Mod Sectt Establishment Department of Defence Tender West Kameng Arunachal Pradesh 2026 for Supply Installation Testing and Commissioning of Goods

Bid Publish Date

17-Jul-2026, 7:05 pm

Bid End Date

27-Jul-2026, 8:00 pm

Value

₹15,00,000

Progress

Issue17-Jul-2026, 7:05 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

6

Category

Title 1

Bid Type

Two Packet Bid

Categories 4

Tender Overview

Organization: Mod Sectt Establishment, under the Department of Defence. Location: WEST KAMENG, ARUNACHAL PRADESH - 790001. Estimated value: ₹1,500,000.00. Scope: Supply, Installation, Testing and Commissioning of goods. The tender intends to source multiple line items (6 total) with flexible quantity options up to 25% expansion during contract execution. The bid requires adherence to delivery timelines starting from the original delivery order, with potential extension proportional to added quantity. Emphasis on comprehensive cost inclusion within bid price (SSC). No explicit start/end dates provided.

Technical Specifications & Requirements

  • Delivery scope: Supply, Installation, Testing and Commissioning of Goods (SITC).
  • Bill of quantities: 6 items mentioned, with no individual item details in BOQ (N/A for quantity/units).
  • Policy notes: Option clause allows +/- 25% quantity variation; delivery extensions calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • OEM/Importer terms: If imported, OEM must have registered office in India for after-sales service; certificate to be provided. Turnover requirements reference minimum average annual turnover over last 3 years as per bid document.
  • Supply chain: Bid must include all cost components in bid price (including SITC).
  • Compliance context: General terms mandate compliance with bidder turnover criteria and OEM turnover criteria; specific technical standards not provided.

Terms & Eligibility

  • Turnover criteria: Minimum average annual turnover over the last 3 financial years as indicated in the bid document; audited balance sheets or CA certificate required.
  • OEM turnover: OEM must meet the average turnover criterion; for bundle bids, OEM of the primary product with the highest bid value must satisfy this.
  • Imported products: If applicable, Indian office for after-sales service required plus certificate.
  • Delivery terms: Delivery period to be from original order’s last date; option-driven extensions governed by the option clause.
  • Documentation: Bid must cover all cost components and provide necessary financial documents.

Keywords: tender in West Kameng Arunachal Pradesh; procurement by Mod Sectt Establishment; Defence Department SITC tender; OEM turnover requirement; 25% quantity option; Indian after-sales service certificate.

Important Clauses

Delivery & Quantity Flexibility

Option to increase/decrease order quantity by up to 25% at contract placement and during currency at contracted rates; delivery period adjustments follow a calculated formula with a minimum 30 days.

Scope of Supply

Bid price must cover Supply, Installation, Testing and Commissioning of Goods; no separate post-award charges allowed.

OEM/Imported Product Terms

Imported items require a registered Indian office of the OEM/Authorized Seller for after-sales service; certificate to be provided.

Bidder Eligibility

  • Minimum average annual turnover over the last 3 financial years as specified in bid document

  • Audited financial statements or CA/Cost Accountant certificate for turnover

  • OEM turnover criterion met (highest bid value category if multiple items)

  • For imported items, OEM must have registered Indian office for after-sales service

  • Compliance with delivery extension provisions under the option clause

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Title 1 , Title 2 , Title 3 , Title 4 , Title 5 , Title 6

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

West Kameng

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-West KamengWest Kameng--130-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9625206.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Title 1

Site Preparation as per tech specification document

1 nos Delivery: 30 days
#2

Title 2

Walling as per tech specification document

1 nos Delivery: 30 days
#3

Title 3

Tiling as per tech specification document

1 nos Delivery: 30 days
#4

Title 4

Walk Around Surface as per tech specification document

1 nos Delivery: 30 days
#5

Title 5

Drainage as per tech specification documents

1 nos Delivery: 30 days
#6

Title 6

Stairs and Railing as per tech specification document

1 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for Mod Sectt Establishment SITC tender in West Kameng?

Bidders must confirm eligibility, provide audited turnover statements for the last 3 financial years, and furnish OEM/Authorized Seller details for imported items. Include EMD if applicable and ensure the bid price covers SITC scope. Follow option clause rules for quantity variations and provide Indian after-sales service certification if OEM is foreign.

What documents are required for Defence SITC tender in Arunachal Pradesh?

Submit GST registration, PAN, audited Balance Sheets or CA certificate for turnover, experience certificates, OEM authorization, and technical bid documents. Include EMD proof if mandated, and certificates proving compliance with after-sales service obligations for imported items.

What are the delivery terms for the 25% quantity option in this tender?

Delivery can be increased up to 25% at contract start and during currency. The additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions align with original delivery period limits.

What are the OEM turnover requirements for this Mod Sectt tender?

OEM must meet the minimum average annual turnover criteria over the last 3 years as per the bid document. In a bunch bid, the OEM of the highest-valued primary product must satisfy the turnover threshold with audited statements or CA/Cost Accountant certification.

What is the scope of supply for this Defence SITC tender?

The scope includes Supply, Installation, Testing and Commissioning of Goods. The bid price must encompass all components required for SITC, with no separate post-award charges; 6 items are listed in the BOQ though item-specific quantities are not disclosed.

What certifications are needed for imported products tender in India?

For imported items, the OEM or Authorized Seller must have a registered Indian office to provide after-sales service; submit a certificate confirming this arrangement along with the bid. This ensures service support within India after delivery.

When will the delivery period start for orders placed under this tender?

Delivery begins from the last date of the original delivery order. If quantities expand, the extension is computed per the option clause, with a minimum extension of 30 days unless the original period exceeds this minimum.