Bid Publish Date
17-Sep-2026, 7:26 pm
Bid End Date
21-Sep-2026, 8:00 pm
Location
Progress
Indian Army invites bids for the Hand Held Search Light under the Q2 category at Rajauri, Jammu & Kashmir 185131. The scope covers Supply, Installation, Testing and Commissioning of the goods. The BOQ lists 0 items, indicating a potential framework or master contract. A mandatory pre-bid meeting is scheduled for 19 Sept 2026. Key differentiators include the option to adjust quantities up to 25% of bid quantity with extended delivery periods. The procurement emphasizes OEM authorization and compliance with attached terms. This tender targets suppliers capable of end-to-end deployment and post-implementation support within contract norms.
Option to adjust quantity up to 25% with extended delivery timelines
Mandatory pre-bid meeting on 19 Sept 2026 for bidder eligibility
Bid must include OEM Authorization Certificate and non-blacklisting affidavit
Submit GST, PAN, Aadhar, Bank Mandate, MSME, product datasheet, and CA turnover
Scope includes Supply, Installation, Testing and Commissioning
Bidder must submit an OEM Authorization Certificate specific to the item (Hand Held Search Light).
Notarized, signed affidavit confirming the vendor is not blacklisted.
Pre-bid meeting on 19 Sept 2026 is mandatory for participation.
Must provide OEM authorization for the Hand Held Search Light
Must submit MSME certificate and CA-certified turnover
Must furnish GST registration, PAN, and Aadhar documents
Quantity
10
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hand Held Search Light (Q2)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Rajauri
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Rajauri | Rajauri | - | - | 10 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about JAMMU AND KASHMIR tender market
Bidders should prepare OEM authorization for the search light, notarized non-blacklisting affidavit, GST/PAN/Aadhar, Bank Mandate, MSME certificate, product datasheet, and CA turnover. The pre-bid meeting on 19 Sept 2026 is mandatory; submit complete technical and financial bids to participate.
Required documents include: OEM Authorization Certificate for the light, GST registration, PAN, Aadhar, MSME certificate, Bank Mandate Form, CA-certified turnover, Product Datasheet, and notarized non-blacklisting affidavit. Ensure pre-bid participation documents are ready before submission.
Delivery terms allow quantity adjustments up to 25% with extended periods calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Original delivery period details are not disclosed; ensure readiness for phased delivery alongside contract terms.
Obtain the official OEM Authorization Certificate naming the bidder and product. Cross-check with the OEM's letterhead, validity, and scope. The Indian Army requires this doc as part of the bid submission for eligibility.
Mandatory items include OEM authorization, non-blacklisting affidavit, GST, PAN, Aadhar, MSME, Bank Mandate, Product Datasheet, and CA turnover. Pre-bid meeting on 19 Sept 2026 is required; ensure all documents accompany the technical bid.
Scope covers end-to-end deployment: supply of handheld lights, installation at site, functional testing, and commissioning with acceptance by Indian Army. Prepare installation guidelines, on-site support, and post-commissioning documentation as part of the bid.