Bharat Heavy Electricals Limited Castable Refractory Grade A Tender Tiruchirappalli Tamil Nadu 2025
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Progress
Quantity
15
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for Castable Refractory in Medak, Telangana (502304). The tender scope references generic quantity adjustments up to 25% and extension rules at contracted rates, with delivery timelines linked to the original order. GST treatment will follow the bidder’s assessment with reimbursement as per actuals or applicable rates, whichever is lower. Payment terms align with supplier category: MSMEs receive 100% EFT within 45 days, other MSMEs within 60 days, and non-MSMEs within 90 days. Vendors must use the SUVIDHA portal for documentation and invoice clearance. Unique terms include 10% retention on packaged items until complete delivery.
This tender emphasizes compliance with purchaser timeframes and GST adherence, while allowing minor quantity fluctuations and extended delivery calculations. The absence of BOQ items suggests a generic scope or future clarification. The organization-level procurement context is government-aligned under the Department of Heavy Industry.
Product/service: Castable refractory procurement
Quantity: Up to 25% quantity variation allowed
Standards: Not specified in tender data; prepare compliance with general BHEL refractory norms
Delivery: Start from last date of original delivery order; extended delivery as per formula
Payment: EFT terms by category; 45/60/90 days; GST reimbursement as actuals or lower rate
Retention: 10% of supply value for packaged items until completion
Qty variation up to 25% during contract and currency
MSME/Non-MSME payment timelines via Direct EFT
GST reimbursement policy and SUVIDHA portal documentation
Delivery time calculations with minimum 30 days extension
10% retention on packaged items until total delivery
Payment via Direct EFT: 45 days for MSMEs, 60 days for Medium Enterprises, 90 days for Non-MSMEs; GST reimbursement as actuals or lower rate; acceptance contingent on material receipt and SUVIDHA clearance.
Delivery period starts from the last date of original delivery order; option-driven time extension uses (additional quantity ÷ original quantity) × original delivery period with a minimum of 30 days.
10% retention on packaged items until completion; no explicit LD rate specified; ensure adherence to delivery and payment terms per contract.
MSME status and registration validity to claim faster EFT terms
Manufacturer capable of providing castable refractory materials
Compliance with GST and SUVIDHA portal submission requirements
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
The Fertilisers And Chemicals Travancore Limited
ERNAKULAM, KERALA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (if any, even though not specified)
Financial statements (audited if available)
EMD submission proof (if applicable per tender norms)
Technical bid documents (format per SUVIDHA portal guidance)
OEM authorizations or manufacturer credentials (if required by supplier category)
Key insights about TELANGANA tender market
Bidders should prepare GST registration, PAN, experience or financial documents, and technical bids per SUVIDHA portal. Ensure MSME status to claim 45-day EFT or 60/90-day terms for others. Review option clause for ±25% quantity and ensure adherence to delivery calculations.
Submit GST certificate, PAN, experience certificates, audited financial statements, EFT payment readiness proof, technical bid, and OEM authorizations if applicable. Ensure SUVIDHA portal readiness and complete document exchange by the bid deadline.
Delivery starts from the last date of the original delivery order; extended delivery time uses ((additional quantity ÷ original quantity) × original period) with a 30-day minimum. Ensure packaging complies with retention of 10% until completion.
MSMEs receive 100% Direct EFT payment within 45 days of material receipt, subject to GST compliance and SUVIDHA invoice clearance. Ensure GST is settled as per the actuals or lower applicable rate.
A 10% retention of supply value is withheld for packaged items until total supplies are completed; ensure packaging and delivery meet contractual acceptance criteria for release.
The tender data does not specify exact standards; bidders should prepare to meet general industry norms for castable refractories and align with BHEL procurement expectations, including OEM authorizations if required.
SUVIDHA serves as the document exchange and invoice clearance platform; bidders must upload required documents, address invoice objections, and ensure timely submission to avoid payment delays.
The purchaser may increase or decrease quantity by up to 25% at placement and during contract currency; both original and extended delivery timelines apply with the defined calculation method.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS