Progress
Quantity
43
Bid Type
Two Packet Bid
A tender has been published for Indian Army Labour charge for replacement, Engine oil 15W40, Gear Box and Differential OIL, Break Oil, Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement, Front and Rear break liner lock kit, M and L for dismantling and servicing of radiator assy and replacement of water pump, Coolant, Labour charge for complete dismantling of Tie rod assy and refixing the same, Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals, Fasterners with acessories, Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection, Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear, Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check, Material and Labour for check all and replacement if necessary of drive belts condition, Labour Charge for wheel alignment and cambering of wheels, M and L for servicing washing in VADODARA, GUJARAT. Quantity: 43 by. Submission Deadline: 03-04-2025 17: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Labour charge for replacement , Engine oil 15W40 , Gear Box and Differential OIL , Break Oil , Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement , Front and Rear break liner lock kit , M and L for dismantling and servicing of radiator assy and replacement of water pump , Coolant , Labour charge for complete dismantling of Tie rod assy and refixing the same , Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals , Fasterners with acessories , Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection , Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear , Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check , Material and Labour for check all and replacement if necessary of drive belts condition , Labour Charge for wheel alignment and cambering of wheels , M and L for servicing washing
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Labour charge for replacement
Labour charge for replacement of oil and filters
Engine oil 15W40
Engine oil 15W40
Gear Box and Differential OIL
Gear Box and Differential OIL
Break Oil
Break Oil
Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement
Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement of under mentioned work to be carried out and refitting the same incleaning servicing of the four wheels
Front and Rear break liner lock kit
Front and Rear break liner lock kit
M and L for dismantling and servicing of radiator assy and replacement of water pump
M and L for dismantling and servicing of radiator assy and replacement of water pump assy and removing over heating of engine
Coolant
Coolant
Labour charge for complete dismantling of Tie rod assy and refixing the same
Labour charge for complete dismantling of Tie rod assy and refixing the same after cleaning
Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals
Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals steering suspensions wheels and tyres brakes trunk body etc and replacment of necessary
Fasterners with acessories
Fasterners with acessories
Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection
Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection proper routing clamping of wiring intactness of grommets and replacement as necessary
Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear
Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear out U bolt suspension arm and steering knuckle support and rear leaf spring arm antiroll bar for damage suspension bump stop suspension links for damage etcand rectify and replacement as necessary
Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check
Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check cyclinder head valve clearance and adjustment to head and replacement if necessary
Material and Labour for check all and replacement if necessary of drive belts condition
Material and Labour for check all and replacement if necessary of drive belts condition and Frontee rotation damage as water pump belt tensioner pulley belt idler pulley fan pulley alternator pulley stg pump etc
Labour Charge for wheel alignment and cambering of wheels
Labour Charge for wheel alignment and cambering of wheels
M and L for servicing washing
M and L for servicing washing and greasing of veh
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Labour charge for replacement | Labour charge for replacement of oil and filters | 1 | job | agetbaroda | 30 | |
| 2 | Engine oil 15W40 | Engine oil 15W40 | 9 | ltrs | agetbaroda | 30 | |
| 3 | Gear Box and Differential OIL | Gear Box and Differential OIL | 8 | ltrs | agetbaroda | 30 | |
| 4 | Break Oil | Break Oil | 1 | ltrs | agetbaroda | 30 | |
| 5 | Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement | Labour charge for dismantling the complete four wheel From the vehicle and repair and replacement of under mentioned work to be carried out and refitting the same incleaning servicing of the four wheels | 1 | job | agetbaroda | 30 | |
| 6 | Front and Rear break liner lock kit | Front and Rear break liner lock kit | 1 | each | agetbaroda | 30 | |
