TenderDekho Logo
GEM

Contract Bidding Open For Access Control,Push Switch,MS Box,OFC Cable,1200LBS EM Lock,CAT6,4Port PoE,SFP,6Port LIU,12Port LIU

Bid Publish Date

15-Jul-2026, 3:29 pm

Bid End Date

14-Aug-2026, 4:00 pm

Progress

Issue15-Jul-2026, 3:29 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

49832

Category

Access Control

Bid Type

Two Packet Bid

Categories 43

A tender has been published for Power Grid Corporation Of India Limited Access Control, Push Switch, MS Box, OFC Cable, 1200LBS EM Lock, CAT6, 4Port PoE, SFP, 6Port LIU, 12Port LIU, SM Duplex, 4U Indoor Rack, Power Cable, HDPE Pipe, PVC Pipe, PVC Box, Power Cabling Laying, Installation, testing, comm, 8Port PoE, 24Port LIU, 6U Indoor Rack, 600LBS EM Lock, SFP Port Switch. Quantity: 49832 by. Submission Deadline: 14-08-2026 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Access Control , Push Switch , MS Box , OFC Cable , 1200LBS EM Lock , CAT6 , 4Port PoE , SFP , 6Port LIU , 12Port LIU , SM Duplex , 4U Indoor Rack , Power Cable , HDPE Pipe , PVC Pipe , PVC Box , Power Cabling Laying , Installation, testing, comm , 8Port PoE , 24Port LIU , 6U Indoor Rack , 600LBS EM Lock , SFP Port Switch

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

20

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Paschim Bardhaman

Delivery Pincodes

713205

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anupam Guchhait713205,POWERGRID CORPORATION OF INDIA LIMITED, 400/220 KV DURGAPUR SUB-STATION, VILL: PARULIA, PO: DHABANI, DURGAPUR-5, DIST: PASCHIM BARDHAMAN, WEST BENGAL- 713205Paschim BardhamanWest Bengal7132052150-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9573993.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Switch,Switch,SFP Module,DAC Cable,Indoor Access Point,Outdoor Access Point,Hardware Controller,OFC

N/a

PUNE, MAHARASHTRA

Posted: 23 April 2025
Closed: 25 June 2025
GEM

CCTV Camra,NVR,Hard Disk,management switch,Junction Box PC switch,SFP Switch,Fiber switch SFP 8 Por

Indian Air Force

BARNALA, PUNJAB

Posted: 13 February 2025
Closed: 6 March 2025
GEM

L3 Core Switch,L2 Access Switch 48 Port Non POE,L2 48 Port POE,L2 Multigig Switch 24 Port,10 Gigabi

Cpwd

MUMBAI, MAHARASHTRA

Posted: 13 March 2025
Closed: 3 April 2025
GEM

Core Switch,48 Port Switch,24 Port switch,8 port Switch,Firewall,Firewall,Access points,Fiber modul

Controller General Of Defence Accounts

HYDERABAD, TELANGANA

Posted: 10 July 2025
Closed: 9 August 2025
GEM

SFP Module Multimode,SFP Module Singlemode,8 port PoE Switch,8 port Switch,24 port PoE Switch,Wirel

