Progress
Quantity
18
Category
Procurement of Furniture for Logiging team ONGC Jorhat Asset
Bid Type
Two Packet Bid
A tender has been published for Oil And Natural Gas Corporation Limited Personal Locker Unit, steel table with one side drawer, Cupboard half glass, Procurement of Furniture for Logiging team ONGC Jorhat Asset in JORHAT, ASSAM. Quantity: 18 by. Submission Deadline: 08-01-2025 16: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Personal Locker Unit , steel table with one side drawer , Cupboard half glass , Procurement of Furniture for Logiging team ONGC Jorhat Asset
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
15-Jan-2025, 4:00 pm
Opening Date
15-Jan-2025, 4:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | NILKAMAL LIMITED Under PMA | Make : Nilkamal Model : Nilkamal 6 DOOR PERSONAL LOCKER Title : Personal Locker Unit | 15-01-2025 12:36:51 | |
| 2 | SMART HOME Under PMA | Make : GODREJ INTERIO Model : GODREJ 6DOOR PERSONAL LOCKER UNIT Title : Personal Locker Unit | 11-01-2025 22:32:55 | |
| 3 | SWAGAT Under PMA | Make : GODREJ INTERIO Model : GODREJ 6DOOR PERSONAL LOCKER UNIT Title : Personal Locker Unit | 11-01-2025 18:43:23 | |
| 4 | SWAGAT PLAZA Under PMA | Make : GODREJ INTERIO Model : GODREJ 6DOOR PERSONAL LOCKER UNIT Title : Personal Locker Unit | 11-01-2025 18:29:15 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SMART HOME Under PMA | Item Categories : Personal Locker Unit,steel table with one side drawer,Cupboard half glass,Procurement of Furniture | |
| L2 | SWAGAT Under PMA | Item Categories : Personal Locker Unit,steel table with one side drawer,Cupboard half glass,Procurement of Furniture | |
| L3 | SWAGAT PLAZA Under PMA | Item Categories : Personal Locker Unit,steel table with one side drawer,Cupboard half glass,Procurement of Furniture |
Key insights about ASSAM tender market
Details are provided in the tender document.
Bidders must be registered on the GeM platform and must meet all document submission requirements outlined in the tender documents. Additional exemptions may be available for MSEs.
Bidders should refer to the linked specifications for each item, including the Personal Locker Unit, Steel table, and Cupboard. Compliance with quality standards is mandatory.
Yes, bidders need to submit an EMD as part of their bid submission, details of which will be specified in the tender documents.
Payment details, including milestones and conditions, will be outlined in the contract subsequent to the evaluation and acceptance of bids.
Bids must be submitted electronically via the GeM platform, ensuring all required documents are attached as requested in the ATC.
Yes, MSEs may claim exemptions regarding experience and turnover, subject to validation and submission of necessary documentation.
Bids will be evaluated based on total value and compliance with technical specifications, ensuring all bids meet quality and pricing requirements.
Timelines for bid evaluation and awarding will be communicated following the closing of the bid period. Typically, this occurs shortly after bid opening.
Yes, a pre-dispatch inspection will be conducted by the buyer's own empanelled inspection agency to ensure compliance with quality standards.
Bidders may request technical clarifications during the evaluation period as specified, and such requests should be documented formally through the GeM platform.
All tender-related documents are available for download via the links provided in the tender details on the GeM platform.
Failure to comply with specified requirements may lead to disqualification of the bid or penalties as outlined in the contract terms.
Bidders must explicitly provide details on how their offerings comply with the Make in India policies during the bid evaluation process.
Foreign bidders can participate but must be registered with the competent authority and demonstrate compliance with regulatory requirements.
Bidders may raise objections or representations regarding the terms of the tender through the provided channels on the GeM platform within the stipulated time.
Details are provided in the tender document.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS