TenderDekho Logo
Closed GEM

Indo-Tibetan Border Police Gym Equipment Tender Panchkula Haryana 2026 - Olympic Benches, Smith Machine, Urethane Dumbbells & Olympic Plates

Bid Publish Date

22-Jul-2026, 8:19 pm

Bid End Date

12-Aug-2026, 9:00 pm

Value

₹3,52,200

Progress

RA
Issue22-Jul-2026, 8:19 pm
Reverse Auction27-Sep-2026, 1:00 pm
AwardPending

Tender Overview

The Indo-Tibetan Border Police (ITBP) invites bids in Panchkula, Haryana for a complete gym equipment package including Olympic flat bench with stand, Olympic incline bench with stand, a Smith machine, urethane dumbbells in weights from 5kg to 20kg per pair, urethane Olympic plates from 5kg to 25kg per pair, 7ft Olympic barbell rod for bench press, 4ft curl barbell rod, 5ft straight barbell rod, and a multipurpose bench. Estimated value is ₹352,200. The scope targets government procurement with OEM/supplier capabilities to deliver a full set aligned to ITBP standards. Key differentiators include integration of multiple weight categories and bar types under a single contract, plus a 25% quantity option during and after award. Delivery timeline will adjust per drawings approval and option clause. The bidder must meet govt procurement criteria and provide GST-compliant invoicing. Location-specific tender in Panchkula supports Haryana-based gear supply.

Technical Specifications & Requirements

  • Product categories include: Olympic benches, Smith machine, urethane dumbbells (5–20 kg pairs), urethane Olympic plates (5–25 kg pairs), Olympic bars (7ft bench press, 4ft curl, 5ft straight), and a multipurpose bench.
  • No explicit numeric specs provided beyond weights; emphasis on complete gym kit compatibility with standard Olympic weights and formats.
  • Requirements include Detailed Design Drawings approval within 5 days post award; after approval, supply must follow drawings with modifications if required by ITBP.
  • Delivery terms allow up to 25% quantity variation during/within contract at contracted rates; minimum 30 days additional time for extended delivery.
  • Experience criteria require the bidder or OEM to have 3 years’ prior govt/PSU supply of similar category products; provide contracts showing annual quantities.

Terms, Conditions & Eligibility

  • EMD: not specified in data; check tender portal for exact amount.
  • GST invoice must be uploaded on GeM portal with GST payment screenshot.
  • Detailed Design Drawings approval within 5 days of contract award; non-approval delays may adjust delivery without LD.
  • Consortium allowed; each member equally responsible; submit undertaking with bid.
  • Experience criterion: minimum 3 years of regular manufacturing/supply to govt/PSU for similar products; provide copies of contracts showing yearly quantities.
  • Delivery period and quantity adjustments governed by option clause with conduct of delivery as per last date of original/extended orders.

Key Specifications

  • Product categories: Olympic benches with stands, Smith machine, urethane dumbbells (5kg–20kg per pair), urethane Olympic plates (5kg–25kg per pair), Olympic bars (7ft bench press, 4ft curl, 5ft straight), multipurpose bench

  • Weights/quantities: 5kg–20kg dumbbells, 5kg–25kg plates, 7ft bar, 4ft bar, 5ft bar

  • Design/drawings: Detailed Design Drawings approval within 5 days of award

  • Delivery variation: up to 25% quantity at contracted rates; additional time formulaed with minimum 30 days

  • Experience: 3 years govt/PSU supply of similar products; provide contracts corroborating yearly quantities

Terms & Conditions

  • Option clause allows 25% quantity variation during/after award

  • GST invoicing via GeM portal with payment screenshot required

  • Detailed Design Drawings must be approved within 5 days of award

Important Clauses

Payment Terms

GST invoice submission on GeM with GST payment screenshot; payment terms subject to contract specifics

Delivery Schedule

Delivery period adjusts with approved drawings; additional time calculation follows (increased quantity ÷ original quantity) × original delivery period, min 30 days

Penalties/Liquidated Damages

LD provisions not specified; delays revert to revised delivery schedule per drawings approval terms

Bidder Eligibility

  • 3 years govt/PSU supply experience for similar gym equipment

  • Financial stability demonstrated via annual turnover or statements

  • No liquidation or bankruptcy proceedings; undertaking to be uploaded

Advertisement

Authority & Contact

Department

Central Armed Police Forces

Office Name

50 Bn

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

27-Sep-2026, 1:00 pm

End

28-Sep-2026, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

21

Category

OLYMPIC FLAT BENCH WITH STAND

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

OLYMPIC FLAT BENCH WITH STAND , OLYMPIC INCLINE BENCH WITH STAND , SMITH MACHINE , URETHANE DUMBBELLS 5KG IN PAIR , URETHANE DUMBBELLS 7.5KG IN PAIR , URETHANE DUMBBELLS 10KG IN PAIR , URETHANE DUMBBELLS 12.5KG IN PAIR , URETHANE DUMBBELLS 15KG IN PAIR , URETHANE DUMBBELLS 17.5KG IN PAIR , URETHANE DUMBBELLS 20KG IN PAIR , URETHANE OLYMPIC PLATES 5KG IN PAIR , URETHANE OLYMPIC PLATES 7.5KG IN PAIR , URETHANE OLYMPIC PLATES 10KG IN PAIR , URETHANE OLYMPIC PLATES 15KG IN PAIR , URETHANE OLYMPIC PLATES 20KG IN PAIR , URETHANE OLYMPIC PLATES 25KG IN PAIR , OLYMPIC BARBELL ROD FOR BENCH PRESS 7FEET , OLYMPIC CURL BARBELL ROD 4FEET , OLYMPIC STRAIGHT BARBELL ROD 5FEET , MULTIPURPOSE BENCH

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

12

Pre-Bid & Qualification

Pre-Bid Date

28-07-2026 11:00:00

Pre-Bid Venue

QM BRANCH 50TH BN ITBP SEC-26 PANCHKULA (HR) 134116

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Panchkula

Delivery Pincodes

134116

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mandeep Dhanda134116,50TH BN ITB POLICE SEC-26 PANCHKULA HARYANAPanchkulaHaryana134116115-

Authority Records

MINISTRY OF HOME AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9646684.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

