Bid Publish Date
09-Oct-2026, 7:48 pm
Bid End Date
22-Oct-2026, 8:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, invites bids for the supply of UPS batteries rated at 12V 7Ah. The scope includes Supply, Installation, Testing, Commissioning, and Operator Training, with statutory clearances as required. The bid accommodates quantity adjustments up to 25% during contract execution. Bidders must demonstrate turnover and establish service infrastructure for after-sales support. Location details are not specified in the notice, but service capability spans the bidder’s nationwide network to meet on-site or carry-in warranty needs. A two-year warranty is required post-acceptance, ensuring post-sale support. This tender emphasizes turnkey implementation and robust service obligations, setting the stage for a compliant supplier with strong financials and logistics readiness.
Product: UPS battery 12V 7Ah
Warranty: 2 years from final acceptance
Quantity flex: +/- 25% during contract
Delivery: minimum 30 days after extended period calculations
Service: functional service centre in each consignee state; toll-free support
Scope: supply, installation, testing, commissioning, operator training, statutory clearances
Financials: turnover proof via audited statements or CA/Cost Accountant certificate
Option to adjust quantity up to 25% during contract
Two-year warranty from acceptance date
Functional service centre required in each consignee state
Dedicated toll-free service number mandatory
Turnover evidence: last three financial years
Delivery timeline linked to original and extended periods
Not explicitly stated; bidders must align with organization policy and provide standard bid security and payment documentation as per terms
Delivery period starts from last date of original delivery order; option-based extensions follow calculated formula with minimum 30 days
Not specified in the notice; bidders should anticipate standard penalties for delayed delivery as per contract terms
Minimum average turnover as per bid document (last 3 years)
Functional service centre in each consignee state or plan to establish within 30 days of award
Dedicated toll-free service number for support
Compliance with option clause for quantity adjustments up to 25%
Quantity
20
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Warranty Period
2 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
UPS battery 12V 7AH
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
DODA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | DODA | DODA | - | - | 20 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
22-Oct-2026, 2:30 pm
Opening Date
23-Oct-2026, 2:30 pm
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
Evidence of Functional Service Centre in the State of each consignee (or plan to establish within 30 days)
OEM authorization or credentials for UPS batteries (if applicable)
Any other bid-specific technical/commercial documents as per terms
Key insights about JAMMU AND KASHMIR tender market
To bid, ensure your firm has a 12V 7Ah UPS battery supply capability, provide PAN, GSTIN, cancelled cheque, and EFT mandate. Include turnover proof for last 3 years, confirm service center readiness in consignee states, and demonstrate 2-year warranty capability with post-sale support.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT mandate, turnover certificates (audited CA/Cost Accountant), and evidence of a functional service center or a plan to establish one within 30 days of award, plus any OEM authorizations if applicable.
The warranty term is 2 years from the date of final acceptance or completion, whichever occurs later, ensuring post-acceptance support and replacement for defects arising during normal use.
The Purchaser may increase or decrease the quantity by up to 25% of the bid quantity at contract placement or during the currency of the contract, with extensions calculated by the specified formula.
Delivery starts after the last date of the original order; if extended, the additional time equals (Increased/Original) × Original delivery period, minimum 30 days. The purchaser may extend within the contract limits.
Bidder must maintain a dedicated toll-free service number and establish a functional service center in each consignee state, with evidence of center readiness provided before payment release.
The notice does not specify particular standards; bidders should ensure general quality compliance for UPS batteries, with attention to reliability, compatibility, and post-installation support according to Army procurement norms.
Bid price must include supply, installation, testing, commissioning of the UPS batteries, operator training, and any required statutory clearances, all within the quoted total cost.