TenderDekho Logo
Active GEM

Hindustan Petroleum Corporation Ltd AFC Fan Modification Tender Visakhapatnam Andhra Pradesh 2026

Bid Publish Date

10-Oct-2026, 4:15 pm

Bid End Date

21-Oct-2026, 3:00 pm

Progress

Issue10-Oct-2026, 4:15 pm
AwardPending

Key Highlights

  • • AFC fan modification tender for HPCL Visakhapatnam
  • • 25% quantity variation right during contract and currency
  • • Supply-only scope with no on-site installation details
  • • GST assessment by bidder; reimbursement as actuals or lower rate

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for the modification of an AFC fan at the Visakhapatnam, Andhra Pradesh facility. The scope is strictly supply of goods with no on-site installation or services detailed. The tender allows bid quantities to be varied by up to 25%, either at the time of contract placement or during the contract term, at the original contract rates. Bidders should plan for potential extended delivery timelines linked to quantity variations, with a minimum extension of 30 days. GST considerations are noted—tenders advise bidders to determine GST impact independently. The absence of a BOQ implies itemization will be clarified in the ATC or subsequent amendments. The procurement context centers on equipment modification for AFC fan systems within HPCL’s Visakhapatnam operations, highlighting a flexible quantity approach and a supply-only deliverable.

Technical Specifications & Requirements

  • Organization: Hindustan Petroleum Corporation Ltd (HPCL)
  • Location: Visakhapatnam, Andhra Pradesh 530001
  • Product/Service: Modification of AFC fan (supply of goods only)
  • Delivery/Category: Supply-only; no installation details provided
  • Option Clause: Quantity may increase/decrease by up to 25%; extended delivery period calculated per formula; minimum extension 30 days
  • GST: Bidder to assess GST impact; HPCL reimbursement as per actuals or lower applicable rate
  • ATC/BOQ: ATC document referenced; no BOQ items present in current data
  • ATC/ATC Terms: Compliance with eventual ATC document; terms to be followed as viewable
  • Estimated Value/EMD: Not specified in available data; values to be clarified in ATC
  • Eligibility: Standard procurement norms; verify GST, supplier qualifications, and compliance requirements in ATC

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may adjust quantity by up to 25% during contract; delivery time scales with formula and minimum 30 days
  • GST: Bidder responsible for GST; reimbursement as actuals or lower rate, subject to quoted GST
  • Scope: Bid price includes all costs for supply of goods; no services
  • ATC/Documentation: Review ATC document for additional conditions; ensure compliance with HPCL procurement norms
  • BOQ: No BOQ items present; expect clarifications in ATC or amendments

Key Specifications

  • Product/service: AFC fan modification goods supply

  • Location: Visakhapatnam, Andhra Pradesh

  • Quantity: up to 25% variation allowed

  • Delivery: minimum 30 days extension for option quantity changes

  • GST: bidder to determine and HPCL reimburses per actuals or lower rate

  • BOQ: none currently; await ATC clarification

  • Standards/Brand: not specified in available data

Terms & Conditions

  • Option Clause permits ±25% quantity change during contract

  • Supply-only scope; no installation or services stated

  • GST responsibility with reimbursement terms per ATC

Important Clauses

Payment Terms

GST to be assessed by bidder; reimbursement as actuals or lower rate; payment terms to be defined in ATC

Delivery Schedule

Delivery period linked to quantity variations with minimum 30-day extension; schedule to be finalized with contract delivery order

Penalties/Liquidated Damages

Not specified in current data; penalties to be detailed in ATC

Bidder Eligibility

  • Evidence of prior AFC fan supply or modification experience

  • Valid GST registration and compliance with India GST norms

  • Financial capability to handle supply of goods; relevant turnover may be specified in ATC

Advertisement

Tender Data

Bid Details

Quantity

3

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Modification of AFC fan

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

14

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

40

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
U V Satyanarayana Anirudh530011,HPCL, Visakh Refinery, PB No. 15, Malkapuram, Visakhapatnam-530011VisakhapatanamAndhra Pradesh530011340-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9992313.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates in AFC fan modification or related equipment supply

4

Financial statements or bank statements as required by HPCL

5

EMD submission details (to be clarified in ATC)

6

Technical bid documents as per ATC

7

OEM authorization or authorized distributor certificates (if applicable)

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for HPCL AFC fan modification tender in Visakhapatnam?

To bid, confirm HPCL's ATC terms, assess GST impact, prepare GST registration, PAN, and vendor experience certificates, and submit the supply-only bid for AFC fan modification at Visakhapatnam. Ensure knowledge of the 25% quantity variation and minimum 30-day extension rules.

What documents are required for HPCL AFC fan tender in Andhra Pradesh?

Submit GST certificate, PAN card, experience certificates for AFC fan projects, financial statements, and OEM authorizations if applicable. Include any ATC-specific technical bids and EMD submission details as clarified in the ATC document.

What is the delivery timeline for HPCL AFC fan modification bids?

Delivery timing depends on the extended period formula for increased quantity: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Final delivery schedule will be set in the contract delivery order.

What are the GST considerations for HPCL Visakhapatnam bids?

Bidders must determine GST applicability independently; HPCL will reimburse GST at actuals or the lower applicable rate, limited to the rate quoted by the bidder. Ensure GSTIN and proper invoicing per GST norms.

What is the scope of supply for this HPCL AFC fan tender?

Scope is strictly the supply of goods for AFC fan modification; no installation or on-site services are described in the current data. Verify any ATC clarifications for potential service components.

What rights does HPCL reserve regarding quantity changes?

HPCL may increase or decrease bid quantities up to 25% at contract placement and during the contract term at contracted rates. This requires adherence to the option clause and updated delivery timelines.

Advertisement