OLYMPIC FLAT BENCH WITH STAND

OLYMPIC FLAT BENCH WITH STAND

1 pieces Delivery: 15 days
#2

OLYMPIC INCLINE BENCH WITH STAND

OLYMPIC INCLINE BENCH WITH STAND

1 pieces Delivery: 15 days
#3

SMITH MACHINE

SMITH MACHINE

1 pieces Delivery: 15 days
#4

URETHANE DUMBBELLS 5KG IN PAIR

URETHANE DUMBBELLS 5KG IN PAIR

1 pair Delivery: 15 days
#5

URETHANE DUMBBELLS 7.5KG IN PAIR

URETHANE DUMBBELLS 7.5KG IN PAIR

1 pair Delivery: 15 days
#6

URETHANE DUMBBELLS 10KG IN PAIR

URETHANE DUMBBELLS 10KG IN PAIR

1 pair Delivery: 15 days
#7

URETHANE DUMBBELLS 12.5KG IN PAIR

URETHANE DUMBBELLS 12.5KG IN PAIR

1 pair Delivery: 15 days
#8

URETHANE DUMBBELLS 15KG IN PAIR

URETHANE DUMBBELLS 15KG IN PAIR

1 pair Delivery: 15 days
#9

URETHANE DUMBBELLS 17.5KG IN PAIR

URETHANE DUMBBELLS 17.5KG IN PAIR

1 pair Delivery: 15 days
#10

URETHANE DUMBBELLS 20KG IN PAIR

URETHANE DUMBBELLS 20KG IN PAIR

1 pair Delivery: 15 days
#11

URETHANE OLYMPIC PLATES 5KG IN PAIR

URETHANE OLYMPIC PLATES 5KG IN PAIR

1 pair Delivery: 15 days
#12

URETHANE OLYMPIC PLATES 7.5KG IN PAIR

URETHANE OLYMPIC PLATES 7.5KG IN PAIR

1 pair Delivery: 15 days
#13

URETHANE OLYMPIC PLATES 10KG IN PAIR

URETHANE OLYMPIC PLATES 10KG IN PAIR

1 pair Delivery: 15 days
#14

URETHANE OLYMPIC PLATES 15KG IN PAIR

URETHANE OLYMPIC PLATES 15KG IN PAIR

1 pair Delivery: 15 days
#15

URETHANE OLYMPIC PLATES 20KG IN PAIR

URETHANE OLYMPIC PLATES 20KG IN PAIR

1 pair Delivery: 15 days
#16

URETHANE OLYMPIC PLATES 25KG IN PAIR

URETHANE OLYMPIC PLATES 25KG IN PAIR

1 pair Delivery: 15 days
#17

OLYMPIC BARBELL ROD FOR BENCH PRESS 7FEET

OLYMPIC BARBELL ROD FOR BENCH PRESS 7FEET

2 pieces Delivery: 15 days
#18

OLYMPIC CURL BARBELL ROD 4FEET

OLYMPIC CURL BARBELL ROD 4FEET

1 pieces Delivery: 15 days
#19

OLYMPIC STRAIGHT BARBELL ROD 5FEET

OLYMPIC STRAIGHT BARBELL ROD 5FEET

1 pieces Delivery: 15 days
#20

MULTIPURPOSE BENCH

MULTIPURPOSE BENCH

1 pieces Delivery: 15 days

Categories 10

Required Documents

1

GST certificate and PAN card

2

Experience certificates showing 3 years of govt/PSU supply of similar gym equipment

3

Financial statements demonstrating bidder stability

4

OEM authorizations or reseller agreements

5

Technical compliance documents and Detailed Design Drawings (within 5 days of award)

6

GST invoice uploads and GST payment screenshots

7

Bidder undertaking of non-liquidation and non-bankruptcy

8

Consortium agreement (if applicable) with leader designation

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for the ITBP gym equipment tender in Panchkula 2026?

Bidders should first confirm eligibility for govt/PSU supply of gym equipment, ensure 3 years of prior experience, submit OEM authorizations if applicable, and provide GST registration. Prepare Detailed Design Drawings within 5 days of award, ensure GST-compliant invoicing on GeM, and monitor for a 25% quantity variation option during contract.

What are the essential documents for ITBP gym procurement in Haryana?

Required documents include GST certificate, PAN, 3-year govt/PSU experience contracts showing yearly quantities, financial statements, OEM authorization, technical compliance certificates, Detailed Design Drawings within 5 days of award, and GeM GST invoice with GST payment screenshot.

What standards or specifications apply to ITBP Olympic gym equipment?

The tender emphasizes Olympic bench sets, urethane dumbbells, and Olympic plates; while explicit standards aren’t listed, ensure compatibility with Olympic weights and PPE compliance, and obtain OEM authorizations for authentic components including 7ft bars and multipurpose benches.

When is the delivery window for ITBP gym equipment in Panchkula?

Delivery timing is linked to approval of Detailed Design Drawings within 5 days; after approval, delivery proceeds per approved drawings with possible extended time calculated by the option clause, with a minimum extension of 30 days.

What are the EMD or security requirements for this bid?

Explicit EMD amount isn’t provided in the data; bidders should verify on GeM the exact EMD or security deposit requirements and prepare funds accordingly prior to bid submission to avoid rejection.

What documents demonstrate govt/PSU experience for this gym tender?

Submit contracts with govt/PSU entities showing supply of similar gym equipment over the last three years, including year-wise quantities; provide contactable reference contracts and performance certificates confirming timely delivery.

What are the GST-related submission requirements for this tender?

Upload a scanned GST invoice on GeM and attach a GST portal payment confirmation screenshot; ensure GSTIN validity and matching supplier details across GeM and official tender documents.

How does the 25% quantity option affect procurement in this ITBP tender?

The purchaser may increase or decrease the ordered quantity by up to 25% at contracted rates during placement and during the contract currency; delivery time adjusts using the specified formula with a minimum 30 days, affecting total contract value.

Advertisement