| 7 | M and L for dismantling and servicing of radiator assy and replacement of water pump | M and L for dismantling and servicing of radiator assy and replacement of water pump assy and removing over heating of engine | 1 | job | agetbaroda | 30 | |
| 8 | Coolant | Coolant | 3 | ltrs | agetbaroda | 30 | |
| 9 | Labour charge for complete dismantling of Tie rod assy and refixing the same | Labour charge for complete dismantling of Tie rod assy and refixing the same after cleaning | 1 | job | agetbaroda | 30 | |
| 10 | Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals | Labour charge for checking and tightening all fastners as per given engine pheriperals drive line electricals steering suspensions wheels and tyres brakes trunk body etc and replacment of necessary | 1 | job | agetbaroda | 30 | |
| 11 | Fasterners with acessories | Fasterners with acessories | 10 | each | agetbaroda | 30 | |
| 12 | Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection | Labour charge for checking electrical system ensure usage of genuine fuses with correct ratings condition of fuse and relay holding base earthing connection proper routing clamping of wiring intactness of grommets and replacement as necessary | 1 | job | agetbaroda | 30 | |
| 13 | Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear | Labour charge for checking suspension shock absorber for leakage damage leaf sprins for damage sagging bushes wear out U bolt suspension arm and steering knuckle support and rear leaf spring arm antiroll bar for damage suspension bump stop suspension links for damage etcand rectify and replacement as necessary | 1 | job | agetbaroda | 30 | |
| 14 | Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check | Material and labour for check external clogging of intercooler and radiator and clean with compressed air and water check cyclinder head valve clearance and adjustment to head and replacement if necessary | 1 | job | agetbaroda | 30 | |
| 15 | Material and Labour for check all and replacement if necessary of drive belts condition | Material and Labour for check all and replacement if necessary of drive belts condition and Frontee rotation damage as water pump belt tensioner pulley belt idler pulley fan pulley alternator pulley stg pump etc | 1 | job | agetbaroda | 30 | |
| 16 | Labour Charge for wheel alignment and cambering of wheels | Labour Charge for wheel alignment and cambering of wheels | 1 | job | agetbaroda | 30 | |
| 17 | M and L for servicing washing | M and L for servicing washing and greasing of veh | 1 | job | agetbaroda | 30 |
Experience Criteria *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AMRIT RAJ ENTERPRISES Under PMA | - | 03-04-2025 16:46:05 | |
| 2 | DHRUV AUTO ENTERPRISE Under PMA | - | 03-04-2025 07:50:51 | |
| 3 | GAURAV GARAGE (PROP OF SURESH RAMANLAL SHAH) Under PMA | - | 03-04-2025 13:43:16 | |
| 4 | RAO CONSTRUCTION AND GENERAL SUPPLY Under PMA | - | 03-04-2025 16:27:28 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GAURAV GARAGE (PROP OF SURESH RAMANLAL SHAH)(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Labour charge for replacement,Engine oil 15W40,Gear Box and Differential OIL,Break Oil,Labour charg | |
| L2 | RAO CONSTRUCTION AND GENERAL SUPPLY (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Labour charge for replacement,Engine oil 15W40,Gear Box and Differential OIL,Break Oil,Labour charg | |
| L3 | DHRUV AUTO ENTERPRISE (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Labour charge for replacement,Engine oil 15W40,Gear Box and Differential OIL,Break Oil,Labour charg | |
| L4 | AMRIT RAJ ENTERPRISES Under PMA | Item Categories : Labour charge for replacement,Engine oil 15W40,Gear Box and Differential OIL,Break Oil,Labour charg |
Key insights about GUJARAT tender market
The eligibility requirements include being a registered entity with licenses for vehicle repairs, experience in similar projects, and access to qualified personnel and appropriate facilities for servicing.
Bidders must comply with industry standards for automotive repairs, use genuine replacement parts, and provide a thorough quality assurance plan addressing all vehicle components listed in the scope of work.
Essential documents include completed bid forms, registration evidence, technical capacity proofs, and financial statements. Accepted formats generally include PDFs or other specified file types recommended in the bid submission guidelines.
The Earnest Money Deposit (EMD) is required as a security measure, showing commitment to the tender process. The amount and payment details are provided within the tender documentation, and it varies based on the scope and value of the project.
Yes, this tender includes specific provisions for MSEs and startups, ensuring they have competitive opportunities. These provisions might include relaxed eligibility criteria and financial assistance for bids demonstrating local manufacturing and engagement in the "Make in India" initiative.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS