HV VACUUM CIRCUIT BREAKER (VCB) UNIT WITH TROLLEY & CONTACT ARMS, TO BE MOUNTED IN (8BK80) - 33 KV
Yantra India Limited
Bid Publish Date
13-Jan-2026, 2:55 pm
Bid End Date
29-Jan-2026, 3:00 pm
Value
₹1,85,000
Location
Progress
Quantity
42
Category
Dismantling of 33 KV damaged VCB
Bid Type
Two Packet Bid
The Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for comprehensive 33 KV substation works at ETD Sultanpur, including dismantling of damaged VCBs, modifying 33 KV VCB foundations, erection of new 33 KV VCBs, jumpering between CB to CT and CB to BI with Twin ACSR Panther conductor, and re-earthing of 36 KV circuit breakers, along with wiring termination. Estimated value is ₹185,000.00 with 6 BOQ items. Work is to be executed on an emergency basis across multiple 220/132 kV substations, under strict JE supervision, with a 365-day completion window from order date. An option clause allows ±25% quantity variation during/after contract, at contracted rates. Delivery is F.O.R. to various substations in Sultanpur district.
Product/Service: Dismantling of damaged 33 KV VCB, 33 KV VCB foundation modification, erection of new 33 KV VCB, jumpering between CB-CT and CB-BI using Twin ACSR Panther conductor, re-earthing of 36 KV circuit breaker, termination of wiring.
Location/Scope: Emergency works at 220/132 kV substations under ETD Sultanpur; delivery F.O.R to multiple substations.
Delivery/Timeline: 365 days from date of order; possible quantity variation up to 25% during contract at same rate.
Payment/Guarantee: 90% payment on delivery/inspection; 10% as performance guarantee via FDR/BG or full payment with 100% PBG; penalties 0.5% per week up to 10%.
Administrative: Non-judicial stamp paper ₹100 for agreement; Engineer in charge: Executive Engineer, ET Division, Sultanpur.
Option clause allowing ±25% quantity change at contracted rates
Emergency, site-based execution under JE supervision with 365-day completion
90% payment on delivery, 10% performance guarantee; alternative 100% payment with PBG
90% payment after delivery and site inspection; remaining 10% as performance guarantee via FDR/BG or full payment with PBG; BTS portal bill submission required.
Completion within 365 days from order date; emergency basis across multiple substations; penalties 0.5% weekly up to 10% for late delivery.
LD @ 0.5% per week, maximum 10% of late delivery value; deducted from contractor's bill.
Experience in emergency 33 KV/220/132 KV substation works
Ability to execute dismantling, foundation modification, erection, and conductor jumpering tasks
Compliance with 365-day completion and JE supervision requirements
Yantra India Limited
Hindustan Petroleum Corporation Ltd
KOKRAJHAR, ASSAM
Delhi Metro Rail Corporation Limited
EAST DELHI, DELHI
Salem Steel Plant
SALEM, TAMIL NADU
Advanced Weapons And Equipment India Limited
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Dismantling of 33 KV damaged VCB | Dismantling of 33 KV damaged and defective VCB including shifting of dismantled VCB form switch yard to storage place or store room | 7 | jobs | ae@slt2 | 365 |
| 2 | Modification of 33 KV VCB foundation | Modification of 33 KV VCB foundation as per site requirement as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing and both side jumper | 7 | jobs | ae@slt2 | 365 |
| 3 | Erection of new 33 KV VCB | Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping closing spring charging indication supervision circuit with proper ferruling and checking out of breaker operation from local remote including earthing and connection of both side jumpers and works related to complete the erection work All required Tand P skilled labours crane hydra etc shall be arranged by the contractor at his own cost | 7 | jobs | ae@slt2 | 365 |
| 4 | Jumpering between CB to CT and CB to BI with Twin ACSR panther conductor | Making of new jumpering between CB to CT CB to BI with Twin ACSR panther conductor with the help of PG CB clamp including cost of men and Tand P as per direction of supervising engineer to complete the job satisfactorily | 7 | jobs | ae@slt2 | 365 |
| 5 | Re Earthing of 36 KV Circuit breaker | Re-Earthing of 36 KV Circuit breaker by cutting bending and welding of 50x6 mm MS Flat to existing riser work includes checking of existing nser connectivity to earthmate painting of existing riser earth flat earth flat with one cost of red oxide and two coat of black bus green enamel paint of standard make after cleaning of strip angle for rust dust fire including cost of men material and T and P as per direction of supervising engineer to complete the job satisfactorily | 7 | jobs | ae@slt2 | 365 |
| 6 | Termintion of wiring | Opening of termintion wiring from damaged breaker after writing the ferrule and tallying the ferrule with electrical drawing The work includes complete identification of wiring then opening of wiring from panel and breaker end Then after reelection of new breaker the old wiring ferrule will be replaced the as per new drawing terminated for proper electrical working | 7 | jobs | ae@slt2 | 365 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar substation works
Financial statements (Last 3 years)
EMD/Security deposit documents (as applicable per tender terms)
Technical bid documents
OEM authorizations (if required)
Non-judicial stamp paper ₹100 for Agreement
Bill of Lading/Delivery proofs and BTS portal invoice uploads
Key insights about UTTAR PRADESH tender market
Bidders must participate via UPPCL and comply with the emergency work scope, including dismantling, foundation modification, and VCB erection. Ensure delivery within 365 days, submit 90% payment-ready material on site, and arrange a 10% PBG or FDR. Use BTS portal for invoicing and attach required documents.
Submit GST registration, PAN, company financial statements, experience certificates for similar substation works, technical bid documents, OEM authorizations, and EMD documents (if applicable). Also provide non-judicial stamp paper ₹100 for agreement and JE supervision compliance proofs.
Scope includes dismantling damaged 33 KV VCBs, modifying VCB foundations, erecting new 33 KV VCBs, jumper wiring CB-CT and CB-BI with Twin ACSR Panther conductor, re-earthing of 36 KV breakers, and termination of wiring, all under emergency execution terms.
UPPCL pays 90% on successful delivery and inspection; 10% as performance guarantee via FDR/BG or full payment with 100% PBG. Invoices must be uploaded on the BTS portal for processing by UPPTCL HQ Lucknow.
Delivery must be completed in 365 days from order date. Delays incur a penalty of 0.5% per week, capped at 10% of the late delivery value, deducted from the contractor’s bill.
Yes. The purchaser reserves the right to increase or decrease quantity up to 25% at the contracted rate during the contract term, with pay/load adjustments calculated per specified formula.
Executive Engineer, Electricity Transmission Division, Sultanpur is the Engineer of the Contract. A non-judicial stamp paper ₹100 is required for execution of the agreement, borne by the contractor; all terms are governed by urgent-site supervision.
The scope centers on VCB dismantling/erection and associated wiring, with delivery on a FOB-like basis to Sultanpur substations. EMD amount is not specified in the available data; bidders should confirm via ATC/ATC clauses attached to the tender.