Indian Institute Of Engineering Science And Technology

HOWRAH, WEST BENGAL

Posted: 2 January 2025
Closed: 3 February 2025
GEM

Bill of Quantities (BOQ) 196 Items Sign in for GEM prices

#1

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

2 nos Delivery: 150 days
#2

Push Switch

No Touch Push Switch

2 nos Delivery: 150 days
#3

MS Box

Outdoor MS Box

2 nos Delivery: 150 days
#4

OFC Cable

6 Core OFC Cable

500 metres Delivery: 150 days
#6

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

2 nos Delivery: 150 days
#7

CAT6

CAT6 UTP Cable

50 metres Delivery: 150 days
#10

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

3 nos Delivery: 150 days
#11

SFP

SFP Transreceiver

6 nos Delivery: 150 days
#12

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#13

12Port LIU

12Port LIU

1 nos Delivery: 150 days
#15

SM Duplex

SM Duplex Fiber Patch Cord

6 nos Delivery: 150 days
#16

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#18

Power Cable

3Core 1.5mm Power Cable

50 metres Delivery: 150 days
#19

HDPE Pipe

25mm HDPE Pipe

480 metres Delivery: 150 days
#20

PVC Pipe

25mm PVC Pipe with Accessories

50 metres Delivery: 150 days
#21

PVC Box

PVC Box 4/4

2 nos Delivery: 150 days
#23

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

600 metres Delivery: 150 days
#24

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

2 nos Delivery: 150 days
#25

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

7 nos Delivery: 150 days
#26

Push Switch

No Touch Push Switch

7 nos Delivery: 150 days
#27

MS Box

Outdoor MS Box

7 nos Delivery: 150 days
#28

OFC Cable

6 Core OFC Cable

1,300 metres Delivery: 150 days
#30

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

7 nos Delivery: 150 days
#31

CAT6

CAT6 UTP Cable

180 metres Delivery: 150 days
#33

8Port PoE

8Port PoE + 4SFP Port Industrial Switch

2 nos Delivery: 150 days
#34

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

5 nos Delivery: 150 days
#35

SFP

SFP Transreceiver

18 nos Delivery: 150 days
#36

6Port LIU

6Port LIU

4 nos Delivery: 150 days
#37

12Port LIU

12Port LIU

1 nos Delivery: 150 days
#38

24Port LIU

24Port LIU

1 nos Delivery: 150 days
#39

SM Duplex

SM Duplex Fiber Patch Cord

14 nos Delivery: 150 days
#40

4U Indoor Rack

4U Indoor Rack

6 nos Delivery: 150 days
#41

6U Indoor Rack

6U Indoor Rack

1 nos Delivery: 150 days
#42

Power Cable

3Core 1.5mm Power Cable

150 metres Delivery: 150 days
#43

HDPE Pipe

25mm HDPE Pipe

1,250 metres Delivery: 150 days
#44

PVC Pipe

25mm PVC Pipe with Accessories

190 metres Delivery: 150 days
#45

PVC Box

PVC Box 4/4

7 nos Delivery: 150 days
#47

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

1,630 metres Delivery: 150 days
#48

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

7 nos Delivery: 150 days
#49

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

2 nos Delivery: 150 days
#50

Push Switch

No Touch Push Switch

2 nos Delivery: 150 days
#51

MS Box

Outdoor MS Box

2 nos Delivery: 150 days
#52

OFC Cable

6 Core OFC Cable

460 metres Delivery: 150 days
#54

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

2 nos Delivery: 150 days
#55

CAT6

CAT6 UTP Cable

60 metres Delivery: 150 days
#58

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

3 nos Delivery: 150 days
#59

SFP

SFP Transreceiver

6 nos Delivery: 150 days
#60

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#61

12Port LIU

12Port LIU

1 nos Delivery: 150 days
#63

SM Duplex

SM Duplex Fiber Patch Cord

6 nos Delivery: 150 days
#64

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#66

Power Cable

3Core 1.5mm Power Cable

40 metres Delivery: 150 days
#67

HDPE Pipe

25mm HDPE Pipe

440 metres Delivery: 150 days
#68

PVC Pipe

25mm PVC Pipe with Accessories

40 metres Delivery: 150 days
#69

PVC Box

PVC Box 4/4

2 nos Delivery: 150 days
#71

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

560 metres Delivery: 150 days
#72

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

2 nos Delivery: 150 days
#73

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

1 nos Delivery: 150 days
#74

Push Switch

No Touch Push Switch

1 nos Delivery: 150 days
#75

MS Box

Outdoor MS Box

1 nos Delivery: 150 days
#76

OFC Cable

6 Core OFC Cable

60 metres Delivery: 150 days
#78

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

1 nos Delivery: 150 days
#79

CAT6

CAT6 UTP Cable

30 metres Delivery: 150 days
#82

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

2 nos Delivery: 150 days
#83

SFP

SFP Transreceiver

4 nos Delivery: 150 days
#84

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#87

SM Duplex

SM Duplex Fiber Patch Cord

4 nos Delivery: 150 days
#88

4U Indoor Rack

4U Indoor Rack

2 nos Delivery: 150 days
#90

Power Cable

3Core 1.5mm Power Cable

20 metres Delivery: 150 days
#91

HDPE Pipe

25mm HDPE Pipe

60 metres Delivery: 150 days
#92

PVC Pipe

25mm PVC Pipe with Accessories

20 metres Delivery: 150 days
#93

PVC Box

PVC Box 4/4

1 nos Delivery: 150 days
#94

PVC Box

Outdoor PVC Box 4/6

1 nos Delivery: 150 days
#95

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

110 metres Delivery: 150 days
#96

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

1 nos Delivery: 150 days
#97

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

3 nos Delivery: 150 days
#98

Push Switch

No Touch Push Switch

3 nos Delivery: 150 days
#99

MS Box

Outdoor MS Box

3 nos Delivery: 150 days
#100

OFC Cable

6 Core OFC Cable

590 metres Delivery: 150 days
#102

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

3 nos Delivery: 150 days
#103

CAT6

CAT6 UTP Cable

65 metres Delivery: 150 days
#105

8Port PoE

8Port PoE + 4SFP Port Industrial Switch

1 nos Delivery: 150 days
#106

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

3 nos Delivery: 150 days
#107

SFP

SFP Transreceiver

10 nos Delivery: 150 days
#108

6Port LIU

6Port LIU

3 nos Delivery: 150 days
#110

24Port LIU

24Port LIU

1 nos Delivery: 150 days
#111

SM Duplex

SM Duplex Fiber Patch Cord

10 nos Delivery: 150 days
#112

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#113

6U Indoor Rack

6U Indoor Rack

1 nos Delivery: 150 days
#114

Power Cable

3Core 1.5mm Power Cable

60 metres Delivery: 150 days
#115

HDPE Pipe

25mm HDPE Pipe

570 metres Delivery: 150 days
#116

PVC Pipe

25mm PVC Pipe with Accessories

60 metres Delivery: 150 days
#117

PVC Box

PVC Box 4/4

3 nos Delivery: 150 days
#119

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

715 metres Delivery: 150 days
#120

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

3 nos Delivery: 150 days
#121

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

5 nos Delivery: 150 days
#122

Push Switch

No Touch Push Switch

5 nos Delivery: 150 days
#123

MS Box

Outdoor MS Box

5 nos Delivery: 150 days
#124

OFC Cable

6 Core OFC Cable

700 metres Delivery: 150 days
#126

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

5 nos Delivery: 150 days
#127

CAT6

CAT6 UTP Cable

200 metres Delivery: 150 days
#129

8Port PoE

8Port PoE + 4SFP Port Industrial Switch

2 nos Delivery: 150 days
#130

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

2 nos Delivery: 150 days
#131

SFP

SFP Transreceiver

12 nos Delivery: 150 days
#132

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#133

12Port LIU

12Port LIU

2 nos Delivery: 150 days
#135

SM Duplex

SM Duplex Fiber Patch Cord

12 nos Delivery: 150 days
#136

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#137

6U Indoor Rack

6U Indoor Rack

1 nos Delivery: 150 days
#138

Power Cable

3Core 1.5mm Power Cable

100 metres Delivery: 150 days
#139

HDPE Pipe

25mm HDPE Pipe

680 metres Delivery: 150 days
#140

PVC Pipe

25mm PVC Pipe with Accessories

140 metres Delivery: 150 days
#141

PVC Box

PVC Box 4/4

5 nos Delivery: 150 days
#143

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

1,000 metres Delivery: 150 days
#144

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

5 nos Delivery: 150 days
#145

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

6 nos Delivery: 150 days
#146

Push Switch

No Touch Push Switch

6 nos Delivery: 150 days
#147

MS Box

Outdoor MS Box

4 nos Delivery: 150 days
#148

OFC Cable

6 Core OFC Cable

480 metres Delivery: 150 days
#149

600LBS EM Lock

600LBS EM Lock with L & Z Bracket

3 nos Delivery: 150 days
#150

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

3 nos Delivery: 150 days
#151

CAT6

CAT6 UTP Cable

130 metres Delivery: 150 days
#154

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

3 nos Delivery: 150 days
#155

SFP

SFP Transreceiver

6 nos Delivery: 150 days
#156

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#157

12Port LIU

12Port LIU

1 nos Delivery: 150 days
#159

SM Duplex

SM Duplex Fiber Patch Cord

6 nos Delivery: 150 days
#160

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#162

Power Cable

3Core 1.5mm Power Cable

120 metres Delivery: 150 days
#163

HDPE Pipe

25mm HDPE Pipe

460 metres Delivery: 150 days
#164

PVC Pipe

25mm PVC Pipe with Accessories

120 metres Delivery: 150 days
#165

PVC Box

PVC Box 4/4

6 nos Delivery: 150 days
#166

PVC Box

Outdoor PVC Box 4/6

2 nos Delivery: 150 days
#167

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

730 metres Delivery: 150 days
#168

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

6 nos Delivery: 150 days
#169

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

25 nos Delivery: 150 days
#170

Push Switch

No Touch Push Switch

25 nos Delivery: 150 days
#171

MS Box

Outdoor MS Box

25 nos Delivery: 150 days
#172

OFC Cable

6 Core OFC Cable

7,970 metres Delivery: 150 days
#174

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

25 nos Delivery: 150 days
#175

CAT6

CAT6 UTP Cable

305 metres Delivery: 150 days
#176

SFP Port Switch

12Port 10G SFP Port Switch

1 nos Delivery: 150 days
#178

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

23 nos Delivery: 150 days
#179

SFP

SFP Transreceiver

46 nos Delivery: 150 days
#180

6Port LIU

6Port LIU

8 nos Delivery: 150 days
#181

12Port LIU

12Port LIU

14 nos Delivery: 150 days
#182

24Port LIU

24Port LIU

1 nos Delivery: 150 days
#183

SM Duplex

SM Duplex Fiber Patch Cord

54 nos Delivery: 150 days
#184

4U Indoor Rack

4U Indoor Rack

23 nos Delivery: 150 days
#185

6U Indoor Rack

6U Indoor Rack

1 nos Delivery: 150 days
#186

Power Cable

3Core 1.5mm Power Cable

470 metres Delivery: 150 days
#187

HDPE Pipe

25mm HDPE Pipe

7,900 metres Delivery: 150 days
#188

PVC Pipe

25mm PVC Pipe with Accessories

460 metres Delivery: 150 days
#189

PVC Box

PVC Box 4/4

25 nos Delivery: 150 days
#191

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

8,745 metres Delivery: 150 days
#192

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

25 nos Delivery: 150 days
#196

OFC Cable

6 Core OFC Cable

1,200 metres Delivery: 150 days
#201

8Port PoE

8Port PoE + 4SFP Port Industrial Switch

1 nos Delivery: 150 days
#202

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

2 nos Delivery: 150 days
#203

SFP

SFP Transreceiver

8 nos Delivery: 150 days
#204

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#205

12Port LIU

12Port LIU

12 nos Delivery: 150 days
#207

SM Duplex

SM Duplex Fiber Patch Cord

8 nos Delivery: 150 days
#208

4U Indoor Rack

4U Indoor Rack

3 nos Delivery: 150 days
#211

HDPE Pipe

25mm HDPE Pipe

1,200 metres Delivery: 150 days
#215

