days
#2

Supply Installation testing and Commissioning 4 inch 150 Cl Ball Valve As per requirement

Refer Tender Document

1 no Delivery: 45 days
#3

Supply Installation testing and Commissioning 4 inch 150 Cl Glob Valve As per requirement

Refer Tender Document

3 no Delivery: 45 days
#4

SS Tubing Works with Material Supply Transportation InstallationTesting and Commissioning SS 316

Refer Tender Document

1 ls Delivery: 45 days
#5

Electrical Works with Materal Supply Transportation Installation as per PID

Refer Tender Document

1 ls Delivery: 45 days
#6

Steel Piping Fabrication Hydrotesting Painting with Materal Supply Transportation as per PID

Refer Tender Document

1 ls Delivery: 45 days
#7

Commissioning and Testing complete the work as per requirement at site as per PID

Refer Tender Document

1 ls Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
R S INSTRUMENTATION AND SERVICES   Under PMA
-20-03-2026 11:56:40

Financial Results

Rank Seller Price Item
L1
R S INSTRUMENTATION AND SERVICES(MSE,MII)( MSE Social Category: )    Under PMA
Item Categories : Design detail engineering Supply installation testing commissioning Flow Control Valve with SOV and