Tender Overview

Cement Corporation Of India Limited invites bids for a water pipeline equipment package including float valve 1/2 inch, butterfly valves for 4 inch, 1/2 inch, 1-1/2 inch, 1 inch, 3/4 inch, 2 inch, CPVC tape, and pressure relief valve for water pipeline 3 inch at SIRMAUR, HIMACHAL PRADESH 173001. The procurement involves multiple valve types across a 9-item BOQ, with an estimated value not disclosed. Delivery is required within 4-6 weeks of order placement, and the award will be based on total landed cost. Bidders must meet minimum turnover criteria and provide OEM/experience evidence as per terms.

Technical Specifications & Requirements

  • Product categories: Float valve, Butterfly valve (various sizes), CPVC tape, Pressure relief valve
  • Delivery location: Sirmaur, Himachal Pradesh
  • Delivery schedule: 4-6 weeks from order date
  • Evaluation criterion: L1 based on total landed cost to the corporation
  • Turnover criteria: Minimum average annual turnover over the last 3 years (as per bid document); OEM turnover criteria applies; consolidate with audited balance sheets or CA certificates
  • Past experience: Acceptable proofs include contract copies with invoices, client execution certificates, or third-party release notes
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate certified by bank
  • Scope notes: OEMs must meet turnover and experience requirements; primary product category alignment for bunch bids
  • Compliance expectations: Suppliers must demonstrate capability to supply multiple valve types and CPVC components under one contract, with adherence to quality controls and delivery timelines

Terms, Conditions & Eligibility

  • EMD/Cost terms: EMD not specified in data; L1 determined by landed cost
  • Delivery: 4-6 weeks from order placement
  • Payment/financials: Turnover criteria required; bid documentary evidence for turnover: audited balance sheets or CA/Cost Accountant certificate
  • Documents to submit: PAN card, GSTIN, cancelled cheque, EFT mandate; OEM/experience proofs as per tender terms
  • Experience proof: Contracts, invoices, execution certificates, or third-party notes acceptable
  • OEM requirement: OEM turnover criteria to be satisfied; primary category bidder for multi-item bids
  • Inclusion: All 9 items must be considered; BOQ items labeled N/A indicate non-disclosed quantities but potential scope for supply

Key Specifications

  • Float valve 1/2 inch

  • Butterfly valve types: 4 inch, 1/2 inch, 1-1/2 inch, 1 inch, 3/4 inch, 2 inch

  • CPVC Tape

  • Pressure relief valve for water pipeline 3 inch

  • Delivery: 4-6 weeks from order date

  • Evaluation: Total landed cost (L1) basis

Terms & Conditions

  • Delivery within 4-6 weeks from order

  • L1 landed cost to determine winner

  • Minimum turnover and OEM turnover criteria

Important Clauses

Payment Terms

L1 evaluation based on total landed cost; no explicit separate payment schedule provided in available data

Delivery Schedule

Supply must be completed within 4-6 weeks from the date of placement of order

Penalties/Liquidated Damages

Not specified in available information

Bidder Eligibility

  • Minimum average annual turnover over last 3 financial years as specified in bid document

  • OEM turnover criteria met for offered product category

  • Evidence of past experience with similar valves or pipeline components

Tender Data

Bid Details

Quantity

57

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Float Valve 1_2 inch , Butterfly Valve for water pipe line 4 inch , Butterfly Valve for water pipe line 1_2 inch , Butterfly Valve for water pipe line 1_5 inch , Butterfly Valve for water pipe line 1 inch , C.P.V.C Tape , Pressure relief valve for water pipeline 3 inch , Butterfly Valve for water pipe line 3_4 inch , Butterfly Valve for water pipe line 2 inch

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Sirmaur

Delivery Pincodes

173029

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ajay Kumar Singh173029,CCI, Rajban Cement Factory, Distt. Sirmour, H.P.SirmaurHimachal Pradesh1730292045-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTCEMENT CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9851726.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

Float Valve 1_2 inch

As per sepfication

20 number Delivery: 45 days
#2

Butterfly Valve for water pipe line 4 inch

As per sepfication

1 number Delivery: 45 days
#3

Butterfly Valve for water pipe line 1_2 inch

As per sepfication

2 number Delivery: 45 days
#4

Butterfly Valve for water pipe line 1_5 inch

As per sepfication

4 number Delivery: 45 days
#5

Butterfly Valve for water pipe line 1 inch

As per sepfication

4 number Delivery: 45 days
#6

C.P.V.C Tape

As per sepfication

20 number Delivery: 45 days
#7

Pressure relief valve for water pipeline 3 inch

As per sepfication

2 number Delivery: 45 days
#8

Butterfly Valve for water pipe line 3_4 inch

As per sepfication

1 number Delivery: 45 days
#9

Butterfly Valve for water pipe line 2 inch

As per sepfication

3 number Delivery: 45 days

Categories 33

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years

6

Past Experience proof: Contract copies with invoices or client execution certificates

7

OEM authorization/certifications (if applicable)

Frequently Asked Questions

Key insights about HIMACHAL PRADESH tender market

How to participate in CCI valve tender in Sirmaur Himachal Pradesh 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate. Provide turnover proof for last 3 years and OEM turnover details if applicable. Include past experience proofs (contracts, invoices or client certificates) and ensure delivery within 4-6 weeks from order, with L1 landed cost evaluation.

What documents are required for CCI water valve procurement in Himachal

Required documents include PAN Card, GSTIN, cancelled cheque, EFT mandate certified by bank, turnover certificates (audited or CA certificate), and past experience proofs such as contract copies or client execution certificates. OEM authorizations may be required for primary product categories.

What are the technical valve categories in the CCI tender 2026

The tender includes float valve 1/2 inch, butterfly valves for sizes 4 inch, 1/2 inch, 1-1/2 inch, 1 inch, 3/4 inch, 2 inch, and ancillary items such as CPVC tape and pressure relief valve for 3 inch pipeline.

When is the delivery deadline for the CCI hydration valve package

Delivery must occur within 4-6 weeks from the date of order placement. Bidders should plan manufacturing and logistics to meet this window and include risk mitigations for supply chain delays.

What is the basis for selecting bidders in this CCI tender

Selection will be on the basis of total landed cost (L1) to the corporation. This includes item price, freight, insurance, and all other duties up to delivery at site in Sirmaur.

What experience proof qualifies for past project experience in this bid

Acceptable proofs include contract copies with invoices and self-certification, client execution certificates, or third-party release notes. Ensure they demonstrate supply or service execution related to valves or pipeline components.

Are OEM turnover criteria mandatory for all bidders in this tender

Yes. The OEM of the offered product must meet the minimum average annual turnover over the last 3 years as specified in the bid document; for bunch bids the primary category OEM with highest bid value must satisfy it.

What are the first steps to bid on the CCI valve tender

First prepare your bid dossier with PAN, GSTIN, cancelled cheque, EFT mandate, and turnover proofs. Then align your product portfolio to include all nine items (valves and CPVC tape). Ensure delivery schedule and L1 criteria are met for a competitive bid.