FRANCIS TURBINE AIR ADMISSION VALVE DRAWING NO. HINCMR20MEALD30002 / HINCMR20MEAPB30002
Nhpc Limited
CHAMBA, HIMACHAL PRADESH
Directorate Of Technical Education invites bids for FRANCIS TURBINE TEST RIG (Q3) in BHARUCH, GUJARAT. Quantity: 1. Submission Deadline: 06-02-2026 13: 00: 00. Submit your proposal before the deadline.
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Nhpc Limited
CHAMBA, HIMACHAL PRADESH
North Eastern Electric Power Corporation Limited
WEST KAMENG, ARUNACHAL PRADESH
Directorate Of Technical Education
PANCH MAHALS, GUJARAT
Commissionerate Of Technical Education
AHMEDABAD, GUJARAT
Sjvn Limited
SHIMLA, HIMACHAL PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Francis Turbine Properties | Discharge Capacity(LPM) | 1200.0 - 2000.0 Or higher |
| Francis Turbine Properties | Capacity(HP) | 1.0 - 5.0 Or higher |
| Francis Turbine Properties | Supply Head | 12.0 - 30.0 Or higher |
| Francis Turbine Properties | Rated Speed(RPM) | 1000.0 - 3000.0 Or higher |
| Supply Pump Set Properties | Motor Capacity(HP) | 5.0 - 20.0 Or higher |
| Supply Pump Set Properties | Discharge(LPM) | 1200 |
| Supply Pump Set Properties | Starter for Motor | Star Delta |
| Sump Tank Properties | Material | Mild steel |
| Others | Weight | 220.0 |
| General technical Features | General technical Features | The unit consists of Francis Turbine coupled to rope brake dynamometer., Piping system consisting of pipes, valves and fittings complete set suitable for the Francis Turbine Test Rig, Rope brake dynamometer with spring balance |
| Warranty/Services | 24 x 7 Customer Support supplied | NA |
| Warranty/Services | Time Duration for Repairing /Replace the defect during Warranty | Within one week |
| Warranty/Services | Warranty | 12, 24, 36, 48 Or higher |
| Warranty/Services | Contact details of manufacturer, supplier and local service agent are provided | Yes |
| Warranty/Services | Warranty on spare parts | 12, 18 Or higher |
| Warranty/Services | Response Time to attend the complaint during Warranty | 24 Hour |
| Installation/Trainning | Training Days | 1 |
| Installation/Trainning | Training Type | At Buyer's premise(Proper Authorized Method) |
| Environmental Properties | Maximum operating temperature | 45.0 |
| Environmental Properties | Minimum operating temperature | 5.0 |
| Test Report/Certification | Certification | ISO, CE |
| Test Report/Certification | Copies of reports and certifications to be furnished to buyer on demand at time of supplies | Yes |
| Test Report/Certification | Availability Of Test Report From Central Govt/Nabl/Ilac Accredited Lab To Prove Conformity To Specification | Yes |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
06-Feb-2026, 1:00 pm
Opening Date
06-Feb-2026, 1:30 pm
Extended Deadline
02-Feb-2026, 1:00 pm
Opening Date
02-Feb-2026, 1:30 pm
Extended Deadline
29-Jan-2026, 12:00 pm
Opening Date
29-Jan-2026, 12:30 pm
Extended Deadline
31-Dec-2025, 9:00 am
Opening Date
31-Dec-2025, 9:30 am
Extended Deadline
20-Dec-2025, 10:00 am
Opening Date
20-Dec-2025, 10:30 am
Extended Deadline
10-Dec-2025, 9:00 pm
Opening Date
10-Dec-2025, 9:30 pm
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS