Bid Publish Date
12-Jun-2026, 12:52 pm
Bid End Date
03-Jul-2026, 3:00 pm
EMD
₹96,120
Value
₹96,12,072
Location
Progress
RAUranium Corporation Of India Limited invites bids for Title1, Title2, Title3, Title4, Title5 in EAST SINGHBHUM, JHARKHAND. Quantity: 14700. Submission Deadline: 03-07-2026 15: 00: 00. Submit your proposal before the deadline.
Start
28-Aug-2026, 4:00 pm
End
29-Aug-2026, 4:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
14700
Category
Title1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Title1 , Title2 , Title3 , Title4 , Title5
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Title1
Deployment of manpower 10 nos unskilled for cleaning sewage pits, aerator, clarifier polishing pond, dewatering chamber, regular cleaning of dry bed and shifting of dry sludge, grass and jungle cutting, brooming of office building, daily maintenance of pumps, aerator grit dozer, sludge, recycle pumps, float valve, aerator blade, aerator chamber, oil changing, shifting of pumps, dismantling refixing through departmental vehicle and any other operation as required in three shift A, B, and C, one operator, one helper and rest reliever. Dry bed cleaning and maintenance with helper, Maintenance and operation of pumps by providing manpower for 24 months including taking out old bore hole pumps and refixing after maintenance but all the spare parts will be provided by the corporation by deploying 01 person each for all shifts nos. 4 inches leather packing and 30 nos. L150 spider supply by the the cotractor and also JCB shall provide by the contractor within 2 KM for sludge loading and unloading purpose, but Tractor shall be provide by corporation.
Title2
Deployment of 05 Nos. Semi skilled manpower including supervisor
Title3
Sodium Hypochlorite Solution Industrial Grade
Title4
GI Pipes 50 mm dia
Title5
GI Pipes 40 mm dia
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Deployment of manpower 10 nos unskilled for cleaning sewage pits, aerator, clarifier polishing pond, dewatering chamber, regular cleaning of dry bed and shifting of dry sludge, grass and jungle cutting, brooming of office building, daily maintenance of pumps, aerator grit dozer, sludge, recycle pumps, float valve, aerator blade, aerator chamber, oil changing, shifting of pumps, dismantling refixing through departmental vehicle and any other operation as required in three shift A, B, and C, one operator, one helper and rest reliever. Dry bed cleaning and maintenance with helper, Maintenance and operation of pumps by providing manpower for 24 months including taking out old bore hole pumps and refixing after maintenance but all the spare parts will be provided by the corporation by deploying 01 person each for all shifts nos. 4 inches leather packing and 30 nos. L150 spider supply by the the cotractor and also JCB shall provide by the contractor within 2 KM for sludge loading and unloading purpose, but Tractor shall be provide by corporation. | 7,300 | mandays | dgmauto | 730 | |
| 2 | Title2 | Deployment of 05 Nos. Semi skilled manpower including supervisor | 3,650 | mandays | dgmauto | 730 | |
| 3 | Title3 | Sodium Hypochlorite Solution Industrial Grade | 3,400 | kilogram | dgmauto | 730 | |
| 4 | Title4 | GI Pipes 50 mm dia | 150 | metre | dgmauto | 730 | |
| 5 | Title5 | GI Pipes 40 mm dia | 200 | metre | dgmauto | 730 |
Experience Criteria
Bidder Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer