Progress
Central Coalfields Limited, under Coal India Limited, invites bids for procurement of Methanometer, Multigas Detector, Toximeter, PDS and Anemometer. The estimated contract value is ₹199,656.00 with delivery at the Office of Mine Manager, Dhori Khas Colliery, Dhori Area, CCL, Bokaro, Jharkhand 829144. The tender contemplates an optional quantity increase up to 25% of bid quantity during execution at contracted rates and a delivery timeline linked to the original delivery period, with a minimum 30 days extension. The scope emphasizes data sheet alignment and supplier GST/PAN documentation, with emphasis on past project experience.
Product categories: Methanometer, Multigas Detector, Toximeter, PDS, Anemometer
Estimated contract value: ₹199,656.00
Delivery at: Office of Mine Manager, Dhori Khas Colliery, Dhori Area, CCL, Bokaro, Jharkhand 829144
Option quantity clause up to 25% increase/decrease at contracted rates
Data Sheet alignment with offered product parameters; mismatch leads to rejection
Invoices to be raised in consignee name with GSTIN of consignee
Option clause permits ±25% quantity variation at contract; delivery periods adjust accordingly
Data Sheet must match offered product specifications; mismatch risks bid rejection
Invoices must be raised to consignee with corresponding GSTIN; GST compliance essential
Past experience proof accepted as contract copy, execution certificate, or equivalent
Invoices to be issued in consignee name with consignee GSTIN; any payment terms remain as per contract.
Delivery period starts from last date of original delivery order; additional time formula applies for option quantity.
Not specified in provided data; implied adherence to standard government procurement penalties.
Not under liquidation, court receivership, or bankruptcy
GSTIN and PAN provided; EFT mandate and cancelled cheque submitted
Past project experience proven via contracts, invoices, or execution certificates
Quantity
12
Category
Methanometer
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
75
OEM Avg. Turnover
1
Past Performance
80 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Methanometer , Multigas Detector , Toximeter , PDS , Anemometer
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
365
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
829144
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ravi Kant Singh | 829144,Office of the Project Officer Dhori K Colliery CCL, Phusro-Chandrapura Road, PO Phusro Bazar | Bokaro | Jharkhand | 829144 | 3 | 365 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Methanometer
Methanometer
Multigas Detector
Multigas Detector
Toximeter
Toximeter
PDS
PDS
Anemometer
Anemometer
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Methanometer | Methanometer | 3 | pieces | mindhorik3.ccl | 5 | |
| 2 | Multigas Detector | Multigas Detector | 3 | pieces | mindhorik3.ccl | 5 | |
| 3 | Toximeter | Toximeter | 2 | pieces | mindhorik3.ccl | 5 | |
| 4 | PDS | PDS | 1 | pieces | mindhorik3.ccl | 5 | |
| 5 | Anemometer | Anemometer | 3 | pieces | mindhorik3.ccl | 5 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT mandate (bank certified)
Data Sheet of offered product(s) aligned with bid
Past Experience documents (contracts, invoices, execution certificates)
Proof of financial standing (not under liquidation/bankruptcy) with undertaking
OEM authorization or data sheets if required by the bid
Any other documents specifically requested in Terms and Conditions
Key insights about JHARKHAND tender market
Bidders must provide GSTIN, PAN, cancelled cheque, EFT mandate, and a Data Sheet aligned to the offered model. Past experience proofs (contracts/invoices) are required, with delivery to Dhori Khas Colliery, Bokaro. Ensure quantity can adjust up to 25% and pricing remains contracted rates. Follow terms on data sheet match and payment terms.
Submit GST certificate, PAN card, cancelled cheque, EFT mandate, and Data Sheet for the specified instruments. Provide past project experience proof via contract copies or execution certificates. Invoices must be raised in consignee name with the consignee GSTIN; ensure data sheet consistency with bid.
Delivery must be to Office of Mine Manager, Dhori Khas Colliery, Dhori Area, Bokaro. Original delivery period applies; option quantity increases extend time using (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Installation, if covered, at the same site.
Tender requires data alignment; while specific standards aren’t listed, suppliers should provide accurate data sheets and ensure products meet mining safety norms. Suppliers should demonstrate relevant experience and capability with the offered methanometer/multigas detector models.
No explicit EMD amount is published in the data; bidders should follow standard GEM guidelines for EMD or security deposits, ensuring compliance with vendor code creation and associated terms. Prepare refundable/adjustable security as per contract norms.
Past experience can be demonstrated via contract copies with invoices and self-certification, execution certificates, or third-party release notes. This evidence is acceptable for meeting experience criteria and validating capability to supply mining safety instruments.
Prepare a Data Sheet that precisely reflects product specifications, model numbers, and performance metrics. Cross-check against the bid’s claimed parameters; discrepancies can lead to bid rejection. Attach Data Sheet with bid documents for verification.
Delivery starts from the last date of the original delivery order. If the option quantity is exercised, the extended period is recalculated per the formula and must meet a minimum 30-day extension.