Progress
A tender has been published for Indian Army Rack Server, Master Local Craft Device, Slave Local Craft Device, Metro Ethernet Switch, Storage, 2U Rack, UTP Cable, Asymmetric Digital Subscriber Line, Automation Application, Installation and commissioning in North Goa, GOA. Quantity: 49 by. Submission Deadline: 17-10-2026 21: 00: 00. Check eligibility and apply.
Quantity
49
Category
Automation Application
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
17
OEM Avg. Turnover
130
Past Performance
50 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rack Server , Master Local Craft Device , Slave Local Craft Device , Metro Ethernet Switch , Storage , 2U Rack , UTP Cable , Asymmetric Digital Subscriber Line , Automation Application , Installation and commissioning
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
40
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
NORTH GOA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NORTH GOA | NORTH GOA | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Oct-2026, 3:30 pm
Opening Date
18-Oct-2026, 3:30 pm
Rack Server
Rack Server
Master Local Craft Device
Master Local Craft Device
Slave Local Craft Device
Slave Local Craft Device
Metro Ethernet Switch
Metro Ethernet Switch
Storage
Storage
2U Rack
2U Rack
UTP Cable
UTP Cable
Asymmetric Digital Subscriber Line
Asymmetric Digital Subscriber Line
Automation Application
Automation Application
Installation and commissioning
Installation and commissioning
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Rack Server | Rack Server | 1 | nos | 3ttracct | 60 | |
| 2 | Master Local Craft Device | Master Local Craft Device | 20 | nos | 3ttracct | 60 | |
| 3 | Slave Local Craft Device | Slave Local Craft Device | 20 | nos | 3ttracct | 60 | |
| 4 | Metro Ethernet Switch | Metro Ethernet Switch | 1 | nos | 3ttracct | 60 | |
| 5 | Storage | Storage | 1 | nos | 3ttracct | 60 | |
| 6 | 2U Rack | 2U Rack | 1 | nos | 3ttracct | 60 | |
| 7 | UTP Cable | UTP Cable | 2 | roll | 3ttracct | 60 | |
| 8 | Asymmetric Digital Subscriber Line | Asymmetric Digital Subscriber Line | 1 | nos | 3ttracct | 60 | |
| 9 | Automation Application | Automation Application | 1 | nos | 3ttracct | 60 | |
| 10 | Installation and commissioning | Installation and commissioning | 1 | job | 3ttracct | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer