Progress
Quantity
25
Bid Type
Single Packet Bid
The procurement is issued by West Central Railway (Indian Railways) for a true RMS clamp meter to be delivered and installed at SSE Power, West Central Railway, Kota, Rajasthan (PIN 324002). The scope centers on selecting a single supplier capable of supplying a true RMS clamp meter with comprehensive post‑sales support, including installation and commissioning where applicable. Key differentiators include a 3-year OEM warranty and mandatory data sheet verification against offered specifications. The address and contact details for installation are clearly defined to ensure site readiness. This tender requires verified OEM authorization and robust after‑sales infrastructure within India.
True RMS clamp meter with specified measurement ranges for resistance, frequency, AC/DC current, and AC/DC voltage
Display type and count must be compatible with standard use in railway environments
Safety rating and compliance requirements clearly stated
3-year OEM warranty with service commitments and SLAs
Data Sheet alignment with offered parameters; OEM authorization verified
Warranty: 3-year coverage from final acceptance or completion of installation/commissioning
Delivery to Kota, Rajasthan with on-site installation/commissioning included if scope
Penalties: 0.5% weekly delay penalty, capped at 10% of contract value
GST to be borne by bidder; reimbursement per actuals or applicable rate; payment terms to be clarified in contract
Delivery and installation to be completed at SSE Power West Central Railway Kota; site address provided in terms
3-day service window after defect notification; 0.5% weekly penalty; cumulative cap at 10% of total contract value
Must provide OEM authorization or be an authorized distributor with complete details
Demonstrated post‑sales service capability in India with local service centers
Data Sheet precisely matching offered product specifications
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
true rms clamp meter (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kota
Delivery Pincodes
324002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sunil Kumar Chandel | 324002,DRM Office | Kota | Rajasthan | 324002 | 25 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| GENERAL FEATURES | Type | Hand Held |
| GENERAL FEATURES | Display | 4 digit Backlit LCD |
| GENERAL FEATURES | Measurement Type | True RMS |
| GENERAL FEATURES | count | 6000 |
| MEASUREMENT FEATURES | Resistance Measurement Range | 100.0 |
| MEASUREMENT FEATURES | Resistance Measurement Accuracy (+/-) | 0.5 |
| MEASUREMENT FEATURES | Frequency Measurement Range | 0.5 |
| MEASUREMENT FEATURES | Frequency Measurement Accuracy (+/-) | 0.5 |
| MEASUREMENT FEATURES | AC Current Measurement Range | 1000.0 |
| MEASUREMENT FEATURES | AC Current Measurement Accuracy (+/-) | 1.0 |
| MEASUREMENT FEATURES | AC Voltage Measurement Range | 1000.0 |
| MEASUREMENT FEATURES | AC Voltage Measurement Accuracy (+/-) | 1.5 |
| MEASUREMENT FEATURES | DC Current Measurement Range | 1000.0 |
| MEASUREMENT FEATURES | DC Current Measurement Accuracy (+/-) | 1.5 |
| MEASUREMENT FEATURES | DC Voltage Measurement Range | 1000.0 |
| MEASUREMENT FEATURES | DC Voltage Measurement Accuracy (+/-) | 1.0 |
| SAFETY | Safety Rating | CAT III 600 V of IEC 61010 -2-D31 |
| SERVICE | Warranty | 2.0 |
Discover companies most likely to bid on this tender
Data Sheet of the offered clamp meter
OEM authorization/Authorisation Form from the Original Equipment Manufacturer
Proof of service centers in India and contact details
GST registration certificate and PAN card
Technical bid documents showing compliance with offered parameters
Experience certificates or proofs of similar clamp meter supply/installation
Any installation/commissioning certificates if included in scope
Key insights about RAJASTHAN tender market
Bidders must submit Data Sheet, OEM authorization, and evidence of Indian after‑sales capability. Include service center details, GST registration, and PAN. Ensure offered parameters match the Data Sheet; non‑matching specs may cause rejection. Adhere to installation terms and warranty commitments.
Required documents include the Data Sheet, OEM authorization, GST certificate, PAN card, experience certificates, financial statements, and installation/commissioning certificates if applicable. Ensure service centers in India are listed and that the bid aligns with this scope and warranty terms.
The contract requires a 3-year OEM warranty from final acceptance or after installation. A dedicated team must provide timely service within 3 days of notification; failures incur a penalty of 0.5% of unit price per week up to a maximum of 10% of contract value.
Delivery is to SSE Power West Central Railway Kota, Rajasthan, PIN 324002. Installation and commissioning should be performed on-site at the consignee location if included, with service support arranged near Kota. Ensure installation records accompany the bid where required.
Bidders must apply GST at their prevailing rate; the railway will reimburse GST as actuals or at the lower applicable rate, whichever is lower. Ensure quotes clearly separate base price and GST to facilitate reimbursement.
The Data Sheet is mandatory and must precisely reflect the offered clamp meter’s technical parameters. Mismatches can trigger bid rejection. Ensure the Data Sheet is uploaded with the bid and cross‑verified against OEM specifications.
Bid submissions must include an OEM Authorization Form/Certificate that details the distributor or service provider’s name, designation, address, email, and phone. This confirms legitimacy to supply, install, and service the clamp meter within India.
The seller must deploy adequate technical staff for timely service. Warranty service must be completed within 3 days of defect notification; penalties apply if delays exceed this SLA, with a cap at 10% of total contract value.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS