TenderDekho Logo
Closed GEM

Government Tender Published for Self Starter,Diode plate,Alternator Regulator,Degital Meter,AVR,Alternator,Ignition Switch,Self Sta in KINNAUR, HIMACHAL PRADESH

Bid Publish Date

12-Aug-2026, 1:53 pm

Bid End Date

22-Aug-2026, 2:00 pm

Progress

Issue12-Aug-2026, 1:53 pm
AwardPending

A tender has been published for Armed Forces Tribunal Self Starter, Diode plate, Alternator Regulator, Degital Meter, AVR, Alternator, Ignition Switch, Fan Blower Accy, Fuel Filter, Oil Filter, Digital Meter, Rectifier Plate, Regulator, Engine Oil, Air Filter, Push Rod Seal, Self O Ring Seal, Feed Pump, Stopper Solenoid, Emergency Push Button, Field Coil Self Starter 12 V, Armature, MCB, Air Cleaner, Exhaust Gaskit, Tappet Gasket, Fuel Feed Pump in KINNAUR, HIMACHAL PRADESH. Quantity: 77 by. Submission Deadline: 22-08-2026 14: 00: 00. Check eligibility and apply.

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

77

Category

MCB

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

9

Past Performance

50 %

Warranty Period

15 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Self Starter , Diode plate , Alternator Regulator , Degital Meter , AVR , Alternator , Ignition Switch , Fan Blower Accy , Fuel Filter , Oil Filter , Digital Meter , Rectifier Plate , Regulator , Engine Oil , Air Filter , Push Rod Seal , Self O Ring Seal , Feed Pump , Stopper Solenoid , Emergency Push Button , Field Coil Self Starter 12 V , Armature , MCB , Air Cleaner , Exhaust Gaskit , Tappet Gasket , Fuel Feed Pump

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Kinnaur

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KinnaurKinnaur--290-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9728684.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 44 Items Sign in for GEM prices

#1

Self Starter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#2

Diode plate

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#3

Alternator Regulator

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#4

Degital Meter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#5

AVR

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#6

Alternator

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#7

Ignition Switch

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#8

Self Starter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#9

Fan Blower Accy

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#10

Fuel Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#11

Oil Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#12

Diode plate

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#13

Self Starter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#14

Digital Meter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#15

Rectifier Plate

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#16

Regulator

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#17

AVR

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#18

Engine Oil

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

20 ltr Delivery: 90 days
#19

Air Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#20

Fuel Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#21

Push Rod Seal

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#22

Self O Ring Seal

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 set Delivery: 90 days
#23

Feed Pump

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#24

Digital Meter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#25

Stopper Solenoid

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 90 days
#26

Emergency Push Button

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#27

Field Coil Self Starter 12 V

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#28

Armature

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#29

Digital Meter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#30

Self Starter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#31

MCB

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#32

AVR

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#33

Air Cleaner

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#34

Air Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#35

Fuel Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#36

Push Rod Seal

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 90 days
#37

Exhaust Gaskit

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#38

Tappet Gasket

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#39

Fuel Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 90 days
#40

Fuel Feed Pump

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#41

Air Filter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#42

Degital Meter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#43

Self Starter

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days
#44

MCB

STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 90 days

Categories 45

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer