TenderDekho Logo
Active GEM

BEML Limited Defence Spare Parts Tender Kolar Karnataka 2026 - 45 Item Catalog (NIT details, MKTG DIV) SPA

Bid Publish Date

18-Oct-2026, 3:52 pm

Bid End Date

28-Oct-2026, 4:00 pm

Progress

Issue18-Oct-2026, 3:52 pm
AwardPending

Tender Overview

BEML Limited (Department of Defence Production) in Kolar, Karnataka invites bids for a broad catalog of spare parts spanning 45 items, including springs, oil seals, bearings, gears, clamps, fittings, and assemblies related to hydraulic and steering components. The procurement targets project-level items with delivery to BEML Nagar, KGF, 563115 and requires approved BEML vendors. Tenderers should anticipate a flexible quantity clause and must align with vendor registration procedures on the BEML site. This procurement emphasizes existing supplier capability with BEML/KGF project experience and delivery at the specified regional store. The distinctive scope is the broad parts mix across multiple sub-categories, demanding robust supply chain readiness and prior production experience.

Technical Specifications & Requirements

  • No explicit technical specifications provided in the available data; itemization includes: 1) 2OIL SEAL, 3BODY REL VALVE S S, 4GEAR, 5BEARINGS, 6LOCKS, 7FO TBR OIL, 8GUIDE, 9BRAKE BAND ASSY, 10LOCKS, 11SPRING, 12LOCKS, 13LEVER ASSY, 14RING, 15LOCKS, 16FLANGE ASSY, 17SEAT, 18LOCKS, 19HUB, 20WASHER, 21PIN, 22PIN, 23SPOOL REG VALVE, 24SPRING REG VALVE, 25SPACERS, 26SEAT, 27PUMSS, 28PUMP ASSY, 29TURBINE ASSY, 30OIL SEAL, 31M.KIT SERVICE KIT, 32SPRING, 33ELEMENT, 34STRAINERS, 35ELEMENT, 36FILTER ELEMENTS, 37MAGNET ASSY, 38ELEMENT, 39SCREEN, 40ELEMENT, 41STRAINERS, 42O RING, 43BOLTS, 44STEERING CLUTCH ASSY, 45TORQUE CONVERTER ASSY.
  • Delivery location: BEML Limited KGF Marketing Stores Spares, BEML Nagar, Kolar Gold Fields, 563115, Karnataka.
  • Vendor eligibility: Approved BEML vendors for KGF project items; online vendor registration required.
  • Quantity flexibility: Option clause allows ±50% quantity adjustment at contract; extended delivery time computation formula provided with a minimum 30 days.
  • Documentation rules: All pages must be signed with the firm seal; technical bid to include only technical specs; commercial price to be in separate bid; price details must not appear in the technical bid.

Terms, Conditions & Eligibility

  • EMD and submission: Tender requires standard vendor documentation; the exact EMD amount is not disclosed in the provided data. Bidders must upload price breakups with the commercial bid, while the technical bid must contain only technical specifications.
  • Delivery & scope: Delivery period follows the last date of the original delivery order; extension terms allow additional time per the option clause with a minimum 30 days.
  • Special vendor conditions: Only BEML-approved vendors for KGF project items may quote; non-approved vendors should complete vendor registration via bemlindia.in.
  • Documentation and signing: All documents must be signed and sealed; NIT and specification documents must be signed; lack of seal may result in rejection.
  • Contact and address: Delivery and queries to: DGM (Purchase), BEML Marketing Division, BEML Nagar, KGF, 563115, Karnataka.

Key Specifications

  • 45 item BOQ with broad category coverage including springs, seals, gears, bearings, locks, levers, rings, hubs, washers, pins, valves, pumps, turbines, seals, service kits, magnets, screens, o-rings, bolts, steering clutch assemblies, and torque converter assemblies

  • Delivery address: BEML Limited KGF Marketing Stores Spares, BEML Nagar, Kolar Gold Fields 563115

  • Option clause permits +/-50% quantity adjustment at contract, with extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

  • Technical bid must only include technical specifications; price to be submitted in commercial bid

Terms & Conditions

  • Option clause allows quantity adjustment up to 50% during and after contract

  • Delivery terms anchored to last delivery order date with extended-time computation

  • BEML-approved vendor eligibility required for KGF project items

Important Clauses

Payment Terms

Price to be shown in commercial bid; technical bid must not contain price details; payment terms described in ATC not fully disclosed in data

Delivery Schedule

Delivery period commences from last date of original delivery order; extended time formula applies with minimum 30 days

Penalties/Liquidated Damages

No explicit penalty LD details provided in available data; standard tender terms imply compliance penalties if delivery or quality fails

Bidder Eligibility

  • Must be an approved BEML vendor for KGF project items

  • Must complete vendor registration via bemlindia.in

  • Submit signed and sealed NIT and specification documents with bid

Advertisement

Tender Data

Bid Details

Quantity

846

Category

1SPRING

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1SPRING , 2OIL SEAL , 3BODY REL VALVESS , 4GEAR , 5BEARINGSS , 6LOCKSS , 7FO TBR OIL , 8GUIDE , 9BRAKE BAND ASSY , 10LOCKSS , 11SPRING , 12LOCKSS , 13LEVER ASSY , 14RING , 15LOCKSS , 16FLANGE ASSY , 17SEAT , 18LOCKSS , 19HUB , 20WASHER , 21PIN , 22PIN , 23SPOOL REG VALVE , 24SPRING REG VALVE , 25SPACERSS , 26SEAT , 27PUMPSS , 28PUMP ASSY , 29TURBINE ASSY , 30OIL SEAL , 31M.KIT SERVICE KIT , 32SPRING , 33ELEMENT , 34STRAINERSS , 35ELEMENT , 36FILTER ELEMENTSS , 37MAGNET ASSY , 38ELEMENT , 39SCREEN , 40ELEMENT , 41STRAINERSS , 42O RING , 43BOLTSS , 44STEERING CLUTCH ASSY , 45TORQUE CONVERTER ASSY

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

KOLAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KOLARKOLAR--3160-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-10054452.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bharat Earth Movers Limited (beml)

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 45 Items Sign in for GEM prices