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

1,200 metres Delivery: 150 days
#217

Access Control

Supply of Fingerprint and Mifare Card based Single Door Access Controller

6 nos Delivery: 150 days
#218

Push Switch

No Touch Push Switch

6 nos Delivery: 150 days
#219

MS Box

Outdoor MS Box

6 nos Delivery: 150 days
#220

OFC Cable

6 Core OFC Cable

900 metres Delivery: 150 days
#222

1200LBS EM Lock

1200LBS EM Lock with L & Z Bracket

6 nos Delivery: 150 days
#223

CAT6

CAT6 UTP Cable

305 metres Delivery: 150 days
#225

8Port PoE

8Port PoE + 4SFP Port Industrial Switch

1 nos Delivery: 150 days
#226

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

6 nos Delivery: 150 days
#227

SFP

SFP Transreceiver

16 nos Delivery: 150 days
#229

12Port LIU

12Port LIU

6 nos Delivery: 150 days
#230

24Port LIU

24Port LIU

1 nos Delivery: 150 days
#231

SM Duplex

SM Duplex Fiber Patch Cord

16 nos Delivery: 150 days
#232

4U Indoor Rack

4U Indoor Rack

6 nos Delivery: 150 days
#233

6U Indoor Rack

6U Indoor Rack

1 nos Delivery: 150 days
#234

Power Cable

3Core 1.5mm Power Cable

140 metres Delivery: 150 days
#235

HDPE Pipe

25mm HDPE Pipe

900 metres Delivery: 150 days
#236

PVC Pipe

25mm PVC Pipe with Accessories

120 metres Delivery: 150 days
#237

PVC Box

PVC Box 4/4

6 nos Delivery: 150 days
#239

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

1,345 metres Delivery: 150 days
#240

Installation, testing, comm

Installation, testing, commissioning, enrollment, and integration of each device complete with all required accessories, connectivity, and interfacing with the existing COSEC Centralized Time Attendance & Access Control Server and Software without changing any Hardware, application and Software License. The scope shall include configuration, system testing, user enrollment, commissioning, and comprehensive onsite warranty maintenance support within the jurisdiction of POWERGRID ER-II covering West Bengal and Sikkim.

6 nos Delivery: 150 days
#244

OFC Cable

6 Core OFC Cable

160 metres Delivery: 150 days
#250

4Port PoE

4Port PoE + 2SFP Port Industrial Switch

2 nos Delivery: 150 days
#251

SFP

SFP Transreceiver

4 nos Delivery: 150 days
#252

6Port LIU

6Port LIU

2 nos Delivery: 150 days
#255

SM Duplex

SM Duplex Fiber Patch Cord

2 nos Delivery: 150 days
#257

6U Indoor Rack

6U Indoor Rack

2 nos Delivery: 150 days
#258

Power Cable

3Core 1.5mm Power Cable

40 metres Delivery: 150 days
#259

HDPE Pipe

25mm HDPE Pipe

160 metres Delivery: 150 days
#260

PVC Pipe

25mm PVC Pipe with Accessories

50 metres Delivery: 150 days
#263

Power Cabling Laying

OFC, CAT6 & Power Cabling Laying with HDPE Pipe and PVC Conduit Pipe including clamping accessories

200 metres Delivery: 150 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

Indian Army Department of Military Affairs Kupwara IT Equipment Tender 2026 for Camera Security Devices, PoE/Core Switches, SFP Modules and Racks

Indian Army

📍 KUPWARA, JAMMU & KASHMIR

EMD: ₹3.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Bullet Camera,Bullet Camera,Dome Cameras,PTZ camera,NVR,NVR,NVR,NVR,HDD,HDD,HDD,OFC Armoured,LIU LO

Indian Air Force

EMD: ₹2.5 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Bullet CCTV Camera,Dome CCTV Camera,08 CH NVR,16 CH NVR,HDD 08 TB,HDD 12 TB,Cat -6 cable,POE Switch

Indian Air Force

📍 SIRSA, HARYANA

EMD: ₹85,000
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM

CAT 6 SFTP Cable 305 Mtr roll,PVC Conduit Casing Capping for Cable 100x40 mm,Complete IO Box Set Ca

Airports Authority Of India

📍 CENTRAL DELHI, DELHI

EMD: ₹1.7 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Dg Of Defence Estate CAT6/ CCTV Networking Tender India 2026 - ISI/ISO Standards Required

Dg Of Defence Estate

📍 NAINITAL, UTTARAKHAND

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM