Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374,Table Fan / Wall Mount Fan / Ceiling
Bhakra Beas Management Board
CENTRAL DELHI, DELHI
Progress
Quantity
10
Bid Type
Single Packet Bid
Public procurement opportunity for Field Operations Division (fod) Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2), Table Fan / Wall Mount Fan / Ceiling Mount Fan as per IS 555 (Q3) in SAMBALPUR, ODISHA. Quantity: 10 issued by. Submission Deadline: 19-05-2025 09: 00: 00. View full details and respond.
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Bhakra Beas Management Board
CENTRAL DELHI, DELHI
Indian Army
MEERUT, UTTAR PRADESH
Indian Army
Mukhyamantri Muft Ilaaj Yojana Govt. Of Haryana
KARNAL, HARYANA
Join Director Office Welfare Dpartment Tumkur
TUMKUR, KARNATAKA
Tender Results
Loading results...
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
19-May-2025, 9:00 am
Opening Date
19-May-2025, 9:30 am
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ****** Under PMA | N/A | Item Categories : Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374,Table Fan / Wall Mount Fan / Ceiling |
| L2 | ****** Under PMA | N/A | Item Categories : Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374,Table Fan / Wall Mount Fan / Ceiling |
Key insights about ODISHA tender market
The eligibility requirements include being a registered entity, demonstrating relevant experience in the manufacturing and supply of electric ceiling fans, and compliance with specified technical standards. Additionally, bidders must furnish necessary compliance certificates and ensure the financial stability to manage the order.
The products must comply with ISI standards, particularly IS 374 and IS 555. This means that the electric ceiling fans need to be equipped with BLDC motors for efficient operation. The products should meet energy efficiency criteria and perform adequately during operational assessments.
The payment terms will be stipulated during the contract finalization process and may include an advance payment along with milestone payments tied to the successful delivery and compliance verification of the products. Clarity on specific timelines will be enshrined in the contract following evaluation and selection.
Bidders are required to submit their proposals electronically through the designated platform outlined in the tender documentation. The submission must include all relevant documents in accepted formats, which typically include PDF or Word files, ensuring compliance with the detailed submission guidelines.
Yes, there are specific provisions designed to foster inclusion of MSEs and startups within this tender process. These provisions may include preferential treatment during the evaluation process or dedicated resources aimed at supporting MSE participation, promoting local economic growth and fostering innovation in procurement methodologies.
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS