Progress
The South Central Railway in Hyderabad, Telangana invites bids for the supply, installation, testing and commissioning of a Revolving Chair (V5) in Q2. The procurement includes all cost components within the bid price, with on-site installation and commissioning expectations. The scope targets a complete turnkey delivery to SCR facilities, emphasizing vendor capability to deliver integrated SITC services and ensure operational readiness. A critical differentiator is the requirement to align with OEM channels and to demonstrate prior similar deployments to SCR or other Govt. bodies. The absence of BOQ items indicates a focus on the product category and service scope rather than enumerated quantities.
EMD/ security as per SCR ATC terms
20% of bid quantity experience with SCR/railways/PSUs in 3 years
OEM authorization required for distributors
GeM Product ID alignment mandatory for all technical specs
Turnkey SITC with on-site installation and commissioning
Not specified in provided data; bidders should refer to ATC for SCR payment schedule
Delivery and installation to SCR facility in Hyderabad; SITC executed as turnkey project per ATC
Not specified in provided data; refer to ATC for L&D terms
Demonstrated experience delivering 20% of bid quantity in a single contract to SCR/other zonal Railways/PSUs in last 3 years
OEM authorization for distributors; complete OEM details included with bid
Alignment with GeM Product ID and all technical specifications
Quantity
18
Category
Revolving Chair (V5)
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Revolving Chair (V5) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
GSTIN Number
Delivery Pincodes
500025
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjay Kumar Rai | 500025,GSTIN Number: 36AAAGM0289C1ZK, S&T Department , 7th FLOOR, RAILNILAYAM, SECUNDERABAD-025. | GSTIN Number | - | 500025 | 15 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing prior similar supply (minimum 20% of bid quantity in last 3 years)
Purchase Orders / CRAC or third-party inspection certificates (RDSO/RITES) or Gazette Officer attestation
OEM authorization certificate (if bidding through distributor/Service Provider)
GeM Product ID alignment document
Technical bid documents and any ATC compliance papers
Key insights about TELANGANA tender market
Bidders must submit GST, PAN, experience certificates, and EMD per SCR ATC. Ensure OEM authorization if bidding via distributor, and attach PO/CRAC or RDSO/RITES certificates. Align all technical specs with the GeM Product ID and provide SITC scope including installation and commissioning timelines.
Required documents include GST certificate, PAN, experience certificates showing 20% bid quantity in last 3 years to SCR/railways, PO/CRAC/inspection certificates, OEM authorization, and GeM Product ID alignment. Technical bid and ATC documents must be submitted as specified.
Eligibility requires prior similar supply to SCR or other railways totaling at least 20% of the bid quantity in a single contract over the last 3 years, along with OEM authorization if applicable and GeM ID compliance for all specifications.
Delivery is turnkey SITC to SCR facilities in Hyderabad. Installation, testing and commissioning must be completed as part of the bid, with on-site services and acceptance testing per ATC terms.
Bids must reflect GeM Product ID specifications; ensure IS or railway-specific standards are met as described in the GeM documentation and ATC. OEM authorization should accompany the bid if required by the seller model.
Payment terms are detailed in the ATC; bidders should anticipate standard SCR practices, with a timeline for SITC acceptance testing and potential milestone payments upon installation and commissioning completion.
Provide documentary PO proof to SCR or other zonal Railways/PSUs showing delivery of similar items for at least 20% of bid quantity within the last three years, accompanied by CRAC or equivalent inspection certificates.
If bidding through an authorized distributor or service provider, attach a formal OEM authorization certificate detailing name, designation, address, email, and phone number to accompany the bid submission.