#1

1SPRING

SPRING

31 pieces Delivery: 60 days
#2

2OIL SEAL

OIL SEAL

23 pieces Delivery: 60 days
#3

3BODY REL VALVESS

BODY REL VALVESS

5 pieces Delivery: 60 days
#4

4GEAR

GEAR

11 pieces Delivery: 60 days
#5

5BEARINGSS

BEARINGSS

20 pieces Delivery: 60 days
#6

6LOCKSS

LOCKSS

10 pieces Delivery: 60 days
#7

7FO TBR OIL

FO TBR OIL

36 pieces Delivery: 60 days
#8

8GUIDE

GUIDE

10 pieces Delivery: 60 days
#9

9BRAKE BAND ASSY

BRAKE BAND ASSY

2 pieces Delivery: 60 days
#10

10LOCKSS

LOCKSS

25 pieces Delivery: 60 days
#11

11SPRING

SPRING

10 pieces Delivery: 60 days
#12

12LOCKSS

LOCKSS

10 pieces Delivery: 61 days
#13

13LEVER ASSY

LEVER ASSY

1 pieces Delivery: 62 days
#14

14RING

RING

10 pieces Delivery: 63 days
#15

15LOCKSS

LOCKSS

15 pieces Delivery: 64 days
#16

16FLANGE ASSY

FLANGE ASSY

7 pieces Delivery: 65 days
#17

17SEAT

SEAT

25 pieces Delivery: 66 days
#18

18LOCKSS

LOCKSS

50 pieces Delivery: 67 days
#19

19HUB

HUB

4 pieces Delivery: 68 days
#20

20WASHER

WASHER

10 pieces Delivery: 69 days
#21

21PIN

PIN

10 pieces Delivery: 70 days
#22

22PIN

PIN

10 pieces Delivery: 71 days
#23

23SPOOL REG VALVE

SPOOL REG VALVE

3 pieces Delivery: 72 days
#24

24SPRING REG VALVE

SPRING REG VALVE

3 pieces Delivery: 73 days
#25

25SPACERSS

SPACERSS

4 pieces Delivery: 74 days
#26

26SEAT

SEAT

3 pieces Delivery: 75 days
#27

27PUMPSS

PUMPSS

9 pieces Delivery: 76 days
#28

28PUMP ASSY

PUMP ASSY

44 pieces Delivery: 77 days
#29

29TURBINE ASSY

TURBINE ASSY

8 pieces Delivery: 78 days
#30

30OIL SEAL

OIL SEAL

38 pieces Delivery: 79 days
#31

31M.KIT SERVICE KIT

M.KIT SERVICE KIT

17 pieces Delivery: 80 days
#32

32SPRING

SPRING

2 pieces Delivery: 81 days
#33

33ELEMENT

ELEMENT

40 pieces Delivery: 82 days
#34

34STRAINERSS

STRAINERSS

15 pieces Delivery: 83 days
#35

35ELEMENT

ELEMENT

21 pieces Delivery: 84 days
#36

36FILTER ELEMENTSS

FILTER ELEMENTSS

14 pieces Delivery: 85 days
#37

37MAGNET ASSY

MAGNET ASSY

15 pieces Delivery: 86 days
#38

38ELEMENT

ELEMENT

75 pieces Delivery: 87 days
#39

39SCREEN

SCREEN

20 pieces Delivery: 88 days
#40

40ELEMENT

ELEMENT

42 pieces Delivery: 89 days
#41

41STRAINERSS

STRAINERSS

35 pieces Delivery: 90 days
#42

42O RING

O RING

79 pieces Delivery: 91 days
#43

43BOLTSS

BOLTSS

12 pieces Delivery: 93 days
#44

44STEERING CLUTCH ASSY

STEERING CLUTCH ASSY

6 pieces Delivery: 94 days
#45

45TORQUE CONVERTER ASSY

TORQUE CONVERTER ASSY

6 pieces Delivery: 95 days
Advertisement

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates from previous supply of similar items

4

Financial statements for the last 2 financial years

5

Bid Security / EMD document (as applicable by tender)

6

Technical bid documents detailing compliance with listed items

7

OEM authorization letters (if applicable)

8

Vendor registration documents (as per bemlindia.in process)

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid in the BEML Kolar defence spare parts tender 2026

Bidders must first register as a BEML vendor via bemlindia.in, obtain approval for KGF project items, and then submit two distinct bids: a technical bid detailing specifications for all 45 listed items and a commercial bid with price breakups. Ensure all pages are signed and sealed and deliverables meet the listed item categories.

What documents are required for BEML KGF spare parts tender

Required documents include GST certificate, PAN card, experience certificates for similar items, two financial statements, EMD proof, OEM authorizations if applicable, and signed NIT/specification documents. Technical bid should exclude pricing details; price must appear only in the commercial bid.

What are the delivery terms for BEML KGF project items

Delivery is to the BEML Limited KGF Marketing Stores Spares, with the option clause allowing up to 50% quantity increase and extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What standards or certifications are required for the spare parts

The tender data lists no explicit ISO/IS standards in the provided text; bidders should rely on OEM affiliations and vendor approvals. Ensure OEM authorization letters if required and alignment with BEML procurement expectations for KGF project items.

How is payment structured for the BEML defence parts tender

Payment terms are specified in the ATC but exact percentages are not disclosed here. Bidders must segregate price in the commercial bid; ensure compliance with submission rules that price details appear only in the commercial bid.

Who can participate in the BEML KGF vendor registration process

Only vendors approved by BEML for KGF project items may quote. New vendors should complete the online vendor registration on bemlindia.in and await approval before bidding; non-approved vendors are not eligible for the tender.

Advertisement