SA water pump,Shock absorber assy rear,DDU repair kit,Parts kit air compressor Air Dryer,Isolator s
Indian Army
PUNE, MAHARASHTRA
Progress
Quantity
16
Category
INJECTOR CONTROL VALVE
Bid Type
Two Packet Bid
Indian Army invites bids for INJECTOR CONTROL VALVE, SHOCK ABSORBER ASSY FRONT, SHOCK ABSORBER ASSY REAR, BRUSH CARRIER PLATE, WATER CONTAINER, WATER PUMP, BELT TENSIONER, SWITCH ASSY, SPROCKET COMP, ARM ASSY KICK in AHMEDABAD, GUJARAT. Quantity: 16. Submission Deadline: 02-03-2026 14: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PUNE, MAHARASHTRA
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | INJECTOR CONTROL VALVE | AS PER BID TS | 4 | pieces | srijankhurana.976 | 15 |
| 2 | SHOCK ABSORBER ASSY FRONT | AS PER BID TS | 2 | pieces | srijankhurana.976 | 15 |
| 3 | SHOCK ABSORBER ASSY REAR | AS PER BID TS | 2 | pieces | srijankhurana.976 | 15 |
| 4 | BRUSH CARRIER PLATE | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
| 5 | WATER CONTAINER | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
| 6 | WATER PUMP | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
| 7 | BELT TENSIONER | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
| 8 | SWITCH ASSY | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
| 9 | SPROCKET COMP | AS PER BID TS | 2 | pieces | srijankhurana.976 | 15 |
| 10 | ARM ASSY KICK | AS PER BID TS | 1 | pieces | srijankhurana.976 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS