TenderDekho Logo
Closed GEM

Iisco Steel Plant BOF EWSS Water Treatment Chemicals Supply Tender Bardhaman West Bengal 2026

Bid Publish Date

21-Sep-2026, 6:20 pm

Bid End Date

12-Oct-2026, 6:00 pm

Progress

Issue21-Sep-2026, 6:20 pm
AwardPending

Tender Overview

The Procuring Organization is Iisco Steel Plant under Steel Authority of India Limited, seeking the supply and application of water treatment chemicals for the cooling circuit and effluent treatment plant of the BOF shop/EWSS, for one month with all associated services. Key terms include a non-split contract, start within 2 months of order, complete within 9 months, and contract validity for 11 months. The inspection framework involves SAIL-ISP Burnpur as the post-receipt inspection authority. Deliverables require a GC from the manufacturer and special packaging for chemicals, with empty drums returnable. Data sheets must be uploaded, and parameter mismatches risk rejection. KPI reporting through a NABL-accredited or ISP-approved third-party lab is mandatory quarterly at vendor cost. The contract emphasizes complete turnkey supply, installation, testing, and commissioning of the chemical system. Unique bidder obligations include KPI-based performance guarantees and chemical expiry labeling on every supply.

Technical Specifications & Requirements

  • Product category: Water treatment chemicals for cooling circuit and effluent treatment
  • Supply scope: Chemical supply, application, installation, testing, commissioning
  • Quantity details: One-month service window; BOM required; complete treatment cycle coverage
  • Standards & QA: Manufacturer’s GC required; special packaging; KPI-based efficacy checks; NABL/ISP-approved third-party lab report quarterly
  • Delivery: Start within 2 months of purchase order; ongoing through treatment cycle; acceptance through post-receipt inspection
  • Packaging: Empty drums/bags returnable; expiry date clearly stated on each supply
  • Inspection: Post-receipt inspection by SAIL-ISP Burnpur; pre-dispatch not specified
  • Authority & accountability: Executing Authority Sri. Bimbadhar Rautaray; Inspection Authority Sri. Alok Kumar Singh
  • Penalty & guarantee: Performance guarantee tied to treatment efficacy; conformance to RFQ KPAs

Terms, Conditions & Eligibility

  • Completion period: 9 months from PO placement; contract validity: 11 months from PO placement
  • Delivery start: within 2 months of order; continuous through cycle
  • Single-party contract: no splitting among vendors
  • Data sheets: Upload data sheet; ensure parameters match; mismatch risks rejection
  • KPI reporting: quarterly reports by a third-party NABL-lab at vendor cost
  • Inspection: Post-receipt inspection by SAIL-ISP Burnpur; other terms as specified by RFQ
  • Documentation: Manufacturer GC, packaging details, GST/PAN, data sheets, and EMD as applicable
  • Warranty/guarantee: Performance guarantee required; efficacy evaluated via RFQ KPAs

Key Specifications

  • Water treatment chemicals for cooling circuit and effluent treatment

  • Delivery window: start within 2 months of order; 9-month execution

  • KPI-based efficacy with quarterly NABL/ISP lab reports

  • Expiry date printed on every chemical bottle/drum

  • Single-vendor execution; no contract splitting

Terms & Conditions

  • 9-month completion from PO; 11-month contract validity

  • 2-month lead time for delivery; continuous treatment cycle

  • KPI reporting via NABL-lab; vendor bears report costs

Important Clauses

Payment Terms

Not specified in tender data; implied per RFQ KPAs and IS terms

Delivery Schedule

Delivery to start within 2 months of PO; ongoing as per treatment cycle

Penalties/Liquidated Damages

Performance guarantee tied to efficacy; penalties to be as per RFQ KPAs and agreement

Bidder Eligibility

  • Eligibility to supply water treatment chemicals for industrial cooling and effluent systems

  • Manufacturer GC and OEM authorization (where applicable)

  • Ability to provide KPI reporting through NABL/ISP-approved lab

Advertisement

Authority & Contact

Organization

Iisco Steel Plant

Office Name

Materials Management Dept Iisco Steel Plant

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

9

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SUPPLY N APPLICATION OF CHEMICAL

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

335

Delivery Locations

1

Delivery Cities

Paschim Bardhaman

Delivery Pincodes

713325

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjoy Kumar Maji713325,Materials Management Dept. IISCO Steel Plant BurnpurPaschim BardhamanWest Bengal7133259335-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDIISCO STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9793964.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Cancelled cheque

4

EFT mandate certified by bank

5

Data Sheet of chemical products offered

6

Manufacturer's Goods Condition (GC) certificate

7

OEM authorization (if applicable)

8

Lot-wise or batch-wise BOM and technical compliance certificates

9

Evidence of NABL/ISP-approved third-party lab for KPI reporting

10

Post-dispatch inspection acceptance documents (as applicable)

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for water treatment chemicals tender in Bardhaman 2026

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and manufacturer GC with data sheets. Ensure NABL/ISP-lab KPI reporting is arranged; delivery starts within 2 months and completes within 9 months. The contract requires a single vendor and post-receipt inspection by SAIL-ISP Burnpur.

What documents are required for IISCO water treatment bid 2026

Submit PAN, GST certificate, bank EFT mandate, cancelled cheque, OEM authorization if needed, data sheets, and manufacturer GC. Include KPI reporting plan and NABL/ISP-lab accreditation. Provide BOM and packaging details plus expiry labeling on every chemical container.

What are the key technical specifications for cooling water chemicals

The tender covers chemicals for cooling circuit and effluent treatment, with complete supply, installation, testing, and commissioning. Ensure data sheets align with product safety data, and expiry dates are printed on each unit. Lead time is 2 months from PO, with 9 months total execution.

When is the delivery start for the BOF EWSS chemical contract

Delivery must start within 2 months of PO placement and continue through the treatment cycle, which spans a total of 9 months to complete. The contract remains valid for 11 months from PO placement.

What are the KPI reporting requirements for this tender

Vendors must submit quarterly KPI reports generated by a NABL-accredited or ISP-approved third-party laboratory, at the vendor's cost. Reports assess treatment efficacy against RFQ KPAs and are part of performance evaluation.

What are the inspection details for post-receipt verification

Post-receipt inspection is conducted by SAIL-ISP Burnpur. Pre-dispatch inspection is not specified. Suppliers must be prepared to provide data sheets and supporting test reports for verification at the consignee site.

Are multiple suppliers allowed for this water treatment project

No, the tender specifies that splitting the contract among multiple vendors is not permitted. A single party must handle supply, application, and commissioning, with all associated services for the cycle.

What warranty or performance guarantees are required

A performance guarantee is required for the efficacy of the treatment program, evaluated against KPAs in the RFQ. The vendor must demonstrate steady performance over the 9-month execution period.