SITC of Compressor for Split Wall Mount AC 2TR,SITC of Compressor for Split Wall Mount AC 2TR,SITC
National Institute Of Technology (nit)
SRINAGAR, JAMMU & KASHMIR
Bid Publish Date
03-Nov-2025, 5:31 pm
Bid End Date
24-Nov-2025, 6:00 pm
EMD
₹1,05,000
Value
₹52,50,992
Location
Progress
Quantity
819
Category
SITC of 2 Ton Split AC
Bid Type
Two Packet Bid
Banaras Locomotive Works of the Indian Railways invites bids for the SITC of multiple air conditioning units and related installation services at VARANASI, UTTAR PRADESH. Estimated contract value is ₹5,250,992 with an EMD of ₹105,000. Scope includes SITC of 2 Ton Split AC, SITC of 2 Ton Window AC, SITC of 1.5 Ton Split AC, plus mounting, refrigerant piping (minimum 3 meters), electrical wiring up to 3 meters, leak testing, wall-mount stands for outdoor units, and uninstallation of existing units. The order quantity may vary ±25% during execution, at contracted rates. Delivery timelines align to extension provisions defined in the option clause. The contract requires a supplier able to support installation, testing, and commissioning.
Option Clause: +/− 25% quantity variation at contract, with adjusted delivery time
1-year govt supply experience: bidder or OEM must show contracts with govt/PSU
OEM authorization required for distributors; full contact details must be provided
Functional in-state service center required; establish within 30 days if absent
Dedicated toll-free service number mandatory; service readiness demonstrated
EMD ₹105,000; payment terms to be defined in contract; acceptance dependent on service center readiness and installation completion
Delivery period governed by option clause; additional time = (additional quantity ÷ original quantity) × original delivery period, minimum 30 days
Penalty clauses not explicitly stated; contract allows delivery extensions with staged payment adjustments
1 year minimum govt/PSU supply experience for similar AC category products
OEM authorization or distributor authorization with complete contact details
Functional service centre in the state of each consignee or plan to establish within 30 days
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC of 2 Ton Split AC , SITC of 2 Ton Window AC , SITC of 1.5 Ton Split AC , Mounting Fitting of indoor and outdoor units at the respective locations , Laying of refrigerant , Checking Charging refrigerant gas in the unit , Suitable electric wiring between indoor units and switch up to 3 meters in length , Testing for satisfactory working without any abnormal noise as well as leakage test of the entire system , Suitable wall mount stand for outdoor unit , Refrigerant copper pipe set 3 meters minimum , Uninstallation of existing AC
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
National Institute Of Technology (nit)
SRINAGAR, JAMMU & KASHMIR
State Bank Of India (sbi)
KOLKATA, WEST BENGAL
S N Bose National Centre For Basic Sciences (snbncbs)
KOLKATA, WEST BENGAL
Central University Of Jammu
Samba, JAMMU & KASHMIR
State Bank Of India (sbi)
KOLKATA, WEST BENGAL
Tender Results
Loading results...
SITC of 2 Ton Split AC
2 Ton 5 star Split AC
SITC of 2 Ton Window AC
2 Ton 5 star Window AC
SITC of 1.5 Ton Split AC
1.5 Ton 5 star Split AC
Mounting Fitting of indoor and outdoor units at the respective locations
Mounting/Fitting of indoor and outdoor units at the respective locations
Laying of refrigerant
Laying of refrigerant piping and connecting with indoor and outdoor units after drilling hole(s) in the wall (all types of walls) if required
Checking Charging refrigerant gas in the unit
Checking Charging refrigerant gas in the unit
Suitable electric wiring between indoor units and switch up to 3 meters in length
Suitable electric wiring between indoor units and switch up to 3 meters in length
Testing for satisfactory working without any abnormal noise as well as leakage test of the entire system
Testing for satisfactory working without any abnormal noise as well as leakage test of the entire system
Suitable wall mount stand for outdoor unit
Suitable wall mount stand for outdoor unit
Refrigerant copper pipe set 3 meters minimum
Refrigerant copper pipe set 3 meters minimum
Uninstallation of existing AC
Uninstallation of existing AC
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SITC of 2 Ton Split AC | 2 Ton 5 star Split AC | 59 | nos | aeecolonydlw | 30 | |
| 2 | SITC of 2 Ton Window AC | 2 Ton 5 star Window AC | 28 | nos | aeecolonydlw | 30 | |
| 3 | SITC of 1.5 Ton Split AC | 1.5 Ton 5 star Split AC | 4 | nos | aeecolonydlw | 30 | |
| 4 | Mounting Fitting of indoor and outdoor units at the respective locations | Mounting/Fitting of indoor and outdoor units at the respective locations | 91 | nos | aeecolonydlw | 30 | |
| 5 | Laying of refrigerant | Laying of refrigerant piping and connecting with indoor and outdoor units after drilling hole(s) in the wall (all types of walls) if required | 91 | nos | aeecolonydlw | 30 | |
| 6 | Checking Charging refrigerant gas in the unit | Checking Charging refrigerant gas in the unit | 91 | nos | aeecolonydlw | 30 | |
| 7 | Suitable electric wiring between indoor units and switch up to 3 meters in length | Suitable electric wiring between indoor units and switch up to 3 meters in length | 91 | nos | aeecolonydlw | 30 | |
| 8 | Testing for satisfactory working without any abnormal noise as well as leakage test of the entire system | Testing for satisfactory working without any abnormal noise as well as leakage test of the entire system | 91 | nos | aeecolonydlw | 30 | |
| 9 | Suitable wall mount stand for outdoor unit | Suitable wall mount stand for outdoor unit | 91 | nos | aeecolonydlw | 30 | |
| 10 | Refrigerant copper pipe set 3 meters minimum | Refrigerant copper pipe set 3 meters minimum | 91 | nos | aeecolonydlw | 30 | |
| 11 | Uninstallation of existing AC | Uninstallation of existing AC | 91 | nos | aeecolonydlw | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing prior supply to govt/PSU bodies (minimum 1 year per tender clause)
Financial statements or turnover proof demonstrating capacity to handle ₹5.25M scope
EMD submission receipt for ₹105,000
Technical bid documents or manufacturer authorization from OEM
OEM authorizations with full contact details (name, designation, address, email, phone)
Evidence of functional Service Centre in the state or a plan to establish within 30 days of award
Bidder’s dedicated toll-free service contact details
Any applicable warranties, AMC terms, and installation credentials
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹105,000, and OEM authorization. Ensure 1 year govt/PSU experience and provide OEM authorization. Include installation, testing, and commissioning scope and indicate service centre readiness in-state to qualify.
Submit GST certificate, PAN, vendor experience certificates showing govt/PSU supply, financial statements, EMD ₹105,000, OEM authorization, and evidence of a functional service centre in the state or a plan to establish within 30 days of award.
Scope includes SITC of 2T split AC, 2T window AC, 1.5T split AC, mounting indoor/outdoor units, refrigerant piping minimum 3 meters, electrical wiring up to 3 meters, leak testing, and satisfactory operational testing with wall-mount outdoor stands.
EMD is ₹105,000. Payment terms are defined within the contract; typically release on milestones after installation and commissioning, contingent on submission of documentary evidence including service center readiness.
Yes. The purchaser can increase or decrease quantities up to 25% at contracted rates during contract execution. Delivery time adjusts using the formula: (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Bidders must provide OEM authorization, including name, designation, address, email, and phone number. If bidding as distributor, the OEM authorization certificate is mandatory to demonstrate product provenance and service support.
Bidder/OEM must have a functional service centre in the state of each consignee location; if absent, establish within 30 days of award. A dedicated toll-free service number is required for after-sales support.
Estimated value is ₹5,250,992. The scope includes supply, installation, testing, and commissioning of AC units, including mounting, piping (minimum 3 meters), wiring (up to 3 meters), leak testing, unit testing, and disposal/uninstallation of existing systems where applicable.
Nhpc Limited
📍 KATHUA, JAMMU & KASHMIR
Institute For Plasma Research
State Bank Of India (sbi)
📍 LUCKNOW, UTTAR PRADESH
State Bank Of India (sbi)
📍 LUCKNOW, UTTAR PRADESH
Indian Army
📍 CHHATARPUR, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS