Bid Publish Date
10-Oct-2026, 4:15 pm
Bid End Date
21-Oct-2026, 3:00 pm
Location
Progress
Hindustan Petroleum Corporation Ltd invites bids for the modification of an AFC fan at the Visakhapatnam, Andhra Pradesh facility. The scope is strictly supply of goods with no on-site installation or services detailed. The tender allows bid quantities to be varied by up to 25%, either at the time of contract placement or during the contract term, at the original contract rates. Bidders should plan for potential extended delivery timelines linked to quantity variations, with a minimum extension of 30 days. GST considerations are noted—tenders advise bidders to determine GST impact independently. The absence of a BOQ implies itemization will be clarified in the ATC or subsequent amendments. The procurement context centers on equipment modification for AFC fan systems within HPCL’s Visakhapatnam operations, highlighting a flexible quantity approach and a supply-only deliverable.
Product/service: AFC fan modification goods supply
Location: Visakhapatnam, Andhra Pradesh
Quantity: up to 25% variation allowed
Delivery: minimum 30 days extension for option quantity changes
GST: bidder to determine and HPCL reimburses per actuals or lower rate
BOQ: none currently; await ATC clarification
Standards/Brand: not specified in available data
Option Clause permits ±25% quantity change during contract
Supply-only scope; no installation or services stated
GST responsibility with reimbursement terms per ATC
GST to be assessed by bidder; reimbursement as actuals or lower rate; payment terms to be defined in ATC
Delivery period linked to quantity variations with minimum 30-day extension; schedule to be finalized with contract delivery order
Not specified in current data; penalties to be detailed in ATC
Evidence of prior AFC fan supply or modification experience
Valid GST registration and compliance with India GST norms
Financial capability to handle supply of goods; relevant turnover may be specified in ATC
Quantity
3
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Modification of AFC fan
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
40
Delivery Locations
1
Delivery Cities
Visakhapatanam
Delivery Pincodes
530011
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| U V Satyanarayana Anirudh | 530011,HPCL, Visakh Refinery, PB No. 15, Malkapuram, Visakhapatnam-530011 | Visakhapatanam | Andhra Pradesh | 530011 | 3 | 40 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates in AFC fan modification or related equipment supply
Financial statements or bank statements as required by HPCL
EMD submission details (to be clarified in ATC)
Technical bid documents as per ATC
OEM authorization or authorized distributor certificates (if applicable)
Key insights about ANDHRA PRADESH tender market
To bid, confirm HPCL's ATC terms, assess GST impact, prepare GST registration, PAN, and vendor experience certificates, and submit the supply-only bid for AFC fan modification at Visakhapatnam. Ensure knowledge of the 25% quantity variation and minimum 30-day extension rules.
Submit GST certificate, PAN card, experience certificates for AFC fan projects, financial statements, and OEM authorizations if applicable. Include any ATC-specific technical bids and EMD submission details as clarified in the ATC document.
Delivery timing depends on the extended period formula for increased quantity: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Final delivery schedule will be set in the contract delivery order.
Bidders must determine GST applicability independently; HPCL will reimburse GST at actuals or the lower applicable rate, limited to the rate quoted by the bidder. Ensure GSTIN and proper invoicing per GST norms.
Scope is strictly the supply of goods for AFC fan modification; no installation or on-site services are described in the current data. Verify any ATC clarifications for potential service components.
HPCL may increase or decrease bid quantities up to 25% at contract placement and during the contract term at contracted rates. This requires adherence to the option clause and updated delivery timelines.