Progress
Organization: Gujarat General Administration Department; Product/Service: High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2); Estimated Value: ₹8,00,000; EMD: ₹24,000; Location: Gujarat, India; Scope: Installation, testing, demonstration across multiple locations per State/Central Govt rules; onsite warranty terms to be defined; operational outputs include LED luminaires per carriage, lantern carriage diameter, and octagonal pole specifics; unique clause allows quantity variation up to 25% and extended delivery as per contract; this procurement focuses on supply, installation, testing, commissioning, operator training, and statutory clearances.
LED Flood Light Luminaire: specify LED Rating and Wattage
Octagonal pole: confirm Height (m) and Sheet thickness
Base Plate: confirm Width, Thickness, Length
Wind load: provide regional wind withstand (m/s)
Cable: specify size (mm2)
Onsite warranty period to be defined
25% quantity variation allowed during contract and currency period
Scope includes training and statutory clearances if required
Compliance with State/Central Government installation guidelines
EMD ₹24,000; bid price to include all cost components; payment terms not explicitly stated in available data
Delivery period adjustable with option clause; minimum extension rule set to 30 days
No LD details provided in available data; penalties may be specified in ATC file
Experience in supply/installations of LED lighting on high mast towers or similar structures
Financial capacity to handle ₹8,00,000 estimated scope
Ability to comply with State/Central Govt installation guidelines
Quantity
8
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
16
Past Performance
20 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Mahesana
Delivery Pincodes
384170
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Patel Satishkumar | 384170,Taluka Panchayat Office, Unjha, Dist: Mehsana | Mahesana | Gujarat | 384170 | 8 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN)
Experience certificates for similar LED lighting/high mast installations
Financial statements (last 2 financial years)
EMD payment proof (DD/online transaction receipt)
Technical bid documents demonstrating compliance with LED Luminaire ratings and pole specifications
OEM authorization or dealership certificate (if applicable)
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Installation, testing and demonstration((Installation, testing and demonstration work at multiple locations shall follow as per the guidelines of State/Central Govt rules and regulations as applicable) | Yes,Including Civil Work at sites |
| GENERIC | No of LED Luminaires can be fitted in the carriage of each octagonal pole (in Nos) | 4 |
| GENERIC | Lantern carriage Diameter | 1200, 1500, 2000 Or higher |
| GENERIC | Onsite warranty (in years) | 2, 3, 4, 5 Or higher |
| GENERIC | Height of Octagonal pole (in m) | 9.0 |
| Octagonal Pole Construction | Octagonal pole sheet thickness | 3, 4, 5 Or higher |
| Octagonal Pole Construction | Grades of High Tensile Steel | ISH430LA as per IS:5986 (Grade 355) |
| Base Plate | Width of Base Plate | 300 Or higher |
| Base Plate | Thickness of Base Plate | 16 Or higher |
| Base Plate | Length of Base Plate | 300 Or higher |
| Wind Load | Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) | 50, 55 Or higher |
| Electrical System, Cable and Cable connector | Size of Cable(in sq mm) | 2.5, 4, 10, 16, 25 Or higher |
| LED Flood Light Luminaire | LED Rating/System Wattage/Rated Power (in Watts) | 100 |
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, and financial statements, plus EMD ₹24,000. Provide OEM authorization if applicable, and demonstrate prior experience with high mast or LED flood lighting installations. Ensure compliance with State/Central Govt rules for installation, testing, and demonstration; review ATC terms in the uploaded document.
Required documents include GST certificate, PAN, experience certificates for similar installations, last 2 years financials, EMD proof, and technical bid detailing LED luminaire ratings and pole specs. OEM authorizations and installation capabilities should be included as applicable.
Key specs include LED Rating, System Wattage, and Rated Power per luminaire; carriage diameter, number of luminaires per carriage, and overall pole height (m) are to be defined in the final design; ensure IS/IEC compliance and manufacturer data sheets with performance curves.
The buyer reserves the right to increase or decrease quantity up to 25% of bid quantity at contract placement and during currency, with delivery period adjustments following the calculated formula, minimum 30 days extension where applicable.
EMD is ₹24,000. Payment terms are not fully specified in the available data; bidders should prepare for standard Govt procurement terms and await the ATC document for any advance or milestone payments after supply, installation, and commissioning.
Installation, testing, and demonstration must adhere to State/Central Government rules. The scope includes training of operators and obtaining any statutory clearances if required; ensure workmanship meets wind load and steel grade requirements as per project standards.
Delivery time extension follows the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the purchaser may extend duration up to the original delivery period when exercising the option clause.
Onsite warranty duration is to be specified within the technical specifications; bidders should propose a warranty period that aligns with common industry practice (typically 1–2 years) and include post-installation support terms in the bid.